This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) on July 13, 2021, under Contract No. HW559 to Wood Environment & Infrastructure Solutions, Inc. (Wood), a private environmental consulting firm. The task assignment authorizes Wood to conduct annual natural attenuation monitoring (NAM) and well replacement activities at the Baymeadows Place Cleaners site (ERIC_4558) located at 9551 Baymeadows Road, Jacksonville, Duval County, Florida. The contract is managed by FDEP's Kevin Kane, with Geoff Schaefer representing Wood. The task assignment is designated as DC002i under Module D000 with no associated grant number.

The scope of work comprises two subtasks: (1) Project Management, calculated at 12.5 percent of direct labor, and (2) Groundwater Monitoring, which includes annual NAM groundwater sampling from 16 micro-wells, replacement of a damaged monitoring well (MW-14), laboratory analysis for chlorinated volatile organic compounds (CVOCs) and natural attenuation parameters, and preparation of an Annual NAM Report with updated ADaPT/GIS data. The total task assignment value is $11,073.78 on a fixed-price basis, with no retainage or additional cost reimbursement. The final deliverable—the Annual NAM Report and ADaPT/GIS update submitted electronically—is due September 30, 2021, with the period of performance extending through December 31, 2021. Subcontractor costs include $1,800.00 for micro-well installation, $145.00 for Inert Drilling Waste (IDW) disposal, and $2,199.00 for laboratory analytical services provided by Advanced Environmental Laboratories. The invoice schedule provides for full payment of $11,073.78 upon FDEP approval and delivery of the Annual NAM Report and completion of Subtasks 1 and 2.

View the file

Other files

File Type Posted
CN-370000-HW559-A9.pdf PDF
CN-370000-HW559-BF005E.pdf PDF
CN-370000-HW559-BF007B.pdf PDF
CN-370000-HW559-BF01A.pdf PDF
CN-370000-HW559-BF05BCO2.pdf PDF
CN-370000-HW559-BF06BCO2.pdf PDF
CN-370000-HW559-BF06CCO1.pdf PDF
CN-370000-HW559-BF11B.pdf PDF
CN-370000-HW559-BF593B.pdf PDF
CN-370000-HW559-BF594A.pdf PDF
CN-370000-HW559-BF594DC3.pdf PDF
CN-370000-HW559-BF7BCO3.pdf PDF
CN-370000-HW559-BF8ACO2.pdf PDF
CN-370000-HW559-BF8BCO3.pdf PDF
CN-370000-HW559-CSS-23B.pdf PDF
CN-370000-HW559-CSS-24A.pdf PDF
CN-370000-HW559-CSS-25B.pdf PDF
CN-370000-HW559-CSS010A.pdf PDF
CN-370000-HW559-CSS04D.pdf PDF
CN-370000-HW559-CSS07B.pdf PDF
CN-370000-HW559-CSS10C.pdf PDF
CN-370000-HW559-CSS15A.pdf PDF
CN-370000-HW559-CSS15B.pdf PDF
CN-370000-HW559-CSS15BC1.pdf PDF
CN-370000-HW559-CSS20A-1.pdf PDF
CN-370000-HW559-CSS24A-1.pdf PDF
CN-370000-HW559-CSS29A.pdf PDF
CN-370000-HW559-DC007H.pdf PDF
CN-370000-HW559-DC009B.pdf PDF
CN-370000-HW559-DC02BCO2.pdf PDF
CN-370000-HW559-DC02BCO3.pdf PDF
CN-370000-HW559-DC02FCO1.pdf PDF
CN-370000-HW559-DC02FCO2.pdf PDF
CN-370000-HW559-DC02G.pdf PDF
CN-370000-HW559-DC02HCO2.pdf PDF
CN-370000-HW559-DC03B.pdf PDF
CN-370000-HW559-DC04BC02.pdf PDF
CN-370000-HW559-DC05A.pdf PDF
CN-370000-HW559-DC06A.pdf PDF
CN-370000-HW559-DC06B.pdf PDF
CN-370000-HW559-DC06GCO4.pdf PDF
CN-370000-HW559-DC06HCO2.pdf PDF
CN-370000-HW559-DC06J.pdf PDF
CN-370000-HW559-DC06JCO2.pdf PDF
CN-370000-HW559-DC06KCO2.pdf PDF
CN-370000-HW559-DC07BCO1.pdf PDF
CN-370000-HW559-DC08ACO2.pdf PDF
CN-370000-HW559-DC08C.pdf PDF
CN-370000-HW559-DC08DCO1.pdf PDF
CN-370000-HW559-DC08FCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93)

Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW559

D000 N/ADC002i

Wood Environment & Infrastructure Solutions, Inc.

