Summary of Task Assignment DC018V under DEP Contract HW552

This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW552 (Bureau of Waste Cleanup Services, dated December 10, 2010). The task assignment authorizes Professional Service Industries, Inc. (PSI), an Intertek company based in Tampa, Florida, to conduct annual groundwater monitoring activities at the Hampton Cleaners facility located at 5317 Gunn Highway, Tampa, Hillsborough County, Florida (FDEP Site No. ERIC_4713). Key personnel include DEP Contract Manager Killian Talley and PSI Contractor Representative Nana Westmark.

The scope of work consists of two subtasks: Project Management and Annual Groundwater Sampling and Analysis and Report. PSI will collect groundwater samples and elevation measurements from nine monitoring wells (six shallow wells, three deep wells, and two recovery wells), conduct laboratory analysis for volatile organic compounds using EPA Method 8260, and prepare a comprehensive Groundwater Monitoring Report with GIS/ADaPT package deliverable. The total task assignment value is $6,950.38 on a fixed-price basis, with no retainage, comprising 50 labor hours. The final deliverable is due June 18, 2021, with task assignment execution through October 1, 2021. Invoicing occurs upon FDEP receipt and approval of the deliverables. Subcontractor costs include $115.00 for investigative derived waste (IDW) management and disposal through Petrotech Southeast, Inc., and $858.00 for laboratory analytical services.

View the file

Other files

File Type Posted
CN-370000-HW552-A4.pdf PDF
CN-370000-HW552-CO2.pdf PDF
CN-370000-HW552-DC001J.pdf PDF
CN-370000-HW552-DC002Q.pdf PDF
CN-370000-HW552-DC002Q.pdf.crdownload CRDOWNLOAD file
CN-370000-HW552-DC004Q.pdf PDF
CN-370000-HW552-DC004T.pdf PDF
CN-370000-HW552-DC007W.pdf PDF
CN-370000-HW552-DC014G.pdf PDF
CN-370000-HW552-DC014K.pdf PDF
CN-370000-HW552-DC015H.pdf PDF
CN-370000-HW552-DC018K.pdf PDF
CN-370000-HW552-DC019J.pdf PDF
CN-370000-HW552-DC01ACO2.pdf PDF
CN-370000-HW552-DC01B.pdf PDF
CN-370000-HW552-DC01D.pdf PDF
CN-370000-HW552-DC01G.pdf PDF
CN-370000-HW552-DC01KCO1.pdf PDF
CN-370000-HW552-DC023G.pdf PDF
CN-370000-HW552-DC023N.pdf PDF
CN-370000-HW552-DC024i.pdf PDF
CN-370000-HW552-DC026F.pdf PDF
CN-370000-HW552-DC029A.pdf PDF
CN-370000-HW552-DC02C.pdf PDF
CN-370000-HW552-DC02D.pdf PDF
CN-370000-HW552-DC02K.pdf PDF
CN-370000-HW552-DC02LCO1.pdf PDF
CN-370000-HW552-DC02M.pdf PDF
CN-370000-HW552-DC02P.pdf PDF
CN-370000-HW552-DC033E.pdf PDF
CN-370000-HW552-DC037C.pdf PDF
CN-370000-HW552-DC037D.pdf PDF
CN-370000-HW552-DC038A.pdf PDF
CN-370000-HW552-DC03CCO1.pdf PDF
CN-370000-HW552-DC03E.pdf PDF
CN-370000-HW552-DC03H.pdf PDF
CN-370000-HW552-DC04GCO2.pdf PDF
CN-370000-HW552-DC04K.pdf PDF
CN-370000-HW552-DC04M.pdf PDF
CN-370000-HW552-DC04P.pdf PDF
CN-370000-HW552-DC05CCO2.pdf PDF
CN-370000-HW552-DC05D.pdf PDF
CN-370000-HW552-DC05FCO1.pdf PDF
CN-370000-HW552-DC06A.pdf PDF
CN-370000-HW552-DC06CCO1.pdf PDF
CN-370000-HW552-DC06CCO2.pdf PDF
CN-370000-HW552-DC06D.pdf PDF
CN-370000-HW552-DC06F.pdf PDF
CN-370000-HW552-DC06GCO3.pdf PDF
CN-370000-HW552-DC06H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW552

D000 N/ADC018V

Professional Service Industries, Inc. (PSI)

Nana Westmark

850-245-8928Killian Talley

ERIC_4713

Hampton Cleaners

5317 Gunn Hwy, Tampa, Hillsborough

Monitoring

This Task Assignment authorizes PSI to conduct annual groundwater monitoring activities in accordance with the October 5, 2020 scope of work, cost estimate, and bid documentation.

