This is a Task Assignment Notification Form (TA BF591F) issued under DEP Contract No. HW559 by the Florida Department of Environmental Protection (FDEP) to Wood Environment & Infrastructure Solutions, Inc. for supplemental site assessment activities at the former Colt's Station site in Trenton, Gilchrist County, Florida. The contract is funded through the State & Tribal Response Program (SRP) Grant administered by FDEP on behalf of the EPA. Justin Cross serves as the FDEP Contract Manager, with Ron White, P.G., as the contractor representative.
The task assignment encompasses four subtasks with a total value of $8,641.47 on a fixed-price basis: Subtask 1 ($626.14) covers project management; Subtask 2 ($758.18) includes preparation of a Quality Assurance Project Plan and Workplan with Health and Safety Plan; Subtask 3 ($4,663.34) consists of groundwater sampling from seven existing monitoring wells (MW-1 through MW-7) with depth-to-water measurements and analysis for volatile organic compounds, polynuclear aromatic hydrocarbons, total recoverable petroleum hydrocarbons, and lead; and Subtask 4 ($2,593.81) involves preparation of a Supplemental Site Assessment Report. The final deliverable is due by January 21, 2022, with the period of performance extending through February 4, 2022. Laboratory analysis will be conducted by Advanced Environmental Laboratories of Tallahassee, Florida, and invoicing is contingent upon FDEP approval of each deliverable milestone.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW559
SRPPM SRP18BF591F
Wood Environmental & Infrastructure Solutions, Inc.
Ron White, P.G.
(850) 245-8968Justin Cross
21/8508484, ERIC_5564
Gilchrist County / Former Colt's Station
1022 E. Wade Street, Trenton, Gilchrist County
Supplemental Site Assessment
This Task Assignment (TA) is issued in accordance with the Cost Proposal submitted by Wood PLC on September 24, 2021, revised on October11, 2021. This TA includes Project Management, Preparation of a Workplan/Quality Assurance Project Plan, and Fieldwork with Groundwater Sampling of seven (7) existing monitoring wells along with the collection of depth-to-water data. The final deliverable is Supplemental Site Assessment Report.
Supplemental Site Assessment Report
01/21/2022
02/04/2022
$ 8,641.47 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Justin Cross Digitally signed by Justin Cross Date: 2021.10.27 10:39:30 -04'00'
Justin Cross Digitally signed by Justin Cross Date: 2021.10.27 10:40:05 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.10.27 11:24:19 -04'00'
Ron.White Digitally signed by Ron.White DN: cn=Ron.White Date: 2021.10.27 11:32:01 -04'00'
$ 8,641.47
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Inspection Quality Assurance Project Plan/Workplan 11/05/2021
Draft Data Summary Tables/Figures and Field Notes, Sampling Logs, and Chain of Custody(s) 12/17/2021
Final Supplemental Site Assessment Report 01/21/2022
FDEP Approval of Site Inspection QAPP/Workplan (Subtask 2) $ 758.18
FDEP Approval of Field Notes, Sampling Logs, and Chain of Custody(s) (Subtasks 3) $ 4,663.34
FDEP Approval of Supplemental Site Assessment Report (Subtasks 1 & 4) $ 3,219.95
$ 8,641.47
HW559
BF591F
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Wood PLC, HW559 Contract File
FROM: Justin Cross, Contract Manager
DATE: October 19, 2021
SUBJECT: Negotiation Summary – SRP 18 Task Assignment (TA) BF591F
Gilchrist County/Former Colt’s Station Facility ID # ERIC_5549 Supplemental Site Assessment Activities
The Scope of Work (SOW) for this TA, as agreed by both FDEP and Wood PLC, is intended for the sampling of seven monitoring wells and collecting depth to water measurements at the former Colts Station site in Gilchrist County in support of issuance of a conditional Site Rehabilitation Completion Order (CSRCO) as described in Rule 62- 780.680, Florida Administrative Code (F.A.C). This work uses grant funds from the State & Tribal Response Program (SRP) Grant that is administered by DEP on behalf of EPA.
