_CM_PreSubmission Addendum 1 - Auditoriums.pdf

PDF 1 MB Posted

Attached to
CM - REQUEST FOR QUALIFICATIONS
Solicitation number
RFP GRP 270000000006 3
Issued by
Michigan

About this file

This is Addendum No. 1 to a Construction Management Services Request for Qualifications issued by the City of Grand Rapids, Michigan Facilities Management department for the City Auditorium and Burton Auditorium projects. The addendum modifies the proposal submission deadline to Tuesday, October 27, 2026, at 11:00 AM and establishes October 23, 2026, at 10:00 AM as the deadline for submitting Requests for Information (RFI) to allow for final addendum issuance. A pre-submission sign-in sheet is included. The scope of work has been expanded to include replacement of carpet, ceiling tile, lighting, and repainting of the Music Rooms at the City Auditorium, with detailed layout documentation provided. The addendum also includes a pre-submission conference attendee list.

The addendum addresses eight clarifications and RFI responses regarding project delivery. Key clarifications confirm that the Construction Manager will submit one fee proposal with costs separated by project for both auditoriums, that the same superintendent may serve both projects if scheduling permits, that the Project Steering Committee will complete all required drawings and engineering, that permit submission and associated costs fall within the Construction Manager's scope, that bonding requirements apply only to the CM's portion of the project, and that the Construction Manager is responsible for rigging work scope pending finalized documents. The correct versions of Appendix E (Sample Contract) and Appendix F (Required GRPS Forms) have been posted to the SIGMA portal as referenced in the Technical Qualification sections.

View the file

Other files

File Type Posted
C1 - Contractor Cost Workbook - Burton Perf Arts.xlsx XLSX spreadsheet
C1 - Contractor Cost Workbook - City MS Performing Arts.xlsx XLSX spreadsheet
GRPS CM RFQ - auditoriums.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACILITIES MANAGEMENT

900 Union Ave NE • Grand Rapids MI 49503 • Phone (616) 819-3010

ADDENDUM NO. 1

Date: October 20, 2026 Project: Construction Management Services RFQ for City and Burton Auditoriums

Items:

1. Proposal due date has changed to Tuesday, October 27, 2026, at 11:00 AM.

2. Last RFI Questions to be submitted by Friday, October 23, 2026, at 10:00 AM for final addendum issuance.

3. Pre-submission sign-in sheet has been attached.

4. Scope change at City Auditorium:

a. Replacement of Carpet, Ceiling Tile, Lighting and repainting of Music Rooms. (see attached layout)

5. RFI’s:

a. Will a CM Fee Proposal be provided for the City Middle High Auditorium and Burton

Auditorium?

One Proposal, fees separated by project.

b. Please confirm if a superintendent will be required for each auditorium.

Can be the same if does not interfere with schedule of projects.

c. Please clarify the extent of the rigging work per auditorium.

Documents are still being finalized.

d. Please confirm the PSC will be completing all required drawings and engineering.

Yes.

e. Please confirm the permit submission and costs fall under the CM’s scope.

Yes.

f. Please confirm if the CM is required to bond the entire project or just the CM’s cost.

Only CM’s portion.

g. Please provide Appendix “E” (Sample Contract) as noted in section 1.12 of the Technical Qualification.

Correct PDF version of RFQ has been posted to SIGMA

h. Please provide Appendix “F” (Required GRPS Forms) as note in section 1.11 of the Technical Qualification.

Correct PDF version of RFQ has been posted to SIGMA