Geoff Schaefer

(850) 245-8971Kevin Kane

ERIC_4558

Baymeadows Place Cleaners

9551 Baymeadows Rd, Jacksonville, Duval County

Monitoring

This Task Assignment authorizes Wood to conduct annual natural attenuation monitoring and well replacement in accordance with the Wood scope of work, cost estimate form, and bid documentation dated May 20, 2021 and revised June 23, 2021.

Annual NAM Report and ADaPT/GIS update (submitted electronically)

09/30/2021

12/31/2021

$ 11,073.78 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Kevin Kane Digitally signed by Kevin Kane Date: 2021.07.13 09:32:10 -04'00'

Kevin Kane Digitally signed by Kevin Kane Date: 2021.07.13 09:32:38 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.07.13 10:31:53 -04'00'

Digitally signed by Geoffrey Schaefer Date: 2021.07.13 14:16:46 -04'00'

$ 11,073.78

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual NAM Report and ADaPT/GIS update (submitted electronically) 09/30/2021

Upon delivery and FDEP approval of the Annual NAM Report and ADaPT/GIS update (submitted electronically). - Subtasks 1 and 2 $ 11,073.78

$ 11,073.78

HW559

DC002i

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum TO: HW559 Contract File

FROM: Kevin Kane, Project Manager

SUBJECT: Baymeadows Place Cleaners

ERIC_4558

HW559 Task Assignment DC002i

DATE: July 12, 2021

This Task Assignment authorizes Wood Environment & Infrastructure Solutions, Inc. to conduct site assessment activities, as outlined in the May 20, 2021 (Rev. June 23, 2021) Cost Proposal to Conduct Supplemental Site Assessment. Specific subtasks are detailed below.

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Wood Environment & Infrastructure Solutions, Inc. will conduct supplemental site assessment activities including annual natural attenuation monitoring (NAM) groundwater sampling and replacement of a damaged monitoring well (MW-14). Wood will conduct groundwater sampling in accordance with FDEP SOPs at 16 micro-wells:

MW-1, MW-2I, MW-3, MW-4, MW-5, MW-6, MW-7, MW-8, MW-10I, MW-11I, MW-12,

MW-13, MW-14, MW-16, MW-17 and DW-1. Samples will be analyzed for chlorinated volatile organic compounds (CVOCs) using USEPA Method 8260 by Advanced Environmental Laboratories in Tallahassee, Florida. IDW disposal is anticipated during this event and has been included under this subtask. The contractor was unable to obtain a third IDW disposal quote due to a lack of response from Perma-Fix Environmental Services, Inc. Additionally, samples collected from micro-wells MW-2I, MW-3, and MW-5 will be analyzed for natural attenuation parameters including total iron, ferrous iron, sulfate, sulfide, nitrate, nitrite, total organic carbon. These three wells will also be analyzed for the presence of methane, ethene and ethane using USEPA Method RSK175. Monitoring well MW-1 will also be analyzed for total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method. Upon receipt of the data, the contractor will generate an Annual NAM Report detailing the field activities, procedures, and analytical results.

Wood’s time, labor and subcontractor costs for these activities have been reviewed and are appropriate.

The level-of-effort and final cost of $11,073.78 is reasonable for the scope of services.

Task completion date is December 31, 2021.

FDEP COST ESTIMATE - HW559 - DC002i Original Contractor: Wood E&IS

Date: 5/20/2021 Task

#: HW559-DC002i SubTask 1

Site: SubTask 2 SubTask 3 SubTask 4

6090170093 SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$48.12 Project Manager RW 5 4.5 $36.45 Program Manager 0 0 0 0 0 $46.94 Project Manager RW 0 0 0 0 0 $55.49 Consulting Eng/Sci GS 0 0 0 0 0 $48.12 Principal Eng/Sci RW 2 2 0 0 0 $53.87 Senior Scientist 0 0 0 0 0 $42.79 Senior Engineer 0 0 0 0 0 $28.44 Project Engineer 0 0 0 0 0 $28.85 Project Scientist AH 16 16 0 0 0 $22.83 Staff Scientist NS 22 22 0 0 0 $19.23 Staff Scientist ZL 24 24 0 0 0 $35.63 Technical Editor 0 0 0 0 0 $24.59 Construction Supervisor 0 0 0 0 0 $18.78 O&M Specialist 0 0 0 0 0 $25.53 Drafter GB 6 6 0 0 0 $27.95 Senior Technician 0 0 0 0 0 $25.57 Senior Technician 0 0 0 0 0 $19.28 Project Assistant RP 2 2 0 0 0 $15.15 Field Technician 0 0 0 0 0 $22.61 Project Accountant 0 0 0 0 0 $28.57 Contracts/Purchasing 0 0 0 0 0 $12.15 Clerical 0 0 0 0 0 $18.16 Word Processing 0 0 0 0 0