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, fringe and other direct costs. The agreed upon cost of this subtask is $626.14.
Subtask 2: QAPP/Work Plan, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Quality Assurance Project Plan (QAPP)/Work Plan, a Health and Safety Plan (HASP). The QAPP/Work Plan will provide a brief summary of the scope of work, tables and figures showing the proposed sample locations, and laboratory and field quality assurance measures and procedures. The agreed upon cost of this subtask is $758.18.
Subtask 3: SSA Activities Under this subtask, Wood will collect groundwater samples from the seven existing monitoring wells (MW-1 through MW-7) at the site. Depth to water measurements will also be collected. The monitoring wells will be sampled and analyzed for volatile organic compounds (VOCs) (including MTBE) using the United States Environmental Protection Agency (USEPA) Method 8260, polynuclear aromatic hydrocarbons (PAHs) using USEPA Method 8270, total recoverable petroleum hydrocarbons (TRPHs) using the FL- PRO method and lead using USEPA Method 6010 by Advanced Environmental Laboratories (AEL) of Tallahassee, Florida. The agreed upon cost of this subtask is $4,663.34.
Negotiation Summary – Task Assignment (TA) BF591F Gilchrist County / Former Colt’s Station Gilchrist County Supplemental Site Assessment October 19, 2021 www.FloridaDEP.gov
Subtask 4: SSA Report Upon completion of the field activities and receipt of the analytical data, Wood will prepare a Supplemental Site Assessment Report Addendum for the AST area detailing the findings of the most recent SSA activities as described above including updated site figures and tables with historical and new data included for comparison purposes, as well as conclusions and recommendations for the site. The agreed upon cost of this subtask is $2,593.81.
Summary The Department’s SRP Contract Manager and Wood’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $8,641.47. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE letter provided by Wood on September 24, 2021 (revised October 11, 2021), as well as the Task Assignment Form for BF601C prepared by the Department. The final deliverable must be received by the Department no later than December 31, 2022.
Wood Environment & Infrastructure Solutions, Inc.
2533 Greer Road, Suite 6
Tallahassee, Florida 32308 USA
T: 850-656-1293 www.woodplc.com
September 24, 2021
Mr. Justin Cross Florida Department of Environmental Protection State Brownfields Program 2600 Blair Stone Road Tallahassee, FL 32399-2400
RE: Cost Proposal to Conduct Supplemental Site Assessment Activities
Former Colt’s Station Site Trenton, Gilchrist County, Florida FDEP FAC ID No: 21/8508484
Dear Justin, Wood Environment & Infrastructure Solutions, Inc., (Wood) is pleased to provide this cost proposal as requested to conduct additional assessment activities at the former Colt’s Station site. Please find attached the cost summary spreadsheets for the workplan and QAPP package for the above-referenced site. The Workplan/QAPP will include a history of the site, site background including previous assessments, a site location map and site map with proposed monitoring well locations.
Subtask 1: Project Management This subtask is for project management and includes a percentage of the overall project fees and has been negotiated as a contract rate.
Subtask 2: Supplemental Site Assessment (SSA) Cost Proposal This task covers the level of effort to prepare the QAPP and this cost proposal. The SSA QAPP Workplan will provide a summary of the scope of work and include tables and figures showing the proposed sample locations.
Subtask 3: SSA Activities Under this subtask, Wood will collect groundwater samples from the seven existing monitoring wells (MW-1 through MW-7) at the site. Depth to water measurements will also be collected.
The monitoring wells will be sampled and analyzed for volatile organic compounds (VOCs) (including MTBE) using the United States Environmental Protection Agency (USEPA) Method 8260, polynuclear aromatic hydrocarbons (PAHs) using USEPA Method 8270, total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method and lead using USEPA Method 6010 by Advanced Environmental Laboratories (AEL) of Tallahassee, Florida.
Subtask 4: SSA Report Upon completion of the field activities and receipt of the analytical data, Wood will prepare a Supplemental Site Assessment Report Addendum for the site detailing the findings of the most recent SSA activities as described above including updated site figures and tables with historical and new data included for comparison purposes, as well as conclusions and recommendations for the site.
The total estimated cost for the proposed activities is $8,641.47. The supplemental site assessment activities can be conducted once a signed Task Assignment has been received. It is estimated to take one day for the groundwater sampling including round trip travel.
Please call to discuss if you have any questions.
Sincerely, Wood Environment & Infrastructure Solutions, Inc.
Ron White, P.G. Geoff Schaeffer, P.E.
Principal Geologist Contract Manager
Septic drain field
Septic tank
Underground storage tanks (4) (removed)
Concrete
Aboveground storage tanks (3) (removed)
Dispensers (removed)
FORMER COLT'S STATION
Asphalt
Light pole
Light pole
Auto service area
Gopher Tortoise burrow location (removed)
Approximate location of product lines (removed)
Drain for secondary containment
Vent pipes
N
Excavation area Approximate excavation area (2003)
LEGEND:
Soil boring location and designation (July 2018)
Piezometer location and designation Monitoring well location and designation
Benzene Toluene Ethylbenzene Total Xylenes Methyl Tert-Butyl Ether Ethylene Dibromide Naphthalene 1-Methylnaphthalene 2-Methylnaphthalene Total Recoverable Petroleum Hydrocarbons Total Lead
B T E X
MTBE
EDB
N 1-M 2-M
TRPH
PB
No exceedancesNE
Analyte, if present, was at a concentration below its method detection limit
U
The reported value is between the laboratory method detection limit and the laboratory practical quantitation limit.
I
Not analyzedNA Synthetic Precipitation Leaching ProcedureSPLP
NOTES:
1. Concentrations reported in micrograms per liter (µg/l).
2. Bold and red concentrations exceed Groundwater Cleanup Target Levels (GCTLs).
3. Blue shade represents SPLP screening locations.
Pending analytical results from laboratory*
Fence
3.1
Approximate extent of groundwater contamination exceeding GCTLs2.3 3.3
Proposed monitoring well location and designation
FIGURE:
DATECHECKED
REVISIONSNO. DATE
DESIGNED DRAWN
Environment & Infrastructure Solutions, Inc.
Tallahassee, Florida 850-656-1293
GROUNDWATER ANALYTICAL DATA
FORMER COLT'S STATION
SUPPLEMENTAL SITE ASSESSMENT REPORT
1022 EAST WADE STREET
TRENTON, GILCHRIST COUNTY, FLORIDA
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
RW GB
0 Sep-20 Initial Submittal
7,900
AutoCAD SHX Text
SB-60A
AutoCAD SHX Text
SB-59A
AutoCAD SHX Text
MW-3
AutoCAD SHX Text
MW-2
AutoCAD SHX Text
MW-1
AutoCAD SHX Text
MW-4
AutoCAD SHX Text
MW-5
AutoCAD SHX Text
MW-6
AutoCAD SHX Text
MW-7
AutoCAD SHX Text PLOTTED: September 25, 2020 - 9:49 AM, BY: Burton, George ASeptember 25, 2020 - 9:49 AM, BY: Burton, George A - 9:49 AM, BY: Burton, George A9:49 AM, BY: Burton, George A, BY: Burton, George ABurton, George A
AutoCAD SHX Text P:\CAD\HW559\HAZ WASTE\Former Colts Station\SSAR\2020-09\FIG-2.dwg
AutoCAD SHX Text
SCALE: 1 INCH =
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text 7.5
AutoCAD SHX Text
AutoCAD SHX Text
SB-59A
AutoCAD SHX Text
MW-1
AutoCAD SHX Text
TW-1
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text MW-2 9-18 0.20 U 0.45 U 0.26 U 0.56 U 0.41 U 0.020 U 0.20 U 0.21 U 0.20 U 620 U 3.2 U
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
DUP-01 9-18 NA NA NA NA NA NA 5.1 20 23 1,500 3.2 U
AutoCAD SHX Text MW-3 9-18 0.20 U 0.45 U 0.26 U 0.56 U 0.41 U 0.020 U 0.20 U 0.21 U 0.20 U 620 U 3.2 U
AutoCAD SHX Text
MW-1 9-18 0.20 U 0.45 U 1.3 0.80 I 0.41 U 0.020 U 4.8 20 23 1,800 3.2 U
AutoCAD SHX Text
DUP-01 12-18 0.18 U 0.49 U 1.1 1.1 U 0.24 U 0.013 U 3.9 13 12 1,000 1.1 U
AutoCAD SHX Text
MW-1 12-18 0.18 U 0.49 U 1.2 1.6 I 0.24 U 0.013 U 2.9 10 9.1 1,100 1.1 U
AutoCAD SHX Text MW-2 12-18 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U 0.013 U 0.19 U 0.20 U 0.20 U 740 U 1.1 U
AutoCAD SHX Text
MW-3 12-18 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U 0.013 U 0.48 0.42 0.46 850 1.1 U
AutoCAD SHX Text
ID DATE DEPTH DATA B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
SB-59A 7-18 14-16' SPLP 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA NA NA
AutoCAD SHX Text
ID DATE DEPTH DATA B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
SB-60A 7-18 14-16' SPLP 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA NA NA NA NA NA
AutoCAD SHX Text
DUP-01 7-19 0.18 U 0.49 U 0.76 I 1.1 U NA 0.24 U 2.3 6.6 5.5 1,600 1.1 U
AutoCAD SHX Text
MW-1 7-19 0.18 U 0.49 U 0.65 I 1.1 U NA 0.24 U 1.7 4.1 2.9 1,800 1.1 U
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
MW-4 7-19 1.1 21 110 0.24 U 4.8 21 25 2,800 1.1 U
AutoCAD SHX Text
MW-2 7-19 0.18 U 0.49 U 0.38 U 1.1 U NA 0.24 U 0.35 0.36 0.35 1,500 1.1 U
AutoCAD SHX Text
MW-3 7-19 0.18 U 0.49 U 0.38 U 1.1 U NA 0.24 U 1,400 1.1 U
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
MW-5 7-19 0.67 I 0.49 U 3.0 3.0 NA 0.24 U 0.37 0.34 0.34 2,100 1.1 U
AutoCAD SHX Text
MW-3 11-19 NA NA NA NA NA NA 0.19 U 0.20 U 0.20 U NA NA
AutoCAD SHX Text
DUP-02 11-19 NA NA NA NA NA NA 0.19 U 0.20 U 0.20 U NA NA
AutoCAD SHX Text
MW-4 11-19 0.49 U 17 1.1 U 0.24 U NA NA NA NA NA NA
AutoCAD SHX Text
DUP-01 11-19 0.49 U 19 1.1 U 0.24 U NA NA NA NA NA NA
AutoCAD SHX Text
MW-5 11-19 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA NA NA NA NA NA
AutoCAD SHX Text
MW-6
AutoCAD SHX Text
MW-3 4-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.29 0.20 U 0.20 U 1,900 NA
AutoCAD SHX Text
MW-4 4-20 1.3 0.49 U 7.1 1.1 U 0.24 U NA 1.9 17 9.5 5,000 NA
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
MW-6 4-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 3.3 23 16 2,800 NA
AutoCAD SHX Text
ID DATE B T E X MTBE EDB N 1-M 2-M TRPH PB
AutoCAD SHX Text
MW-7 4-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.27 3.5 2.7 2,300 NA
AutoCAD SHX Text
MW-5 4-20 0.18 U 0.49 U 0.38 U 2.3 0.24 U NA 4.2 21 23 2,800 NA
AutoCAD SHX Text
DUP-01 4-20 1.4 0.49 U 7.8 1.1 U 0.24 U NA 1.3 12 6.6 4,200 NA
AutoCAD SHX Text
MW-1 8-20 0.18 U 0.49 U 0.38 UI 1.1 U 0.24 U NA 0.87 2.3 1.0 940 NA
AutoCAD SHX Text
MW-2 7-19 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.19 U 0.20 U 0.20 U 600 U NA
AutoCAD SHX Text
MW-3 8-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.19 U 0.20 U 0.20 U 600 U NA
AutoCAD SHX Text
MW-4 8-20 0.18 U 0.49 U 1.4 2.4 0.24 U NA 2.1 24 14 NA
AutoCAD SHX Text
