This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract HW559, issued to Wood Environment & Infrastructure Solutions, Inc. (Wood) for environmental assessment services. The task assignment is part of the State & Tribal Response Program (SRP) Grant administered by FDEP on behalf of the EPA. Key personnel include Ron White, P.G. as the Contractor Representative, and Laura Barrett as the DEP Contract Manager. The work is located at the US 192 Brevard County Solid Waste Management Facility, also known as Deseret Ranch, in Melbourne, Brevard County, Florida. The project involves a Supplemental Site Assessment at site identification COM_312749; ERIC_7391.
The contract is structured as a fixed-price task assignment totaling $26,363.54 with no retainage. Work is divided into four subtasks: Subtask 1 (Project Management) at $1,882.43; Subtask 2 (SSA Work Plan/QAPP and Health and Safety Plan) at $2,737.46; Subtask 3 (SSA field activities including soil boring, monitoring well installation, and sampling) at $17,151.42; and Subtask 4 (Supplemental Site Assessment Report) at $4,592.23. The final deliverable—a Supplemental Site Assessment Report—is due by September 30, 2019, with performance execution through October 31, 2019. Field activities include collecting soil samples from 20 soil borings and installing seven additional monitoring wells to delineate arsenic and organochlorine pesticide contamination. Laboratory analysis will be performed by Advanced Environmental Laboratories of Tallahassee, Florida. Subcontractor services for preferred drilling at $4,220.00 are included. Invoicing is tied to departmental approval of work products at each subtask completion milestone.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW559
SRPPM SRP18BF594B
Wood Environment & Infrastructure Solutions, Inc. (Wood)
Ron White, P.G. Phone# (850) 298-7715
(850.245-8932Laura Barrett
COM_312749; ERIC_7391
US 192 Brevard County Solid Waste Management Facility aka Deseret Ranch
US Hwy 192 at Clayton Road, Melbourne, Brevard County, Florida
Supplemental Site Assessment he Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE), for additional contamination assessment, submitted to the Department on August 1, 2019 (revised August 2, 2019 & August 8, 2019) by Wood PLC. The final deliverable will be a Supplemental Site Assessment Report. The final deliverable must be received by FDEP no later than 9/30/19.
Supplemental Site Assessment Report (SSAR).
09/30/2019
10/31/2019
$ 26,363.54 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Justin Cross Digitally signed by Justin Cross Date: 2019.08.09 15:15:51 -04'00'
Laura K Barrett Digitally signed by Laura K Barrett Date: 2019.08.12 09:33:36 -04'00'
Jennifer Farrell Digitally signed by Jennifer Farrell Date: 2019.08.13 10:55:46 -04'00'
Geoff.Schaefer Digitally signed by Geoff.Schaefer DN: cn=Geoff.Schaefer Date: 2019.08.13 14:33:13 -04'00'
$ 26,363.54
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
QAPP Workplan 08/14/2019
Field notes, COC, GW sampling logs, MW construction logs 09/11/2019
Supplemental Site Assessment Report 09/30/2019
Department approval of QAPP Workplan (Subtask 2) $ 2,737.46
Department approval of Field notes, COC, GW sampling logs, MW construction logs (Subtask 3) $ 17,151.42
Department approval of Supplemental Site Assessment Report (Subtasks 1 & 4) $ 6,474.66
$ 26,363.54
HW559
BF594B
www.dep.state.fl.us
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: Wood PLC, HW559 Contract File
FROM: Laura Barrett, Contract Manager
DATE: August 8, 2019
SUBJECT: Negotiation Summary - SRP18, TA BF594B
Supplemental Site Assessment (SSA) Activities U.S. 192 Brevard Co. Solid Waste Management Facility (SWMF) aka: Deseret Ranch., COM_312749
This Task Assignment (TA) is intended for conducting additional SSA activities at the U.S. 192 Brevard Co. SWMF site, formerly referred to as Deseret Ranch. The scope of work builds upon the previous contamination assessment activities and was reviewed and approved by the Department’s District and Business Support Program (DBSP) for the eventual issuance of a Site Rehabilitation Completion Order (SRCO) as described in Rule 62-780.680, Florida Administrative Code (F.A.C). The services are being conducted using grant funds from the State & Tribal Response Program (SRP) Grant that is administered by DEP on behalf of EPA.
Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, fringe and other direct costs.
The cost of this subtask is $1,882.43
Subtask 2: SSA Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP) and to coordinate utility location at the proposed soil boring and monitoring well locations. The SSA QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $2,737.46.