Total Hours 77 5 72 0 0 0 Direct Labor $1,927.53 $214.17 $1,713.36 $0.00 $0.00 $0.00

Overhead 111.08% $2,141.10 $237.90 $1,903.20 $0.00 $0.00 $0.00 Gen & Admin 8.36% $161.14 $17.90 $143.24 $0.00 $0.00 $0.00 Fringe 35.00% $674.64 $74.96 $599.68 $0.00 $0.00 $0.00 Total Labor $4,904.41 $544.93 $4,359.48 $0.00 $0.00 $0.00

Other Direct Costs $96.38 $10.71 $85.67 $0.00 $0.00 $0.00 Travel

Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $364.00 $364.00 $0.00 $0.00 $0.00 Total Travel $558.00 $558.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $1,800.00 $1,800.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $145.00 $145.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,945.00 $1,945.00 $0.00 $0.00 $0.00 Handling Fee $194.50 $194.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,139.50 $2,139.50 $0.00 $0.00 $0.00

Project Management

Annual NAM Sampling Activity/Phase: Annual NAM Groundwater Sampling Project Manager: Geoff Schaefer

Baymeadows Place Cleaners

REV: 02/11 Wood Page 1

FDEP COST ESTIMATE - HW559 - DC002i Original Contractor: Wood E&IS

Date: 5/20/2021 Task

#: HW559-DC002i SubTask 1

SubTask 2 SubTask 3 SubTask 4

6090170093 SubTask 5

Totals 1 2 3 4 5

Project Management

Annual NAM SamplingSite: Baymeadows Place Cleaners Activity/Phase: Annual NAM Groundwater Sampling

Project Manager: Geoff Schaefer

Laboratory Analytical Costs $2,199.00 $2,199.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 Total Laboratory $2,303.00 $2,303.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $517.05 $517.05 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $582.05 $582.05 $0.00 $0.00 $0.00

Subtotal $10,583.34 $555.64 $10,027.70 $0.00 $0.00 $0.00 Completion Fee $490.44 $54.49 $435.95 $0.00 $0.00 $0.00

Total Estimated Cost $11,073.78 $610.13 $10,463.65 $0.00 $0.00 $0.00

REV: 02/11 Wood Page 2

HW559 - DC002i - Original

SITE : Baymeadows Place Cleaners SUBTASK 2: Annual NAM Sampling

DATE: 5/20/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Scientist RW 2 Staff Scientist NS

Staff Scientist ZL

Sample 16 wells (MW-1, 2I, 3, 4, 5, 6, 7, 8, 10I, 11I, 12, 13, 14, 16, 17 DW-1)

Drafter GB 6 Project Assistant RP Subcontractor set-up, invoicing 2 Project Scientist AH Prepare Annual NAM report summarizing 4 Qrts, tabulate data, ADaPT tables 16

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Shallow GW Sampling Kit $834.20 week 0 $0.00

$208.55 day 2 $417.10

55-gallon drum $58.20 each 1 $58.20

Transit Level and Rod $167.00 week 0 $0.00 $41.75 day 1 $41.75

$517.05

VEHICLE TYPE RATE UNIT USAGE

Equipment Van $420.00 week 0 $0.00 $97.00 day 2 $194.00

$194.00

PER DIEM STAFF RATE UNIT USAGE

motel 2 $110.00 day 1 $220.00 meal 2 $36.00 day 2 $144.00

$364.00

LABORATORY COSTS

Advanced Environmental Laboratory

PARAMETER RATE # SAMPLES #QAQC

Groundwater VOAs TCL (8260) $66.00 16 4 2 Dups / TripBlk / IDW $1,320.00

TRPH MW-1 $84.00 1 $84.00

Total Iron MW-3, MW-5, MW-2I $11.50 3 $34.50 Ferrous Iron MW-3, MW-5, MW-2I $11.50 3 $34.50 Sulfate MW-3, MW-5, MW-2I $16.00 3 Duplicate $48.00 Nitrate MW-3, MW-5, MW-2I $20.00 3 Duplicate $60.00 Nitrite MW-3, MW-5, MW-2I $20.00 3 Duplicate $60.00 Total Organic Carbon MW-3, MW-5, MW-2I $26.00 3 Duplicate $78.00