Groundwater Monitoring Report; GIS/ADaPT

06/18/2021

10/01/2021

$ 6,950.38 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.10.13 12:36:20 -04'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.10.13 12:36:31 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.10.13 15:39:59 -04'00'

Nana G Westmark Digitally signed by Nana G Westmark Date: 2020.10.19 10:58:31 -04'00'

$ 6,950.38

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Groundwater Monitoring Report; GIS/ADaPT 06/18/2021

Subtasks 1-2: FDEP receipt and approval of Groundwater Monitoring Report;

GIS/ADaPT $ 6,950.38

$ 6,950.38

HW552

DC018V

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW552 Contract Negotiation File Hampton Cleaners Tampa, Hillsborough County

ERIC_4713

From: Killian Talley, Project Manager Date: October 12, 2020 Subject: Negotiation Summary

HW552 DC018V

Task Assignment authorizes PSI to conduct annual groundwater monitoring at the Hampton Cleaners site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Sampling and Analysis and Report Subtask includes costs and labor for PSI to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, eleven (11) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B, and management of investigative derived waste. Upon receipt of the groundwater analytical data, PSI will generate a Groundwater Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations. IDW will be transported and disposed by PetroTech Southeast as the lowest responsive and responsible bidder.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,950.38 with 50 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc.

Date: 10/5/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Hampton Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 SubTask 8

Project Manager: Nana Westmark SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 4 3.6 $62.50 Principal Consultant 0 0.0 0 0 0 0 0 0 0 0 $52.89 Senior Engineer, MR 0 0.0 0 0 0 0 0 0 0 0 $48.08 Senior Geologist, NW 7 7.0 0 0 0 0 0 0 0 0 $45.20 Senior Scientist 0 0.0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0 0 0 0 0 0 0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0 0 0 0 0 0 0 0 $39.42 Project Manager 0 0.0 0 0 0 0 0 0 0 0 $31.75 Project Engineer, MM 0 0.0 0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 12 12.2 0 0 0 0 0 0 0 0 $31.01 Project Scientist 0 0.0 0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0.0 0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0.0 0 0 0 0 0 0 0 0

$0.00 Professional Land Surveyor 0 0.0 0 0 0 0 0 0 0 0 $0.00 Chemist 0 0.0 0 0 0 0 0 0 0 0

$24.50 GIS Specialist 4 4.0 0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0.0 0 0 0 0 0 0 0 0 $21.88 Staff Geologist, RM 0 0.0 0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 0 0.0 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 22 21.5 0 0 0 0 0 0 0 0 $20.57 Staff Scientist, AH 0 0.0 0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0.0 0 0 0 0 0 0 0 0 $18.75 Administrative Assistant, BM 2 2.0 0 0 0 0 0 0 0 0 $15.50 Secretary 0 0.0 0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0 0 0 0 0 0 0 0 $12.00 Laborer 0 0.0 0 0 0 0 0 0 0 0

Total Hours 50.3 3.6 46.7 0 0 0 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $1,564.64 $173.85 $1,390.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $2,674.90 $297.21 $2,377.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $4,239.54 $471.06 $3,768.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $4,239.54 $471.06 $3,768.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $78.23 $8.69 $69.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Hampton ERIC_4713 0552-323449 CEF_PSI.XLS Page 1

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc.

Date: 10/5/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Hampton Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 SubTask 8

Project Manager: Nana Westmark SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.50 $11.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $126.50 $126.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $858.00 $858.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $858.00 $858.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $965.15 $965.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,030.15 $1,030.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,526.42 $479.75 $6,046.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $423.96 $47.11 $376.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,950.38 $526.86 $6,423.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Hampton ERIC_4713 0552-323449 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Hampton Cleaners SubTask 2 Annual Groundwater Monitoring

DATE: 10/5/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, N Westmark Develop Level of Effort and Cost Estimate 2

Staff Scientist, R Fetter Project Prep 1 Load / Unload 1 Travel 2 Collect groundwater elevations (9 wells) (10 minutes per well) 1.5 Collect groundwater samples (9 wells total) 6 shallow wells @ 1 hour per well 2 3 deep wells @ 2 hours per well 6 2 recovery wells @ 2 hrs per well 4 Documentation of groundwater sampling & measurements 2 Pick-up, drop off samples 2

21.5 Report Project Geologist, C Cummins Prepare tables and draft maps 4.0

Prepare GIS package (8 minute per point) 1.2 Data reduction / evaluation, prepare report 7.0

12.2

GIS / CAD Specialist, D Grove Create maps, figures 4.0

Senior Geologist, N Westmark Report Review, sign and seal 5.0

7.0

Administrative Assistance, B Meynardie Compile document for submittal 2

TOTAL LABOR 46.7

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit $208.55 day 1 $208.55 $834.20 week 0 $0.00