Subtask 3 SSA Activities Under this subtask, Wood will collect soil samples from 20 soil borings at select locations to provide delineation of previously detected arsenic and organochlorine pesticide (OCP) contamination. Soil samples will be collected at the boring locations from the 0 - 6 inch and 6 inches to 2-foot intervals. Soil samples from 11 of the soil boring locations will be analyzed for arsenic using USEPA method 6010. Soil samples from the other nine soil boring locations will be analyzed for OC pesticides using USEPA method 8081. Also, seven additional monitor wells (MW-26 to MW-32) will be installed on the northern, eastern and southern edges of the groundwater plume to further determine the horizontal and vertical extent of arsenic groundwater contamination. The seven new monitor wells and 14 existing monitor wells (MW-1, MW-2, MW-
Negotiation Summary – Task Assignment (TA) BF594B US 192 Brevard Co. SWMF, aka Deseret Ranch
COM_312749
Western Brevard County SSA Activities August 8, 2019 www.dep.state.fl.us
3R, MW-4, MW-5, MW-10, MW-12, MW-13, MW-14, MW-15, MW-17, MW-19, MW-21 & MW-24)
will be sampled and analyzed for arsenic using EPA method 6020. The soil and groundwater samples will be analyzed by Advanced Environmental Laboratories (AEL) of Tallahassee, Florida.
The cost of this subtask is $17,151.42.
Subtask 4 SSA Report A Supplemental Site Assessment Report (SSAR) will be prepared detailing the field and laboratory results. This report will also include a summary of the previous contamination assessment results from the January 2018 and March 2019 events, updated figures and tables, and will also include conclusions and recommendations for any future work needed to meet Chapter 62-780, F.A.C closure requirements. The cost of this subtask is $4,592.23.
Summary DEP’s SRP Contract Manager and Wood’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $26,363.54. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Wood on August 1, 2109 (revised August 2, 2019 & August 8, 2019), as well as the Task Assignment Form for BF594B prepared by DEP. The final deliverable must be received by FDEP no later than 9/30/19.
FDEP COST ESTIMATE - HW559 - Original
Contractor: Wood E&IS Date: 7/26/2019
Task #: BF594B SubTask 1
Site: US192 Soild Waste Management Facility SubTask 2 Activity/Phase: SubTask 3 Supplemental Site Assessment Activities
Project Manager: SubTask 4 SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$46.94 Project Manager RW 14 14.1 $36.45 Program Manager 0 0 0 0 0 $46.94 Project Manager 0 0 0 0 0 $53.87 Consulting Eng/Sci GS 4 2 0 2 0 $46.94 Associate Eng/Sci RW 78 16 38 24 0 $43.59 Senior Scientist 0 0 0 0 0 $42.79 Senior Engineer 0 0 0 0 0 $28.44 Project Engineer 0 0 0 0 0 $21.49 Project Scientist 0 0 0 0 0 $23.24 Staff Scientist 0 0 0 0 0 $23.24 Staff Scientist AH 48 0 40 8 0 $35.63 Technical Editor 0 0 0 0 0 $24.59 Construction Supervisor 0 0 0 0 0 $18.78 O&M Specialist 0 0 0 0 0 $25.53 Drafter GB 10 4 0 6 0 $27.95 Senior Technician 0 0 0 0 0 $25.57 Senior Technician 0 0 0 0 0 $19.28 Project Assistant RP 2 0 0 2 0 $14.02 Field Technician 0 0 0 0 0 $22.61 Project Accountant 0 0 0 0 0 $28.57 Contracts/Purchasing 0 0 0 0 0 $12.15 Clerical 0 0 0 0 0 $18.16 Word Processing 0 0 0 0 0
Total Hours 156 14 22 78 42 0 Direct Labor $5,946.95 $660.77 $960.90 $2,713.32 $1,611.96 $0.00
Overhead 111.08% $6,605.88 $733.98 $1,067.37 $3,013.96 $1,790.57 $0.00 Gen & Admin 8.36% $497.16 $55.24 $80.33 $226.83 $134.76 $0.00 Fringe 35.00% $2,081.44 $231.27 $336.32 $949.66 $564.19 $0.00 Total Labor $15,131.43 $1,681.26 $2,444.92 $6,903.77 $4,101.48 $0.00
Other Direct Costs $297.36 $33.04 $48.05 $135.67 $80.60 $0.00 Travel
Vehicle Rental $291.00 $0.00 $291.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $656.00 $0.00 $656.00 $0.00 $0.00 Total Travel $947.00 $0.00 $947.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Preferred Drilling/Non-conventional) $4,220.00 $0.00 $4,220.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $4,220.00 $0.00 $4,220.00 $0.00 $0.00 Handling Fee $422.00 $0.00 $422.00 $0.00 $0.00 Total Subcontractor Cost $4,642.00 $0.00 $4,642.00 $0.00 $0.00
Project Management
SSA QAPP Workplan Supplemental Site Assessment Justin Cross (FDEP)/Ron White (Wood) Supplemental Site Assessment Report