MW-5 8-20 0.18 U 0.49 U 0.38 I 2.7 0.24 U NA 5.8 27 1,700 NA
AutoCAD SHX Text
MW-6 8-20 0.18 U 0.49 U 0.67 I 1.1 U 0.24 U NA 3.8 24 2,000 NA
AutoCAD SHX Text
MW-7 8-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.23 7.7 4.8 1,100 NA
AutoCAD SHX Text
DUPE-01 8-20 0.18 U 0.49 U 0.38 U 1.1 U 0.24 U NA 0.27 9.0 5.7 1,200 NA
FDEP COST ESTIMATE - HW559 - Original
Contractor: Wood E&IS Date: 9/24/2021
Task #: BF591F SubTask 1 Site: Colt's Station SubTask 2
Activity/Phase: SubTask 3 Project Manager: SubTask 4 Supplemental Site Assessment Report
Wood Project #: 6090180047 SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$48.12 Project Manager RW 5 4.6 $36.45 Program Manager 0 0 0 0 0 $48.12 Project Manager 0 0 0 0 0 $55.49 Principal Scientist GS 0 0 0 0 0 $48.12 Principal Scientist RW 19 5 0 14 0 $43.59 Senior Scientist 0 0 0 0 0 $42.79 Senior Engineer 0 0 0 0 0 $28.44 Project Engineer 0 0 0 0 0 $28.85 Project Scientist AH 4 0 0 4 0 $22.83 Project Scientist NS 12 0 12 0 0 $19.23 Staff Scientist ZL 14 0 14 0 0 $35.63 Technical Editor 0 0 0 0 0 $24.59 Construction Supervisor 0 0 0 0 0 $18.78 O&M Specialist 0 0 0 0 0 $25.53 Drafter GB 5 1 0 4 0 $28.37 Senior Technician 0 0 0 0 0 $25.57 Senior Technician 0 0 0 0 0 $19.28 Project Assistant RP 3 0 2 1 0 $14.02 Field Technician 0 0 0 0 0 $22.61 Project Accountant 0 0 0 0 0 $28.57 Contracts/Purchasing 0 0 0 0 0 $12.15 Clerical 0 0 0 0 0 $18.16 Word Processing 0 0 0 0 0
Total Hours 62 5 6 28 23 0 Direct Labor $1,978.14 $219.79 $266.13 $581.74 $910.48 $0.00
Overhead 111.08% $2,197.32 $244.14 $295.62 $646.20 $1,011.36 $0.00 Gen & Admin 8.36% $165.37 $18.37 $22.25 $48.63 $76.12 $0.00 Fringe 35.00% $692.36 $76.93 $93.15 $203.61 $318.67 $0.00 Total Labor $5,033.19 $559.23 $677.15 $1,480.18 $2,316.63 $0.00
Other Direct Costs $98.91 $10.99 $13.31 $29.09 $45.52 $0.00 Travel
Vehicle Rental $97.00 $0.00 $97.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $144.00 $0.00 $144.00 $0.00 $0.00 Total Travel $241.00 $0.00 $241.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) Huss Drilling $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW Perma-Fix $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Project Management SA QAPP Workplan
Supplemental Site Assessment Justin Cross (FDEP)/Ron White (Wood)
Groundwater Sampling
REV: 02/11 Wood ES Page 1
FDEP COST ESTIMATE - HW559 - Original
Contractor: Wood E&IS Date: 9/24/2021
Task #: BF591F SubTask 1 Site: Colt's Station SubTask 2
Activity/Phase: SubTask 3 Project Manager: SubTask 4 Supplemental Site Assessment Report
Wood Project #: 6090180047 SubTask 5
Totals 1 2 3 4 5
Project Management SA QAPP Workplan
Supplemental Site Assessment Justin Cross (FDEP)/Ron White (Wood)
Groundwater Sampling
Laboratory Analytical Costs $2,316.00 $0.00 $2,316.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $208.00 $0.00 $208.00 $0.00 $0.00 Total Laboratory $2,524.00 $0.00 $2,524.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $0.00 $32.50 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $208.55 $0.00 $208.55 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $241.05 $0.00 $241.05 $0.00 $0.00
Subtotal $8,138.15 $570.22 $690.46 $4,515.32 $2,362.15 $0.00 Completion Fee $503.32 $55.92 $67.72 $148.02 $231.66 $0.00
Total Estimated Cost $8,641.47 $626.14 $758.18 $4,663.34 $2,593.81 $0.00
REV: 02/11 Wood ES Page 2
SITE : Colt's Station SUBTASK 2 SA QAPP Workplan
DATE: 9/24/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE HOURS
Project Manager
Consulting Sci GS WP / QAPP Review
Principal Sci RW Prepare GAPP, HASP and CP/LOE 5
Proj Eng/Sci
Drafter GB Figures 1
Project Assistant
TOTAL LABOR 6
WORK DESCRIPTION
HW559 - Original
SITE :
SUBTASK 3
DATE: 9/24/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager RW Staff Scientist NS
Staff Scientist ZL
Project Assistant RP 2
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
MW Installation Kit $737.20 week 0 $0.00
$184.30 day 0 $0.00 Shallow GW Sampling Kit $834.20 week 0 $0.00
$208.55 day 1 $208.55 $208.55
PPE Level D H&S $28.00 (2 persons x 3 day) 0 TOTAL PPE $0.00
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00 Equipment Van $97.00 day 1 $97.00
$97.00
PER DIEM STAFF RATE UNIT USAGE
motel 2 $110.00 day 0 $0.00 meal 2 $36.00 day 2 $144.00
$144.00
Round trip mobilization (GW sampling)
Colt's Station Groundwater Sampling
TOTAL EQUIPMENT
Round trip mobilization (GW sampling) Sample 7 monitoring wells & water levels
TOTAL LABOR
Project set-up, subcontractor Pos, invoicing Stage / De-stage for field work Sample 7 monitoring wells & water levels
TOTAL PER DIEM
TOTAL VEHICLE
LABORATORY COSTS
Advanced Environmental Laboratories Groundwater RATE # SAMPLES #QAQC VOAs TCL (8260) $66.00 7 3 Dup/Trip Blk/Eq Blk $660.00 PAHs TCL (8270) $100.00 7 2 dup/Eq Blanks $900.00 TRPH - FLPRO $84.00 7 2 dup/Eq Blanks $756.00 Lead 6010 $11.50 dupe/Eq Blanks $0.00
TOTAL LAB $2,316.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00 Large - 25 to 50 LBS Samples to lab $104.00 Overnight 2 $208.00 Ice $5.00 per cooler $0.00
TOTAL SHIPPING $208.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 1 $32.50 EnCore $8.75 each 0 $0.00
TOTAL SUPPLIES $32.50
Att E-1, Page 4 of 15 Att E-1, Page 5 of 15 Att E-1, Page 9 of 15
SITE :
SUBTASK 4
DATE: 9/24/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Sci GS Report Review Principal Sci RW Site Assessment Report Text 14 Proj Eng/Sci AH Data entry tables, GW Sample Logs, MW Construction Logs 4 Drafter GB Figures 4 Project Assistant RP Report prep and assembly 1
Colt's Station Supplemental Site Assessment Report
TOTAL LABOR
| HW559 TA BF591F |
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Draft Scope of Work for Geosyntec New Beginning CERCLA Preliminary Assessment Proposal_9_22_21.pdf |
| Drill Quotes Compiled.pdf |
| 0338_001 |
| 0335_001 |
| Utility Locate Quotes Compiled.pdf |
| Geosyntec Utility-207_Geotek |
| Blankenship |
| Former New Beginning Custom Chrome Facility_V1_Bloodhound |
| Negotiation Summary Colt's Station TA BF591F |
| Colts Station SSA7 WP_QAPP CP Package 9.23.21 |
File details come from the government source that posted it. Updated .