Air $0.00 Methane, ethane & ethene (RSK175)MW-3, MW-5, MW-2I) $160.00 3 0 Dup $480.00

TOTAL LAB $2,199.00

TOTAL PER DIEM

TOTAL VEHICLE

TOTAL EQUIPMENT

Stage & De-stage

TOTAL LABOR

Update GW figures with new data

Collect synoptic round of water levels from all 20 MWs

Review Annual NAM report Mobilization (Round Trip)

Collect synoptic round of water levels from all 20 MWs Mobilization (Round Trip)

Re-install MW-14 and repair damaged pad

Re-install MW-14 and repair damaged pad

Sample 16 wells (MW-1, 2I, 3, 4, 5, 6, 7, 8, 10I, 11I, 12, 13, 14, 16, 17, DW-1)

HW559 - DC002i - Original

SHIPPING ITEM RATE COSTING UNIT UNITS

Small - 0 to 25 LBS $35.00 2 Day 0 $0.00 Large - 25 to 50 LBS Samples to lab $104.00 Overnight 1 $104.00 Ice $5.00 per cooler 0 $0.00

TOTAL SHIPPING $104.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Capitol Env. Services IDW disposal $145.00 Probe Domain MW installation $1,800.00

$0.00

TOTAL $1,945.00

SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS

Expendables $32.50 per day 2 $65.00 Encore samplers $9.00 each $0.00

TOTAL SUPPLIES $65.00

‘Wood’ is a trading name for John Wood Group PLC and its subsidiaries

Wood Environment & Infrastructure Solutions, Inc.

1441 Maclay Commerce Drive, Suite 2

Tallahassee, Florida 32312 USA

T: 850-656-1293 www.woodplc.com

May 20, 2021 (Rev. June 23, 2021)

Mr. David Meyers Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400

RE: Cost Proposal to Conduct Supplemental Site Assessment Baymeadows Place Cleaners 9551 Baymeadows Road Jacksonville, Duval County, Florida FDEP FAC ID No: 16/9502088

ERIC_4558

Task Assignment No: HW559-DC002I Wood Project No: 6090170093

Dear Mr. Meyers, Wood Environment & Infrastructure Solutions, Inc., (Wood) is pleased to provide this cost proposal to conduct supplemental site assessment activities including replacing a damaged monitoring well and pad and to conduct the annual natural attenuation monitoring (NAM) groundwater sampling event at the Baymeadows Place Cleaners site located in Jacksonville, Florida (Figure 1). Wood conducted a complete groundwater sampling event at the site in May 2020 which included collecting groundwater samples from 19 micro-wells. Based on the results of the groundwater sampling activities, Wood prepared an Annual Groundwater Monitoring Report dated July 29, 2020. The May 2020 analytical results obtained from this sampling event indicated that the groundwater plume appears to have shrunk in size for the second sampling event in a row and remains on the Baymeadows Place shopping center property. Based on the reduction of the groundwater plume during the last two sampling events, Wood recommended resampling micro-wells at the site to obtain current groundwater conditions and prepare a Remedial Action Plan to address groundwater contamination. While tetrachloroethene (PCE) concentrations appear to be trending down, daughter products in some wells have increased.

In the May 2020 sampling event, six micro-wells (MW-2I, MW-3, MW-4, MW-5, MW-6 and MW-

7) reported PCE or vinyl chloride at concentrations above their groundwater cleanup target levels (GCTLs) or natural attenuation default concentrations (NADCs). Based on the fluctuating groundwater analytical results at the site, Wood recommends sampling the following 16 micro-wells at the site: MW-1, MW-2I, MW-3, MW-4, MW-5, MW-6, MW-7, MW-8, MW-10I, MW-11I, MW-12, MW-13, MW-14, MW-16, MW-17 and DW-1. These micro-wells need to be sampled again to verify sample results from the last two sampling events to ensure that the groundwater plume is delineated. This cost proposal includes the reinstallation of monitoring well MW-14 and resample the above micro-wells at the site. The cost summary spreadsheets detailing the level of effort necessary to conduct these activities are attached.

NAM Sampling Proposal May 20, 2021

Micro-well Replacement

The last time micro-well MW-14 was sampled it contained 0.87 I,V micrograms per liter (µg/l) of

PCE, however, the well was damaged sometime after this sampling event and a sample has not been able to be collected from this well, as Wood has not been able to get a water level meter or tubing into the well. The soil under the concrete pad for MW-14 and MW-18I (co-located) has been eroded by surface water runoff from the parking lot, causing the well pad to shift and sink resulting in a bent well casing. Wood will remove the damaged pad from MW-14 and MW-18I and then re-install micro-well MW-14 to 12 feet below land surface (bls) with a 10-foot pre-packed screen. After the well is installed a new well pad will be constructed over MW-14 and

MW-18I. Micro-well MW-14 will be developed until the water is sediment-free.

NAM Groundwater Sampling Event

Wood will mobilize a two-person crew to the site to conduct the groundwater sampling activities.

Prior to collecting groundwater samples, all 20 micro-wells will be opened and allowed to equilibrate and then a synoptic round of water level measurements will be collected.

Groundwater samples will then be collected from the 16 recommended micro-wells.

Groundwater sampling will adhere to the FDEP SOP FS 2200 using low flow purging techniques with a peristaltic pump and new HDPE tubing. Field parameters including temperature, pH, specific conductance, turbidity, dissolved oxygen (DO) and oxygen reduction potential (ORP) will be measured following removal of each well volume. A minimum of three well volumes will be purged from each monitoring well. If the field parameters have stabilized (i.e., three consecutive measurements are within ranges specified in SOPs) and the water turbidity is less than 20 nephelometric turbidity units (NTU) after three well volumes, the groundwater sample will be collected. If turbidity below 20 NTU cannot be attained, the well will be purged until the turbidity measurements become stable, or once five well volumes has been purged, at which time the groundwater sample will be collected.

The groundwater samples will be analyzed for CVOCs using USEPA Method 8260B. The groundwater sample collected from source area micro-well MW-1 will be analyzed for total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method to monitor for potential groundwater impacts from the EOS-PRO amendment that was placed in the source removal open excavation. Additionally, Wood recommends analyzing the groundwater samples collected from micro-wells MW-1, MW-5 and MW-2I for natural attenuation parameters including total iron, ferrous iron, sulfate, sulfide, nitrate, nitrite, total organic carbon. It is also recommended that Microseeps be utilized for these same three wells to be analyzed for the dissolved gases methane, ethene and ethane using USEPA Method RSK175. Samples will be shipped overnight under standard chain of custody protocol to Advanced Environmental

Laboratories (AEL) in Tallahassee, Florida.

All purge water will be containerized onsite in 55-gallon drums pending laboratory analysis. At the end of the event, an IDW sample will be collected from the drummed purge water and submitted for laboratory analysis. The drums will be staged at a secure location onsite pending the analytical results. Once the analytical results are received, the drums will be transported from the site for disposal.

Upon completion of the annual NAM sampling field activities and receipt of the analytical data, Wood will provide an Annual NAM Report detailing the activities and findings of the sampling

NAM Sampling Proposal May 20, 2021 event and will include updated tables with analytical data and groundwater elevations and figures showing analytical results, groundwater plumes and groundwater flow at the site, as well as conclusions and recommendations. Field notes and laboratory analytical reports will also be included.

Based on the results of the sampling events, Wood will make recommendations to address remedial actions that may be necessary at the site.

Invoice & Deliverable Schedule

Subtask Deliverable Deliverable Due Date

Invoice Amount

Annual NAM Report with updated tables & figures, field notes, MW construction log, GW sample logs, laboratory report, ADaPT files

9/30/21* $10,463.65

+ T1 $610.13

*Assuming FDEP tasks project by July 6, 2021

The total estimated cost for the proposed activities is $11,073.78. The sampling event will be conducted once a signed Task Assignment has been received.

Please let me know if there are any questions concerning this proposal.

Sincerely, Wood Environment & Infrastructure Solutions, Inc.

Ron White, P.G. Geoff Schaefer, P.E.

Principal Geologist Consulting Scientist

June 16, 2021

Ron White, P.G.

Associate Geologist wood.

1441 Maclay Commerce Drive, Suite 102 Jacksonville, FL 32312

CEWW NO. 061521.1 – NON-HAZARDOUS WASTE DRUM TRANSPORT & DISPOSAL

GREATER JACKSONVILLE & TALLAHASSEE DRY CLEANER SITES

Good day Mr. White, Capitol Environmental Services, Inc. in association with Whatever Waste, LLC is pleased to provide this proposal for non-hazardous IDW drum transportation and disposal services to you and wood., from dry cleaners site.

Scope of Services:

• Assist with waste characterization and profiling non-hazardous waste drums containing IDW liquids or solids including soils at dry cleaner sites.

• Manifest, transport & dispose of 55-gallon waste drums containing IDW liquids or solids at permitted facilities.

