CLIN 0002 Attachments.pdf
PDF 2 MB Posted
- Attached to
- DLA Fuel Farm Generator, ATS, Paint
- Solicitation number
- N6945020Q2350
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945020Q2350-0002 RFQ Amendment.pdf | ||
| N6945020Q2350-0001 RFQ Amendment.pdf | ||
| N6945020Q2350 RFQ.pdf | ||
| KV NEW PASS APPLICATION FORM.pdf | ||
| CLIN 0001 Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE: Lead Inspection at Kingsville Naval Air Station– BLDG 4777
Building 4777 timothy.zoellick Typewritten Text
ENCLOSURE 1 - LEAD BASED PAINT REPORT
INSPECTION AND ANALYSIS (Asbestos)
The primary purpose of this survey was to locate, sample and analyze suspect ACM in the facility
In accordance with the Texas Asbestos Health Protection Rules (TAHPR), a minimum three samples were collected for each homo-geneous areas. Suspect materials were placed in an impermeable bags and shipped to the laboratory. The samples were analyzed by San-Air Technologies Laboratory. EPA recommended methods was used as listed in EPA/600/M4-82-020; R-93/116, July 1993
“Method for the Determination of Asbestos in Building Materials, Polarized Light Microscopy (PLM). A total of __________.
ASBESTOS NESHAP (40 CFR PART 61 SUBPART M)
The National Emission Standard for Asbestos is a subpart to a broader class of Clean Air Act requirements under the
NESHAPs. The Asbestos NESHAP is primarily concerned with the application, renovation, demolition, and disposal of ACM. The regulation defines ACM as containing greater than 1 per-cent (%) asbestos as measured by polarized light microscopy. The Asbestos NESHAP requirements include:
Project-specific surveys
Written notification to prior to renovation or demolition work
Destructive testing for demolition (or renovation with demolition)
Wetting of ACM during removal
Proper disposal of waste, including Waste Shipment Records
REGULATORY OVERVIEW
The Occupational Safety and Health Administration (OSHA), the U.S. Environmental Protection Agency (EPA), and the
Texas Department of State Health Services (DSHS) are the regulatory agencies that govern this project. The five primary regulations enforced by agencies that govern various activities relating to ACM (such as inspection, sampling, analysis, assessment, abatement, operation and maintenance, etc.) are as follows:
Asbestos Hazardous and Emergency Response Act (AHERA) of 1986
National Emission Standards for Hazardous Air Pollutants (NESHAP)
The Construction and General Industry Standards for Asbestos (as codified by
Federal OSHA)
Texas Asbestos Health Protection Act
Title 25, Chapter 295, Section (§)295.31-§295.73 of the Texas Administrative Code
(TAC)
The EPA regulations are included within the NESHAP and AHERA regulations, which are contained in 40 CFR Part 61, Subpart M, and 40 CFR Part 763, Subpart E, respectively.
timothy.zoellick
Sample Number Description /Location ACM Identified in Building timothy.zoellick
INSPECTION AND ANALYSIS (Lead)
A total of three (3) samples were collected and analyzed for lead. Analysis was conducted by ________________ ac-credited by the American Industrial Hygiene Association (AIHA) lead program. Samples were analyzed by the US EPA
SW846 7420/3050B method.
FINDINGS (Lead)
Sample results are shown in the following tables:
Sample Number Description/Location Lead Content(% by weight)
Note: The OSHA Lead in Construction Standard, 29 CFR 1926.62, is invoked if any lead is present in the sample. Lead-free paint is defined as <0.009% by weight timothy.zoellick
DISCUSSION (Lead)
The Occupational Safety and Health Administration (OSHA) Code of Federal Regulation (CFR) 1926.62 regulates all construction work where an employee may be occupationally exposed to lead. Construction work is defined as work for construction, alteration and/or repair, including painting and decorating. OSHA CFR 1926.62 requires that employers who have a workplace or operation covered by the lead standard shall initially determine if any em-ployee may be exposed to lead at or above the action level of 30μg/m3 based on an 8-hour Time Weighted Expo-sure (TWA). In addition an employee exposure assessment may be required to prove that the lead related activity is within the Permissible Exposure Limit. Prior to commencing work, any contractors/employees which fall under this requirement should be notified to ensure federal compliance. It includes but is not limited to the following:
• Demolition or salvage of structures where lead or materials containing lead are present;
• Removal or encapsulation of materials containing lead;
• New construction, alteration, repair, or renovation of structures, substrates, or portions thereof, that contain lead materials;
• Installation of products containing lead;
• Lead contamination/emergency cleanup;
• Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed, and maintenance operations associated with the construction activities described in this paragraph.