Deep Groundwater Sampling Kit $349.20 day 2 $698.40

Drum $58.20 each 1 $58.20 $965.15

Expendables $32.50 day 2 $65.00

TOTAL EQUIPMENT $1,030.15

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $97.00 day 2 $194.00

$420.00 week 0 $0.00

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $66.00 11 1 1 $858.00

$0.00

TOTAL LAB $858.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT

Petrotech Southeast, Inc. $115.00 1 $115.00

TOTAL $115.00

IDW management, treatment, disposal per drum

Hampton ERIC_4713 0552-323449

PSI Proposal Number: 0552-323449 October 5, 2020

MMMM DD,

www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Mr. Killian Talley, Environmental Specialist III Telephone: (850) 245-8705 Email: Killian.Talley@FloridaDEP.gov

Re: Proposal for Annual Groundwater Monitoring

Hampton Cleaners 5317 Gunn Highway Tampa, Hillsborough County, Florida

FDEP Facility No. 29 9500922 / ERIC_4713 PSI Project No. 0552656

Dear Mr. Talley:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide Annual Groundwater Monitoring services for the Hampton Cleaners at 5317 Gunn Highway, Tampa, Florida. Included with this proposal is a discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

The Hampton Cleaners is located at 5317 Gunn Highway, Tampa, Florida. The drycleaner business is longer in operation and currently is a drop off and pick up facility for cleaning. The drycleaner space is located in the Hampton Plaza shopping complex in a residential / commercial developed area of Citrus Park, near Tampa. The site is bordered to the north by other tenants of the shopping complex, to the east by residential land use and to the south and west by a parking lot that has been recently developed as an Auto Zone retail facility. A private charter school is located in the same complex footprint but in a separate building.

A RAP Addendum was implanted by PSI in December 2013 and January 2014, consisting of SVE well installation, groundwater amendment application and sewer line replacement. The property owner was concurrently responsible for removing some of the impacted soil around the stormwater grate behind the building.

mailto:Killian.Talley@FloridaDEP.gov

FDEP – Hampton Cleaners

An SVE / air injection system was transferred from the Department’s Lakeland storage facility to the Hampton site and installed in May through June 2014. The remediation system operated from June 2014 to December 2017. Confirmation soil samples collected in July 2018 revealed no detections of the contaminants of concern above Chapter 62-777, FAC Soil Cleanup Target Levels (SCTLs), and the system was shutdown.

The most recent groundwater monitoring in April 2020 revealed the groundwater plume appears to be migrating southwest. PSI recommend continuing with the annual groundwater monitoring as a Post Active Remediation Monitoring strategy.

PSI has developed the proposal contained herein to continue the groundwater monitoring program for 2021. The recommended network is based on previous results and in accordance with our most recent groundwater report.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of conducting groundwater sampling and analysis, along with a report deliverable. The results will be used to evaluate current groundwater quality conditions.

Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Annual Groundwater Sampling and Analysis and Report

a. Mobilization to the site.

b. Collect groundwater samples and groundwater elevation measurements from the following wells:

i. Shallow wells: MW002, MW006, MW007, MW010, MW012, and MW014.

ii. Deep wells: DMW008, DMW009, and DMW015,

iii. Recovery wells: RW003 and RW005.

c. Collected groundwater samples will be laboratory analyzed for Volatile Organic Halocarbons (VOH) by EPA Method 8260. The analysis will be performed using a National Environmental Laboratory Accreditation Conference (NELAC) approved laboratory.

d. The investigative derived waste (IDW) will be containerized in a 55-gallon drum for later removal to an approved facility for treatment / disposal.

e. An Annual Groundwater Monitoring Report will be developed which will include current and historical data, with a comparison to state standards and consist of current groundwater elevation and quality date, development of ADaPT package, and recommendations. Conclusions and recommendations will be made, which will include any modifications to the proposed annual groundwater sampling event. The report will incorporate specific recommendations and provide opinions based on professional experience to achieve the most efficient endpoints and closure.

FDEP – Hampton Cleaners

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the above described services is shown on the attached Cost Estimate and Level of Effort sheets, which includes groundwater sampling and analysis and the report deliverable. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010. The Annual Groundwater Monitoring will be scheduled for February 2021 with a report submittal in June 2021.

PSI appreciates the opportunity to be of service to the FDEP. We look forward to working with you on this important project. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Erin Lennox Nana Westmark, PG, CHMM Project Scientist Principal Consultant / Contract Manager

Enclosure: Cost Estimate Level of Effort

\\Tampa-fs1\projects\552-Env\FDEP BWC\0552656 Hampton Cleaners\Proposal\2021 GW\Hampton ERIC_4713 0552- 323449.docx

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Soil $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Soil $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples)

Panhandle 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00 $67.00 $67.00

$92.00 $67.00 $92.00 $92.00

$67.00 $67.00 $92.00

$95.00 $450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00 $45 / 3 Drums or Less

$50.00 $55/ 3 Drums or Less

$50.00 $55/ 3 Drums or Less

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .