CN-370000-HW559-BF11A.pdf
PDF 626 KB Posted
- Contract number
- HW559
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Notification Form for DEP Contract No. HW559, an indefinite delivery vehicle awarded to AMEC Foster Wheeler Environment & Infrastructure/Wood Inc. The contract involves the Florida Department of Environmental Protection (FDEP) as the state agency, with the Brownfields Section managing the work. The assignment is designated as Task BF11A under Module SRPPM with Grant SRP-13, and is assigned to Beck Ranch Park in Osteen, Volusia County, Florida. The project manager for AMEC Foster Wheeler is Ron White, with DEP Contract Manager Carrie Kruchell and Task Manager Ronald M. King overseeing the assignment.
The scope of work encompasses the preparation of a Site Assessment Work Plan and Health & Safety Plan (HASP) for the Beck Ranch Park site. Deliverables include file review, a scoping meeting, development of the work plan and HASP, site reconnaissance, and proposed sampling locations. The assignment is structured as a fixed-price contract totaling $2,323.44, divided into two subtasks: Draft Work Plan and HASP at $2,065.27 and Approval of Work Plan and HASP at $258.17. The final deliverable is due on December 8, 2017, with the period of performance extending through January 30, 2018. The cost estimate reflects 20 total labor hours distributed across project manager, consulting engineer/scientist, project scientist, and drafter positions, with overhead, general and administrative costs, and fringe benefits applied according to the contractor's established rates.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FDEP COST ESTIMATE - HW559
Contractor: Amec Foster Wheeler
Date: 11/16/2017
Task #: SubTask 1
Site: Beck Ranch SubTask 2
Activity/Phase: SubTask 3
Project Manager: SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$44.68 Project Manager 2 2.0
$36.45 Program Manager 0 0 0 0 0
$43.59 Project Manager 0 0 0 0 0
$65.18 Consulting Eng/Sci 1 1 0 0 0
$44.68 PM /Associate Eng/Sci 12 12 0 0 0
$43.59 Senior Scientist 0 0 0 0 0
$42.79 Senior Engineer 0 0 0 0 0
$28.44 Project Engineer 0 0 0 0 0
$21.49 Project Scientist 1 1 0 0 0
$26.00 Project Scientist 0 0 0 0 0
$20.71 Staff Scientist 0 0 0 0 0
$35.63 Technical Editor 0 0 0 0 0
$24.59 Construction Supervisor 0 0 0 0 0
$18.78 O&M Specialist 0 0 0 0 0
$25.53 Drafter 4 4 0 0 0
$27.95 Senior Technician 0 0 0 0 0
$25.57 Senior Technician 0 0 0 0 0
$18.16 Project Assistant 0 0 0 0 0
$14.02 Field Technician 0 0 0 0 0
$22.61 Project Accountant 0 0 0 0 0
$28.57 Contracts/Purchasing 0 0 0 0 0
$12.15 Clerical 0 0 0 0 0
$18.16 Word Processing 0 0 0 0 0
Total Hours 20 2 18 0 0 0
Direct Labor $815.57 $90.62 $724.95 $0.00 $0.00 $0.00
Overhead 111.08% $905.93 $100.66 $805.27 $0.00 $0.00 $0.00
Gen & Admin 8.36% $68.19 $7.58 $60.61 $0.00 $0.00 $0.00
Fringe 35.00% $285.45 $31.72 $253.73 $0.00 $0.00 $0.00
Total Labor $2,075.14 $230.58 $1,844.56 $0.00 $0.00 $0.00
Other Direct Costs $40.78 $4.53 $36.25 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Project Management
Workplan and HASP
Workplan Development
Ron King (DEP)/Ron White (Amec)
REV: 02/11 AMEC Page 1
FDEP COST ESTIMATE - HW559
Contractor: Amec Foster Wheeler
Date: 11/16/2017
Task #: SubTask 1
Site: Beck Ranch SubTask 2
Activity/Phase: SubTask 3
Project Manager: SubTask 4
SubTask 5
Totals 1 2 3 4 5
Project Management
Workplan and HASP
Workplan Development
Ron King (DEP)/Ron White (Amec)
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $2,115.92 $235.11 $1,880.81 $0.00 $0.00 $0.00
Completion Fee $207.52 $23.06 $184.46 $0.00 $0.00 $0.00
Total Estimated Cost $2,323.44 $258.17 $2,065.27 $0.00 $0.00 $0.00
REV: 02/11 AMEC Page 2
SITE :
SUBTASK 2
DATE: 11/16/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager
Consulting Eng/Sci (EB) 1
Principal Eng/Sci (RW) 12
Senior Scientist
Senior Engineer
Project Engineer
Project Scientist (AP) 1
Staff Engineer
Staff Scientist
Technical Editor
Construction Supervisor
O&M Specialist
Drafter (GB) 4
Senior Technician
Engineering Tech
Project Assistant
Field Technician
Project Accountant
Contracts/Purchasing
Clerical
Word Processing
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Site Recon Kit $325.92 week 0 $0.00
$81.48 day 0 $0.00
GPS $101.00 week 0 $0.00
$25.25 day 0 $0.00
$0.00
PPE Level D H&S $28.00 (1 person x
1 day) 0 TOTAL PPE $0.00
VEHICLE TYPE RATE UNIT USAGE
Automobile $272.00 week 0 $0.00
$68.00 day 0 $0.00
Equipment Van $420.00 week 0 $0.00
$97.00 day 0 $0.00
Truck $420.00 week 0 $0.00
$97.00 day 0 $0.00
$0.00TOTAL VEHICLE
TOTAL EQUIPMENT
Beck Ranch
Site Reconnaisance
Technical review
File review, scoping meeting, workplan development
Prepare HASP
Figure development for WP, HASP maps
TOTAL LABOR
| MX-3570N_20171121_104017, executed BF11A |
| Beck Ranch WP CP 11.16.17 |
File details come from the government source that posted it. Updated .