CONCLUSIONS (Lead)
Based on this survey, the following can be concluded:
1. Laboratory analysis indicated lead levels below the reportable limits and well below the EPA’s criterion of LBP as 0.5% by weight, (5,000 ppm).
2. The survey was limited to the areas and materials identified in this report.
RECOMMENDATIONS (Lead)
Comprehensive surveys investigations can not completely eliminate the possibility of hazardous material some ma-terials may have been overlooked or not discovered. Presumed materials were laboratory tested to define contami-nation. Public Works used professional judgment in gathering and analyzing building materials through a compe-tent person.
timothy.zoellick Highlight timothy.zoellick
LEAD LOC:
WATER SEALING PAINT BRICK
ENCLOSURE 2 – B4777 EXTERIOR AND LBP
Power wash the entire exterior of the building, approximately 2340SF
Power wash the entire exterior of the steel awing. approximately 260 SF
ENCLOSURE 3 – PRESSURE WASHING AND STEEL AWNING
ENCLOSURE 4 – GUTTER CORROSION
PRO
INDUSTRIAL™
Steel*:
2 cts. Pro Industrial Acrylic Steel:
1 ct. Pro Industrial Pro-Cryl Primer or DTM Acrylic Primer/Finish or Kem Bond HS or Zinc Clad Primer 1-2 cts. Pro Industrial Acrylic Aluminum:
1-2 cts. Pro Industrial Acrylic Aluminum:
1 ct. Pro Industrial Pro-Cryl Primer 1-2 cts. Pro Industrial Acrylic Concrete Block:
1 ct. Loxon Block Surfacer 1-2 cts. Pro Industrial Acrylic
Concrete/Masonry:
1 ct. Loxon Concrete & Masonry Primer 1-2 cts. Pro Industrial Acrylic Drywall 1 ct. ProMar 200 Zero VOC Primer 1-2 cts. Pro Industrial Acrylic Galvanizing:
2 cts. Pro Industrial Acrylic Prefinished Siding: (Baked-on finishes) 1 ct. DTM Bonding Primer 1-2 cts. Pro Industrial Acrylic Wood, exterior:
1 ct. Exterior Wood Primer 1-2 cts. Pro Industrial Acrylic Wood, interior:
1 ct. Premium Wall & Wood Primer 1-2 cts. Pro Industrial Acrylic
System Tested: (unless otherwise indicated) Substrate: Steel Surface Preparation: SSPC-SP10 Finish: 2 cts. Pro Industrial Acrylic, B66W00651, 6.2 DFT
CHARACTERISTICS
Pro Industrial Acrylic is an ambient cured, single component 100% acrylic coating. It is designed for interior and exterior industrial and commercial applications Chemical resistant Outstanding early moisture resistance Flash rust/early rust resistant Suitable for use in USDA inspected facilities
Color: most colors Recommended Spread Rate per coat:
Wet mils: 6.0 - 12.0 Dry mils: 2.1 - 4.2 Coverage: 135 - 265 sq ft/gal approximate Note: Brush or roll application may require multiple coats to achieve maximum film thickness and uniformity of appearance.
Drying Time @ 7.0 mils wet 50% RH:
@ 50°F @ 77°F @ 120°F To touch: 1 hr 30 min 5 min Tack free & recoat:
8 hrs 5 hrs 15 min Drying times are temperature, humidity, and film thickness dependent.
Finish: 70+@60° Gloss 40-50@60° Semi-Gloss 20-30@85° Eg-Shel Flash Point: N/A Shelf Life: 36 months, unopened Store indoors at 40°F to 100°F.
Tinting with CCE only:
Base oz/gal Strength Extra White 0-4 100% Deep Base 8-12 100% Ultradeep Base 8-12 100%
Extra White B66W00611
(may vary by color) VOC (less exempt solvents): Unreduced:
<50 g/L; <0.42 lb/gal as per 40 CFR 59.406 and SOR/2009-264, s. 12
Volume Solids: 35 ± 2% Weight Solids: 44 ± 2% Weight per Gallon: 9.5 lb/gal ±2%
8/2016 www.sherwin-williams.com continued on back
Adhesion:
Method: ASTM D4541 Result: 1386 psi
Corrosion Weathering 8:
Method: ASTM D5894, 1500 hours, 5 cycles Result: Rating 10, per ASTM D714 for blistering Rating 9 per ASTM D1654 for corrosion
Direct Impact Resistance:
Method: ASTM D2794 Result: >160 in. lb
Dry Heat Resistance:
Method: ASTM D2485 Result: 250°F
Flexibility:
Method: ASTM D522, 180° bend, 1/8" mandrel Result: Passes
Humidity Resistance*:
Method: ASTM D4585, 1500 hours Result: Rating 10 per ASTM D714 for blistering Rating 10 per ASTM D1654 for corrosion
Pencil Hardness:
Method: ASTM D3363 Result: 2B
Salt Fog Resistance*:
Method: ASTM B117, 1500 hours Result: Rating 10 per ASTM D714 for blistering Rating 9 per ASTM D1654 for corrosion
Thermal Cycling:
Method: ASTM D2246, 5 cycles Result: Passes
*over Pro Industrial Pro-Cryl Primer
RECOMMENDED SYSTEMS
*Application of coating on unprimed steel may cause pinpoint rusting. Safety Colors, Deep Base, and Ultradeep colors require a prime coat for maximum durability, adhesion, and corrosion protection.
GREENGUARD
PRODUCT CERTIFIED FOR
LOW CHEMICAL EMISSIONS
UL.COM/GG
UL 2818
GOLD
113.03
ACRYLIC
B66-600 SERIES GLOSS
B66-650 SERIES SEMI-GLOSS
B66-660 SERIES EG-SHEL
As of 8/04/2016, Complies with:
OTC Yes LEED® 09 NC, CI Yes SCAQMD Yes LEED® 09 CS Yes CARB Yes LEED® 09 H&S Yes CARB SCM 2007 Yes LEED® V4 Emissions Yes MPI Yes LEED® V4 VOC Yes timothy.zoellick Polygon timothy.zoellick Rectangle timothy.zoellick Typewritten Text
ENCLOSURE 5 - PAINT AND PRIMER SPECIFICATIONS
timothy.zoellick Text Box
PAINT
SPECIFICATIONS
The information and recommendations set forth in this Product Data Sheet are based upon tests conducted by or on behalf of The Sherwin-Williams Company. Such information and recommendations set forth herein are subject to change and pertain to the product offered at the time of publication. Consult your Sherwin-Williams representative or visit www.paintdocs.com to obtain the most current version of the PDS and/or an SDS.
APPLICATION
Refer to the SDS before use.
Temperature: 50°F minimum 120°F maximum (Air, surface, and material) At least 5°F above dew point
Relative humidity: 85% maximum
The following is a guide. Changes in pressures and tip sizes may be needed for proper spray characteristics. Always purge spray equipment before use with listed reducer. Any reduction must be compatible with the existing environmental and application conditions.
Reducer Water
Airless Spray Pressure ........................................ 1500 psi Hose ................................................. 1/4" ID Tip ........................................... .017" - .021" Filter .............................................. 60 mesh Reduction ...................... Not recommended
Conventional Spray Gun ................................................ Binks 95 Fluid Nozzle Air Nozzle ........................................... 63PB Atomization Pressure ........................ 50 psi Fluid Pressure .............................. 15-20 psi Reduction ........ As needed up to 12½%by volume
Brush .............................. Nylon / polyester Reduction ...................... Not recommended Roller ....................................... 3/8" woven Reduction ...................... Not recommended
If specific application equipment is listed above, equivalent equipment may be substituted.
CLEANUP INFORMATION
Clean spills and spatters immediately with soap and warm water. Clean hands and tools immediately after use with soap and warm water. After cleaning, flush spray equipment with compliant cleanup solvent to prevent rusting of the equipment. Follow manufacturer's safety recommendations when using solvents.
HOTW 8/04/2016 B66W00611 14 00
KOR, FRC, SP
SURFACE PREPARATION
WARNING! Removal of old paint by sanding, scraping or other means may generate dust or fumes that contain lead. Exposure to lead dust or fumes may cause brain damage or other adverse health effects, especially in children or pregnant women. Controlling exposure to lead or other hazardous substances requires the use of proper protective equipment, such as a properly fitted respirator (NIOSH approved) and proper containment and cleanup. For more information, call the National Lead Information Center at 1-800-424-LEAD (in US) or contact your local health authority.
Do not use hydrocarbon solvents for cleaning.
Iron & Steel - Minimum surface preparation is Hand Tool Clean per SSPC-SP2. Remove all oil and grease from surface per SSPC-SP1. For better performance, use Commercial Blast Cleaning per SSPC-SP6. Primer recommended for best performance.
Aluminum - Remove all oil, grease, dirt, oxide and other foreign material per SSPC-SP1.
Galvanizing - Allow to weather a minimum of six months prior to coating. Solvent Clean per SSPC-SP1. When weathering is not possible, or the surface has been treated with chromates or silicates, first Solvent Clean per SSPC-SP1 and apply a test patch. Allow paint to dry at least one week before testing adhesion. If adhesion is poor, brush blasting per SSPC-SP16 is necessary to remove these treatments. Rusty galvanizing requires a minimum of Hand Tool Cleaning per SSPC-SP2, prime the area the same day as cleaned.
Concrete and Masonry - For surface preparation, refer to SSPC-SP13/NACE 6 or ICRI 03732, CSP 1-3. Surfaces should be thoroughly cleaned and dry. Surface temperatures must be at least 55°F before filling. If required for a smoother finish, use the recommended filler/ surfacer. The filler/surfacer must be thoroughly dry before topcoating per manufacturer's recommendations. Weathered masonry and soft or porous cement board must be brush blasted or power tool cleaned to remove loosely adhering contamination and to get to a hard, firm surface. Apply one coat Loxon Conditioner, following label recommendations.
Wood - Surface must be clean, dry and sound. Prime with recommended primer. No painting should be done immediately after a rain or during foggy weather. Knots and pitch streaks must be scraped, sanded and spot primed before full coat of primer is applied. All nail holes or small openings must be properly caulked.
Previously Painted Surfaces - If in sound condition, clean the surface of all foreign material.
Smooth, hard or glossy coatings and surfaces should be dulled by abrading the surface. Apply a test area, allowing paint to dry one week before testing adhesion. If adhesion is poor, additional abrasion of the surface and/or removal of the previous coating may be necessary.
Retest surface for adhesion. If paint is peeling or badly weathered, clean surface to sound substrate and treat as a new surface as above. Recognize that any surface preparation short of total removal of the old coating may compromise the service length of the system.
APPLICATION PROCEDURES
Apply paint at the recommended film thickness and spreading rate as indicated on front page.
Application of coating above maximum or below minimum recommended spreading rate may adversely affect coating performance.
SAFETY PRECAUTIONS
Refer to the SDS sheets before use. FOR PROFESSIONAL USE ONLY.
Published technical data and instructions are subject to change without notice. Contact your Sherwin-Williams representative for additional technical data and instructions.
PRO INDUSTRIAL™
ACRYLIC
timothy.zoellick Rectangle timothy.zoellick Rectangle timothy.zoellick Rectangle timothy.zoellick Typewritten Text
ENCLOSURE 5 - PAINT AND PRIMER SPECIFICATIONS
timothy.zoellick Text Box
PAINT
SPECIFICATIONS
PRO
INDUSTRIAL™
113.05A
PRO-CRYL®
UNIVERSAL PRIMER
B66W01310 Off White B66A01320 Medium Grey B66N01310 Red Oxide
Water Based Topcoat:
1-2 cts. Pro Industrial Acrylic Coating or Pro Industrial Acrylic Dryfall or Pro Industrial DTM Acrylic or Pro Industrial Multi-Surface Acrylic or Pro Industrial Pre-Catalyzed Epoxy or Pro Industrial Water Based Acrolon 100 or Pro Industrial Water Base Alkyd Urethane or Pro Industrial Water Based Catalyzed Epoxy or Sherwin-Williams Architectural Coatings
Solvent Based Topcoat:
1-2 cts. Pro Industrial High Performance Epoxy or Pro Industrial Urethane Alkyd
The systems listed above are representative of the product's use, other systems may be appropriate.
System Tested: (unless otherwise indicated) Substrate: Steel Surface Preparation: SSPC-SP10 1 ct. Pro Industrial Pro-Cryl Universal Off White Primer 1 ct. Pro Industrial Acrylic Coating
CHARACTERISTICS
Pro Industrial Pro-Cryl® Universal Primer is an advanced technology, self cross-linking acrylic primer. It is rust inhibitive and was designed for both construction and maintenance applications. It can be used as a primer under water-based or solvent-based high performance topcoats.
Rust inhibitive, corrosion resistant Single component Early moisture resistant Fast dry Lower temperature application 40°F Interior and exterior use Suitable for use in USDA inspected facilities For use on properly prepared:
Steel, Galvanized & Aluminum Wood
Color: Off White, Recommended Spread Rate per coat:
Wet mils: 5.0 - 10.0 Dry mils: 1.9 - 3.8 ~Coverage: 160 - 320 sq ft/gal Approximate spreading rates are calculated on volume solids and do not include any application loss. Note: Brush or roll application may require multiple coats to achieve maximum film thickness and uniformity of appearance.
Drying Time @ 6.0 mils wet 50% RH:
40°F 77°F 120°F To touch: 2 hrs 40 min 20 min Tack free: 8 hrs 2 hrs 1 hr To recoat: 16 hrs 4 hrs 2 hrs Drying time is temperature, humidity, and film thickness dependent.
Finish: Low sheen Flash Point: N/A Shelf Life: 36 months, unopened Store indoors at 40°F to 100°F.
Tinting: DO NOT TINT
Off White B66W01310 (may vary by color)
VOC (less exempt solvents):
<50 g/L - 0.42 lb/gal As per 40 CFR 59.406 and SOR/2009-264, s.12
Volume Solids: 38% ± 2% Weight Solids: 49% ± 2% Weight per Gallon: 10.09 lb
4/2017 www.sherwin-williams.com continued on back
Adhesion:
Method: ASTM D4541 Result: 500 psi
Corrosion Weathering:
Method: ASTM D5894, 10 cycles, 3360 hours Result: Passes
Direct Impact Resistance:
Method: ASTM D2794 Result: >140 in. lbs.
Dry Heat Resistance:
Method: ASTM D2485 Result: 200°F
Flexibility:
Method: ASTM D522, 180° bend, 1/4" mandrel Result: Passes
Moisture Condensation Resistance:
Method: ASTM D4585, 100°F, 1250 hours Result: Passes
Pencil Hardness:
Method: ASTM D3363 Result: B
Salt Fog Resistance:
Method: ASTM B117, 1250 hours Result: Passes
Provides performance comparable to products formulated to federal specification: AA50557 and Paint Specification: SSPC-Paint 23.
RECOMMENDED SYSTEMS
As of 04/17/2017, Complies with:
OTC Yes LEED® 09 NC,CI Yes OTC Phase II Yes LEED® 09 CS Yes SCAQMD Yes LEED® 09 H&S Yes CARB Yes LEED® v4 Emissions Yes CARB SCM 2007 Yes LEED® v4 VOC Yes Canada Yes MPI Yes
GREENGUARD
PRODUCT CERTIFIED FOR
LOW CHEMICAL EMISIONS
UL.COM/GG UL 2818
GOLD
Polygon timothy.zoellick Text Box
PRIMER SPECIFICATIONS
timothy.zoellick Typewritten Text
ENCLOSURE 5 - PAINT AND PRIMER SPECIFICATIONS
timothy.zoellick Rectangle
Rectangle
The information and recommendations set forth in this Product Data Sheet are based upon tests conducted by or on behalf of The Sherwin-Williams Company. Such information and recommendations set forth herein are subject to change and pertain to the product offered at the time of publication. Consult your Sherwin-Williams representative or visit www.paintdocs.com to obtain the most current version of the PDS and/or an SDS.
APPLICATION
Refer to the SDS before using Temperature: 40°F minimum 120°F maximum (air, surface, and material) At least 5°F above dew point Relative humidity: 85% maximum
The following is a guide. Changes in pressures and tip sizes may be needed for proper spray characteristics. Always purge spray equipment before use with listed reducer. Any reduction must be compatible with the existing environmental and application conditions.