TRANSPORTATION & DISPOSAL UM ESTIMATED

QUANTITY

UNIT PRICE $ TOTAL $

Greater Jacksonville & Tallahassee

Non-hazardous IDW Liquids or Solids Drums Each 55-gallon 145.00

Notes:

• Disposal acceptance includes review of a submitted non-hazardous waste profile, based on generator knowledge and the appropriate analytical data.

• Demurrage is charged after 1 hour waiting time on site at an hourly rate of $ 100.00. Jacksonville no load charge is $ 125.00 if drums are not available or accessible to pick up at the site.

• Drums must be in DOT shippable condition and staged at an accessible location and on a hard surface.

• Payment terms as established between wood. and Capitol Environmental Services.

Should you require additional information, or have any questions at all, please do not hesitate to contact John Russell, or me at 352-514-0604 or bfrenchman@capitolenv.com.

Sincerely yours, Brandt Frenchman Senior Business Manager www.capitolenv.com mailto:bfrenchman@capitolenv.com file://///CESIFP01/Users/TSRedirections/bfrenchman/AppData/Roaming/Microsoft/Word/www.capitolenv.com

Clean Harbors Environmental Services, Inc.

7001 Kilo Avenue Bartow, FL 33830 www.cleanharbors.com

August 10, 2020

Attn: Mr. Ron White Wood PLC 1441 Maclay Commerce Drive, Suite 102 Tallahassee, FL 32312

Quote #3552211, Baymeadows Place Cleaners, Jacksonville, FL

Dear Mr. White:

Thank you for considering Clean Harbors Environmental Services, Inc. (Clean Harbors) for your waste management needs. We are pleased to provide you with pricing for the following waste streams. This quotation is based upon the information that you have provided.

We offer our clients a broad spectrum of environmental services and the ability to dispose of hazardous material at or through a Clean Harbors' owned and operated facility. In addition to managing your waste streams, a Clean Harbors' professional can assist you with:

• Waste Transportation & Disposal

• Laboratory Chemical Packing

• Field Services

• 24-Hour Environmental Emergency Response

• Industrial Services

• InSite Services

Clean Harbors has the appropriate permits and licenses for the acceptance and disposal of the waste streams identified within this quotation.

I look forward to servicing your environmental needs. When you are ready to place an order, please contact our Customer Service group at 800.444.4244. If you have any questions or need further assistance, you may reach me at the number below.

Sincerely, Patrick K Ethridge Account Manager Phone: 954.465.6469 ethridge.patrick@cleanharbors.com

"People and Technology Creating a Safer, Cleaner Environment"

DISPOSAL

Profile/ Waste Code Waste Description Qty UOM Price Total

CH2041374 PERCHLOROETHYLENE LIQUIDS 2 55 gallon drum $310.00 $620.00

Total $620.00

TRANSPORTATION

Dispatch Location Qty Price UOM Total

Bartow, FL Hub 2 $35.00 container *$250.00

*Minimum charge $250.00 per trip.

A demurrage charge of $107.00 per hour will apply as follows:

Number of Containers

Allowable Loading Time

1 to 10 0.5 hour(s) 11 to 15 0.75 hour(s) 16 to 25 1 hour(s) 26 to 35 1.25 hour(s) 36 to 40 1.5 hour(s) 41 to 45 1.5 hour(s) 46 to 50 1.75 hour(s) 51 to 80 2 hour(s)

ESTIMATED E-MANIFEST FEE (quantity 3) $60.00

ESTIMATED RECOVERY FEE $87.00

QUOTE TOTAL ESTIMATE $1,017.00

GENERAL CONDITIONS

1.Except where superseded by an existing services agreement the following terms and conditions apply to this quoted business.

2.Prices firm for 30 days.

3.Terms: Net 15 Days 4.Interest will be charged at 1.5% per month or the maximum allowed by law for all past due amounts.

5.Local, state and federal fees/taxes applying to the generating location/receiving facilities are not included in disposal pricing and will be added to each invoice as applicable.

6.Materials subject to additional charges if they do not conform to the listed specifications.

7.All drums for disposal must be in D.O.T. approved containers and in good condition.

August 10, 2020 Clean Harbors Quote #3552211

GENERAL CONDITIONS

8.All containers must be marked with Clean Harbors' profile number.

9.Clean Harbors will provide a manifest and necessary labels for transportation with a charge of

$1.25 per label.

10.Electronically submitted profiles will be approved at no charge. Paper profiles will be charged at

$75.00 each.

11.Clean Harbors supports many invoice delivery options (E-mail, Electronic Invoicing, EDI, Etc.).

Pricing is based on Clean Harbors' standard invoice delivery method of E-mail. If another delivery method is required there could be an additional service fee per invoice. Any alternate delivery methods must be reviewed and approved by Clean Harbors prior to acceptance and implementation.

12.Compressed gas cylinders requiring special handling due to inoperable valves will be assessed an additional charge of $400.00 per cylinder. Cylinders larger than medium size will be quoted case by case. This charge may be sent as supplemental invoice.

13.A variable Recovery Fee (that fluctuates with the DOE national average diesel price), currently at 10.0%, will be applied to the total invoice. For more information regarding our recovery fee calculation please go to: www.cleanharbors.com/contact-us/customer-resources.

14.Transportation rates are based on milkrun pickups. Additional costs may be incurred for out of milkrun service.

15.Pickups that require same day or next day service may be subject to additional charges.

16.Pickups cancelled within 72 hours of scheduling will be subject to cancellation charges.

17.Transportation charges to the final disposal facility will be charged in addition to local transportation to our truck to truck hub/local facility and will vary with logistics and routing.

18.Out of Service (OSD) for PCB incinerables should be clearly identified in Section 14 of the manifest. Prices for these items are only effective if received within 6 months of the OSD.

19.Standard disposal conversions (excluding minimums) apply to containers other than 5 gallon drums: 6-20g 60%, 21-30g 75%, 31-55g 100%, 56-85g 145%, FBIN 350%, TOT2(<300gal

TOTE) 500%, TOTE 630%.

20.In the event that legal or other action is required to collect unpaid invoice balances, Customer agrees to pay all costs of collection, including reasonable attorneys' fees, and agrees to the jurisdiction of the Commonwealth of Massachusetts.

21.The USEPA implemented the E-manifest system in June 2018 and charges the receiving TSDF a fee per manifest that is subject to change at USEPA’s discretion. Clean Harbors currently charges $20 per manifest to cover this cost on every invoice. This charge is subject to change if USEPA applies increased charges in the future.

22.Unless specifically noted, these rates are not valid where Prevailing Wages and / or certified payroll apply. Any Prevailing Wage rates will be quoted on a case-by-case basis.

August 10, 2020 Clean Harbors Quote #3552211

WASTE CLASSIFICATIONS SPECIFICATIONS

Waste Code Description

CH2041374 PERCHLOROETHYLENE LIQUIDS

Less than one inch solids in the drum Less than 5 percent other chlorinated solvents Flash point greater than 140°F No PCB's or pesticides pH between 5-10 Minimum yield 30 percent Must be pumpable

PRIMARY DISPOSAL METHOD: SOLVENT RECOVERY

ACKNOWLEDGEMENT

Your signature below indicates your acceptance of the pricing and terms detailed in the quote above.

Thank you for the opportunity to be of service.

Signature PO# Date

Print Name

Quote # 3552211

August 10, 2020 Clean Harbors Quote #3552211

From: Schaefer, Geoff D.

To: Kane, Kevin Subject: FW: Dryclean Site IDW Quote Date: Monday, June 28, 2021 2:22:52 PM Attachments: image001.png

Kevin, See below. This was for all our Jax sites. Baymeadows, Harveys, and Sunbeam.

v/r, Geoff Schaefer +01 850 298 7707 (d) +01 850 591 9249 (m)

From: White, Ron D. <ron.white@woodplc.com> Sent: Monday, June 28, 2021 2:17 PM To: Schaefer, Geoff D. <geoff.schaefer@woodplc.com> Subject: FW: Dryclean Site IDW Quote

FYI

Ron White, P.G.

Associate Geologist 1441 Maclay Commerce Drive, Suite 102 Tallahassee, Florida 32312 Direct: +1 (850) 298-7715 Mobile: +1 (850) 443-2341 www.woodplc.com

From: White, Ron D.

Sent: Wednesday, June 16, 2021 10:10 AM To: mdale@perma-fix.com; ssierens@perma-fix.net Subject: FW: Dryclean Site IDW Quote

Hey Dale

Can you send me a quote with rates for disposal that I can use for drycleaning sites for like the next 6 months? Maybe something with a cost for up to _X_ drums and then a quote per drum for multiple drums over _X_ drums. Please consider all to be non-hazardous.

Please let me know if you have any questions. These sites will be located in North Florida, mainly Jacksonville mailto:geoff.schaefer@woodplc.com mailto:Kevin.Kane@FloridaDEP.gov file:////c/www.woodplc.com mailto:mdale@perma-fix.com mailto:ssierens@perma-fix.net

Thanks Ron

Ron White, P.G.

Associate Geologist 1441 Maclay Commerce Drive, Suite 102 Tallahassee, Florida 32312 Direct: +1 (850) 298-7715 Mobile: +1 (850) 443-2341 www.woodplc.com

This message is the property of John Wood Group PLC and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorized use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system.

If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@woodplc.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications.

Please click http://www.woodplc.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France.

As a recipient of an email from a John Wood Group Plc company, your contact information will be on our systems and we may hold other personal data about you such as identification information, CVs, financial information and information contained in correspondence. For more information on our privacy practices and your data protection rights, please see our privacy notice at https://www.woodplc.com/policies/privacy-notice file:////c/www.woodplc.com http://www.woodplc.com/email-disclaimer https://www.woodplc.com/policies/privacy-notice

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Consultant Name: Wood Group

Site Name and Location: Baymeadows Place Cleaner, Jacksonville, FL Date: 5/14/21

PROPOSED SCOPE OF WORK:

Remove 2' x 4' pad and manhole

Over drill existing 1" x 14' MW with 4.25" ID/8.25" OD Auger, install new 1" x 14' MW with 10' prepacked screen, pad and manhole

Drum soil & water

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Equipment Type: Geoporbe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

Direct Push Daily Rate 1 - on-site day whole day $1,575.00 $0.00

Direct Push Half-Day Rate 1 - on-site half day half day $1,175.00 1 $1,175.00 Auger Attachment, 2" Well Install per foot $12.50 $0.00 Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5" each $80.00 2 $160.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5" each $25.00 $0.00 Well Riser (includes all materials) ID 1" 5' Length each $15.00 1 $15.00 Well Completion (includes MH w/ cover, concrete pad, and locking well cap) per well $200.00 1 $200.00

Mobilization roundtrip $500.00 1 $500.00 Per Diem per crew / per night $0.00 $0.00 DOT Approved 55-gal Drum each $50.00 2 $100.00 Permits each $150.00 1 $150.00 Other (specify) $0.00 Other (specify) $0.00 Other (specify) $0.00

TOTAL QUOTE PRICE $2,300.00

Notes:

1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time, steamcleaning decon, and grouting.

Days to Complete Scope of Work: .5 Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 5/14/21

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Contractor : Wood / Ron White/ Tallahassee

Site Name and Location: ______Baymeadows Cleaners/ Jacksonville, FL__________ Date:__5/17/21 FAC ID#:

PROPOSED SCOPE OF WORK: E4?

Abandon one 14-foot 1-inch MW in a two well cluster

Remove one 2’ by 4’ concrete pad

Install one 14-foot, 1-inch prepacked MW with 10 feet of screen next to remaining existing well

Replace 2’x4’ pad over new well and existing well

Develop and complete MW

Unit Unit Rate Number of Units Extended Price

Equipment Type: ___Geoprobe7822DT_______________

Direct Push Daily Rate 1 - on-site day 6610 DT whole day $1,800.00 1 $1,800.00

Direct Push Daily Rate 1 - on-site day 540 MT includes 3rd man on site whole day $1,000.00 $0.00

Auger Attachment, 2" Well Install per foot $10.00 $0.00

Pre-Packed Well Screen (includes all materials) ID ______ 5' Length Pack OD _______ each $85.00 $0.00

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD _______ each $30.00 $0.00

Well Riser (includes all materials) ID ______ 5' Length each $10.00 $0.00

Well Completion (includes MH w/ cover, concrete pad, and locking well cap) per well $100.00 $0.00

Mobilization roundtrip $200.00 $0.00

Per Diem per crew / per night $230.00 $0.00

DOT Approved 55-gal Drum estimate $50.00 $0.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $100.00 $0.00

2" well installation(Includes decon,screen, riser, sand pack, seal, and grout) per foot $5.00 $0.00

Night work per 2 man crew for 6620 DT per foot $600.00 $0.00

Water Tank day $100.00 $0.00

Core drill of concrete <12" each $50.00 $0.00

TOTAL QUOTE PRICE $1,800.00

Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time, steamcleaning decon, and grouting.

2. Actual cost only (no markup allowed).

Days to Complete Scope of Work: ___1____ Project No.: _________________________

Subcontract Company Name: _____Probe Domain, Inc.____________________________________________________________________

Subcontract Mailing Address: _____3020 Thunder Road / Middleburg, FL 32068___________________________________

Signature and Title of Person Submitting Quote: ____PRESIDENT/_James R. Laymon / James R. Laymon_____ Date: ___5/17/21