REV: 02/11 AMEC Page 1
FDEP COST ESTIMATE - HW559 - Original
Contractor: Wood E&IS Date: 7/26/2019
Task #: BF594B SubTask 1
Site: US192 Soild Waste Management Facility SubTask 2 Activity/Phase: SubTask 3 Supplemental Site Assessment Activities
Project Manager: SubTask 4 SubTask 5
Totals 1 2 3 4 5
Project Management
SSA QAPP Workplan Supplemental Site Assessment Justin Cross (FDEP)/Ron White (Wood) Supplemental Site Assessment Report
Laboratory Analytical Costs $2,376.00 $0.00 $2,376.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $218.00 $0.00 $218.00 $0.00 $0.00 Total Laboratory $2,594.00 $0.00 $2,594.00 $0.00 $0.00
Field Expenses Personal Protection $168.00 $0.00 $168.00 $0.00 $0.00 Expendables $97.50 $0.00 $97.50 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $973.10 $0.00 $973.10 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,238.60 $0.00 $1,238.60 $0.00 $0.00
Subtotal $24,850.39 $1,714.30 $2,492.97 $16,461.04 $4,182.08 $0.00 Completion Fee $1,513.15 $168.13 $244.49 $690.38 $410.15 $0.00
Total Estimated Cost $26,363.54 $1,882.43 $2,737.46 $17,151.42 $4,592.23 $0.00
REV: 02/11 AMEC Page 2
SITE : Colt's Station SUBTASK 2 SSA QAPP Workplan
DATE: 6/25/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE HOURS
Project Manager
Consulting Sci GS WP / QAPP Review 2
Principal Sci RW Workplan and development of new QAPP for site 16
Proj Eng/Sci
Drafter GB Figures 4
Project Assistant
TOTAL LABOR 22
WORK DESCRIPTION
HW559 - Original
SITE :
SUBTASK 3
DATE: 7/26/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager Associate Scientist RW Round trip mobilization to site
Advance 14 soil borings by hand auger and collect 28 soil samples Install 7 monitoring wells Collect GW samples from 21 monitoring wells
Survey top of casing elevations for 7 new MWs
Staff Scientist AH Advance 14 soil borings by hand auger and collect 28 soil samples Install 7 monitoring wells Collect GW samples from 21 monitoring wells
Survey top of casing elevations for 7 new MWs
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
MW Installation Kit $737.20 week 0 $0.00
$184.30 day 1 $184.30 Shallow GW Sampling Kit $834.20 week 0 $0.00
$208.55 day 2 $417.10
Soil Assessment Kit $558.80 week 0 $0.00
$139.70 day 1 $139.70
Hand Augers $33.00 week 0 $0.00
$8.25 each 20 $165.00 GPS $101.00 week 0 $0.00
$25.25 day 1 $25.25 Level and Rod $167.00 week 0 $0.00
$41.75 day 1 $41.75 $973.10
PPE Level D H&S $28.00 (2 person x 3 days) 6 TOTAL PPE $168.00
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00 $97.00 day 3 $291.00
Truck $420.00 week 0 $0.00 $97.00 day 0 $0.00
$291.00
PER DIEM STAFF RATE UNIT USAGE
motel 2 $110.00 day 2 $440.00 meal 2 $36.00 day 3 $216.00
$656.00TOTAL PER DIEM
TOTAL VEHICLE
TOTAL EQUIPMENT
GPS all 21 sample locations
TOTAL LABOR
Collect WL measurements from 32 MWs
US192 Soild Waste Management Facility Supplemental Site Assessment Activities
Stage & De-stage for field work
GPS all 21 sample locations Round trip mobilization to site
Collect WL measurements from 32 MWs
LABORATORY COSTS
Advanced Environmental Laboratories Groundwater RATE # SAMPLES #QAQC Arsenic 6020 GW $12.50 21 3 2 dup/ 1 Eq Blank $300.00 Arsenic 6020 $12.50 dupe/Eq Blanks $0.00
Soil OC Pesticides 8081 $90.00 18 2 duplicate $1,800.00 Arsenic 6010 $11.50 22 2 duplicate $276.00
TOTAL LAB $2,376.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00 Large - 25 to 50 LBS Samples to lab $104.00 Overnight 2 $208.00 Ice $5.00 per cooler 2 $10.00
TOTAL SHIPPING $218.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Preferred Drilling Monitoring Well Installation $4,220.00
$0.00
TOTAL $4,220.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 3 $97.50
TOTAL SUPPLIES $97.50
SITE :
SUBTASK 4
DATE: 7/26/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager Consulting Sci EB Report Review 2 Principal Sci RW Site Assessment Report (Draft, Final Draft, Final) 24 Staff Scientist AS Data entry tables, GW Sample Logs, MW Construction Logs 8 Drafter GB Figures 6 Word Proc/Cler RP Report formatting, create PDF 2
42TOTAL LABOR
US192 Soild Waste Management Facility Supplemental Site Assessment Report
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .