This is a Task Assignment Notification Form (DEP Contract No. HW559, Task Assignment BF11B) issued by the Florida Department of Environmental Protection to AMEC Foster Wheeler Environment & Infrastructure, Inc. for site assessment activities at Beck Ranch Park in Osteen, Volusia County, Florida. The contract involves the DEP Brownfields Section, with Ron White serving as the AMEC contractor representative and Carrie L. Kruchell as the DEP Contract Manager. The document establishes the scope, deliverables, schedule, and pricing for Phase 1 activities related to groundwater monitoring at the contaminated site.
The task involves four subtasks totaling $49,624.12 on a fixed-price basis: SubTask 1 ($2,884.47) covers project management; SubTask 2 ($15,142.46) addresses the first groundwater sampling event scheduled for January 2018; SubTask 3 ($11,590.70) covers monitoring well installation; and SubTask 4 ($15,865.92) addresses the second groundwater sampling event scheduled for April 2018. The final deliverable, a Groundwater Sampling Summary Report (SubTask 5, $4,140.57), is due June 10, 2018. The work includes 2 quarters of quarterly groundwater monitoring, sampling of up to 3 shallow monitoring wells and deeper groundwater aquifer wells, installation of monitoring wells at depths TD=30 feet and TD=45 feet, and laboratory analysis of samples for pesticides and arsenic. Subcontractor costs for drilling services total $6,105.00. The invoice schedule is tied to approval of interim and final deliverables, with the total task assignment value not to exceed $49,624.12.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FDEP COST ESTIMATE - HW559
Contractor: Amec Foster Wheeler
Date: 12/7/2017
Task #: BF11B SubTask 1
Site: Beck Ranch Park Site SubTask 2
Activity/Phase: SubTask 3 Monitoring Well Installation
Project Manager: SubTask 4
SubTask 5 Groundwater Monitoring Summary Report
Totals 1 2 3 4 5
Labor Rate Category
$44.68 Project Manager 23 22.7
$36.45 Program Manager 0 0 0 0 0
$43.59 Project Manager 2 2 0 0 0
$65.18 Consulting Eng/Sci 2 0 0 0 2
$44.68 PM /Associate Eng/Sci 20 0 0 0 20
$43.59 Senior Scientist 0 0 0 0 0
$42.79 Senior Engineer 0 0 0 0 0
$28.44 Project Engineer 0 0 0 0 0
$21.49 Project Scientist 140 53 27 54 6
$26.00 Project Scientist 0 0 0 0 0
$20.71 Staff Scientist 0 0 0 0 0
$35.63 Technical Editor 0 0 0 0 0
$24.59 Construction Supervisor 0 0 0 0 0
$18.78 O&M Specialist 0 0 0 0 0
$25.53 Drafter 14 4 0 0 10
$27.95 Senior Technician 128 49 25 54 0
$25.57 Senior Technician 0 0 0 0 0
$18.16 Project Assistant 0 0 0 0 0
$14.02 Field Technician 0 0 0 0 0
$22.61 Project Accountant 2 0 0 0 2
$28.57 Contracts/Purchasing 0 0 0 0 0
$12.15 Clerical 0 0 0 0 0
$18.16 Word Processing 0 0 0 0 0
Total Hours 331 23 108 52 108 40
Direct Labor $9,112.48 $1,012.50 $2,697.82 $1,278.98 $2,669.76 $1,453.42
Overhead 111.08% $10,122.15 $1,124.69 $2,996.74 $1,420.69 $2,965.57 $1,614.46
Gen & Admin 8.36% $761.81 $84.65 $225.54 $106.92 $223.19 $121.51
Fringe 35.00% $3,189.38 $354.38 $944.24 $447.64 $934.42 $508.70
Total Labor $23,185.82 $2,576.22 $6,864.34 $3,254.23 $6,792.94 $3,698.09
Other Direct Costs $455.63 $50.63 $134.89 $63.95 $133.49 $72.67
Travel
Vehicle Rental $1,067.00 $388.00 $291.00 $388.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $2,224.00 $948.00 $328.00 $948.00 $0.00
Total Travel $3,291.00 $1,336.00 $619.00 $1,336.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $6,105.00 $0.00 $6,105.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $6,105.00 $0.00 $6,105.00 $0.00 $0.00
Handling Fee $610.50 $0.00 $610.50 $0.00 $0.00
Total Subcontractor Cost $6,715.50 $0.00 $6,715.50 $0.00 $0.00
Project Management
First Groundwater Sampling Event
Site Assessment
Ron King (DEP)/Ron White (Amec) Second Groundwater Sampling Event
REV: 02/11 AMEC Page 1
FDEP COST ESTIMATE - HW559
Contractor: Amec Foster Wheeler
Date: 12/7/2017
Task #: BF11B SubTask 1
Site: Beck Ranch Park Site SubTask 2
Activity/Phase: SubTask 3 Monitoring Well Installation
Project Manager: SubTask 4
SubTask 5 Groundwater Monitoring Summary Report
Totals 1 2 3 4 5
Project Management
First Groundwater Sampling Event
Site Assessment
Ron King (DEP)/Ron White (Amec) Second Groundwater Sampling Event
Laboratory
Analytical Costs $8,917.50 $3,997.50 $0.00 $4,920.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $1,744.00 $872.00 $0.00 $872.00 $0.00
Total Laboratory $10,661.50 $4,869.50 $0.00 $5,792.00 $0.00
Field Expenses
Personal Protection $504.00 $224.00 $112.00 $168.00 $0.00
Expendables $325.00 $130.00 $65.00 $130.00 $0.00
Equipment (Drilling related) $435.60 $0.00 $435.60 $0.00 $0.00
Equipment (Analytical related) $1,731.50 $897.30 $0.00 $834.20 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $2,996.10 $1,251.30 $612.60 $1,132.20 $0.00
Subtotal $47,305.55 $2,626.85 $14,456.03 $11,265.28 $15,186.63 $3,770.76
Completion Fee $2,318.57 $257.62 $686.43 $325.42 $679.29 $369.81
Total Estimated Cost $49,624.12 $2,884.47 $15,142.46 $11,590.70 $15,865.92 $4,140.57
REV: 02/11 AMEC Page 2
SITE :
SUBTASK 2
DATE: 12/7/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager RW 2
Project Scientist AP 9
Senior Technician PC 9
Drafter GB 4
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Shallow GW Sampling Kit $834.20 week 0 $0.00
$208.55 day 4 $834.20
GPS $101.00 week 0 $0.00
$25.25 day 1 $25.25
Metal Detector $151.40 week 0 $0.00
$37.85 day 1 $37.85
$897.30
PPE Level D H&S $28.00 (2 person x 4 days) 8 TOTAL PPE $224.00
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00
$97.00 day 4 $388.00
Truck $420.00 week 0 $0.00
$97.00 day 0 $0.00
$388.00
PER DIEM STAFF RATE UNIT USAGE
motel 2 $110.00 day 3 $660.00 meal 2 $36.00 day 4 $288.00
$948.00
LABORATORY COSTS
Advanced Environmental Laboratories
Groundwater RATE # SAMPLES #QAQC
OC Pesticides 8081 $90.00 34 5 4 dupe/ 1 Eq Blank $3,510.00
Arsenic 6010 $12.50 34 5 4 dupe/ 1 Eq Blank $487.50
TOTAL LAB $3,997.50
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00
Large - 25 to 50 LBS Samples to lab $104.00 Overnight 8 $832.00
Ice $5.00 per cooler 8 $40.00
TOTAL SHIPPING $872.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
TOTAL $0.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 4 $130.00
TOTAL SUPPLIES $130.00
TOTAL LABOR
Mobilization to site (Rouond Trip)
Locate 34 MWs, Water Elevation Survey
Locate 34 MWs, Water Elevation Survey
Tabulate Lab Data for Deliverable
Sample 34 MWs
TOTAL PER DIEM
TOTAL VEHICLE
TOTAL EQUIPMENT
Beck Ranch Park Site
First Groundwater Sampling Event
Sample 34 MWs
Update Figures for Deliverable
Deliverable (Tables & Figures) Review & Submittal
Mobilization to site (Rouond Trip)
SITE :
SUBTASK 3
DATE: 12/7/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager
Project Scientist 9
Senior Technician 9
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
MW Installation Kit $737.20 week 0 $0.00
$184.30 day 2 $368.60
GPS $101.00 week 0 $0.00
$25.25 day 1 $25.25
Level and Rod $167.00 week 0 $0.00
$41.75 day 1 $41.75
$435.60
PPE Level D H&S $28.00 (2 person x 2 days) 4 TOTAL PPE $112.00
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00
$97.00 day 3 $291.00
Truck $420.00 week 0 $0.00
$97.00 day 0 $0.00
$291.00
PER DIEM STAFF RATE UNIT USAGE
motel 1 $110.00 day 2 $220.00 meal 1 $36.00 day 3 $108.00
$328.00
LABORATORY COSTS
Advanced Environmental Laboratories
Groundwater RATE # SAMPLES #QAQC
OC Pesticides 8081 $90.00 $0.00
Arsenic 6010 $12.50 $0.00
TOTAL LAB $0.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00
Large - 25 to 50 LBS Samples to lab $104.00 Overnight $0.00
Ice $5.00 per cooler $0.00
TOTAL SHIPPING $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Probe Domain Well Install $6,105.00
TOTAL $6,105.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 2 $65.00
TOTAL SUPPLIES $65.00
Top of Casing Survey
Beck Ranch Park Site
Monitoring Well Installation
Top of Casing Survey
Mobilization to site (Round trip)
Monitoring Well Installation & Development
Mobilization to site (Round trip)
Monitoring Well Installation & Development
Monitoring Well Construction Logs for Deliverable
TOTAL EQUIPMENT
TOTAL VEHICLE
TOTAL PER DIEM
TOTAL LABOR
SITE : Beck Ranch Park Site
SUBTASK 4
DATE: 12/7/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager RW
Project Scientist AP 9
Senior Technician PC 9
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Shallow GW Sampling Kit $834.20 week 0 $0.00
$208.55 day 4 $834.20
GPS $101.00 week 0 $0.00
$25.25 day 0 $0.00
$834.20
PPE Level D H&S $28.00 (2 person x 3 days) 6 TOTAL PPE $168.00
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00
$97.00 day 4 $388.00
Truck $420.00 week 0 $0.00
$97.00 day 0 $0.00
$388.00
PER DIEM STAFF RATE UNIT USAGE
motel 2 $110.00 day 3 $660.00 meal 2 $36.00 day 4 $288.00
$948.00
LABORATORY COSTS
Advanced Environmental Laboratories
Groundwater RATE # SAMPLES #QAQC
Pesticides 8141 $90.00 42 6 5 dupe/ 1 Eq Blank $4,320.00
Arsenic 6010 $12.50 42 6 5 dupe/ 1 Eq Blank $600.00
TOTAL LAB $4,920.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00
Large - 25 to 50 LBS Samples to lab $104.00 Overnight 8 $832.00
Ice $5.00 per cooler 8 $40.00
TOTAL SHIPPING $872.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00
TOTAL $0.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 4 $130.00
TerraCore $7.30 each $0.00
TOTAL SUPPLIES $130.00
Second Groundwater Sampling Event
TOTAL EQUIPMENT
TOTAL VEHICLE
TOTAL PER DIEM
Water Elevation Survey
Mobilization to site (Rouond Trip)
Mobilization to site (Rouond Trip)
Water Elevation Survey
Sample 42 MWs
Sample 42 MWs
TOTAL LABOR
SITE : Beck Ranch Park Site
SUBTASK 5 Groundwater Monitoring Summary Report
DATE: 12/7/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE HOURS
Principal Sci 2
Assoc. Scientist RW 20
Tech Editor
Project Scientist AP 6
Drafter GB 10
Project Assistant RP 2
TOTAL LABOR 40
WORK DESCRIPTION
Technical review
Groundwater Summary Report Summarizing All Three Events logs, tables
Figures
SI Text (draft, final, electric copy .PDF)
| MX-3570N_20171213_143803, Executed HW559 - TA BF11B, Beck Ranch |
| Beck Ranch SA CP 12.7.17 |