Reducer: Water
Airless Spray Pressure .................................... 2000 psi Hose ............................................ 1/4" ID Tip ...................................... .015" - .019" Filter ......................................... 60 mesh Reduction .................. Not recommended
Conventional Spray Gun .......................................... Binks 95 Fluid Nozzle Air Nozzle ...................................... 63PB Atomization Pressure .................... 60 psi Fluid Pressure ............................... 25 psi Reduction as needed up to 5% by volume
Brush ........................... Nylon/Polyester Reduction .................. Not recommended
Roller ...................................3/8" woven Reduction as needed up to 5% by volume
If specific application equipment is listed above, equivalent equipment may be substituted.
CLEANUP INFORMATION
Clean spills and spatters immediately with soap and warm water. Clean hands and tools immediately after use with soap and warm water. After cleaning, flush spray equipment with compliant cleanup solvent to prevent rusting of the equipment. Follow manufacturer's safety recommendations when using solvents.
HOTW 04/17/2017 B66W01310 01 39
KOR, FRC,SP
SURFACE PREPARATION
WARNING! Removal of old paint by sanding, scraping or other means may generate dust or fumes that contain lead. Exposure to lead dust or fumes may cause brain damage or other adverse health effects, especially in children or pregnant women. Controlling exposure to lead or other hazardous substances requires the use of proper protective equipment, such as a properly fitted respirator (NIOSH approved) and proper containment and cleanup. For more information, call the National Lead Information Center at 1-800-424-LEAD (in US) or contact your local health authority.
Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion.
Do not use hydrocarbon solvents for cleaning.
Iron and Steel - Minimum surface preparation is Hand Tool Cleaning per SSPC-SP2. Remove all oil and grease from the surface per SSPC-SP1. For better performance, use Commercial Blast Cleaning per SSPC-SP6. Self priming.
Aluminum - Remove all oil, grease, dirt, oxide and other foreign material per SSPC-SP1.Self priming.
Galvanizing - Allow to weather a minimum of six months prior to coating. Solvent Clean per SSPC-SP1. When weathering is not possible, or the surface has been treated with chromates or silicates, first Solvent Clean per SSPC-SP1 and apply a test patch. Allow paint to dry at least one week before testing adhesion. If adhesion is poor, brush blasting per SSPC-SP16 is necessary to remove these treatments. Rusty galvanizing requires a minimum of Hand Tool Cleaning per SSPC-SP2, prime the area the same day as cleaned. Self priming.
Previously Painted Surfaces - If in sound condition, clean the surface of all foreign material.
Smooth, hard or glossy coatings and surfaces should be dulled by abrading the surface. Apply a test area, allowing paint to dry one week before testing adhesion. If adhesion is poor, additional abrasion of the surface and/or removal of the previous coating may be necessary.
Retest surface for adhesion. If paint is peeling or badly weathered, clean surface to sound substrate and treat as a new surface as above. Recognize that any surface preparation short of total removal of the old coating may compromise the service length of the system.
Wood - Surface must be clean, dry and sound. Prime with recommended primer. No painting should be done immediately after a rain or during foggy weather. Knots and pitch streaks must be scraped, sanded and spot primed before full coat of primer is applied. All nail holes or small openings must be properly caulked.
APPLICATION PROCEDURES
Apply paint at the recommended film thickness and spreading rate as indicated on front page.
Application of coating below minimum recommended spreading rate will adversely affect coating performance.
SAFETY PRECAUTIONS
Refer to the SDS sheets before use. FOR PROFESSIONAL USE ONLY Published technical data and instructions are subject to change without notice. Contact your Sherwin-Williams representative for additional technical data and instructions.
PERFORMANCE TIPS
Stripe coat crevices, welds, and sharp angles to prevent early failure in these areas. For best results on rusty surfaces, always apply first coat by brush.
No painting should be done immediately after a rain or during foggy weather.
When using spray application, use a 50% overlap with each pass of the gun to avoid holidays, bare areas, and pinholes. If necessary, cross spray at a right angle.
For optimal performance, this primer should be topcoated.
For exterior exposure, this primer should be topcoated within 14 days. If 14 days is exceeded remove all surface contamination by washing with an appropriate cleaner, rinse thoroughly and allow to dry. Finish with appropriate topcoat.
PRO INDUSTRIAL™
PRO-CRYL® UNIVERSAL PRIMER
timothy.zoellick Rectangle timothy.zoellick Rectangle timothy.zoellick Rectangle timothy.zoellick Typewritten Text
ENCLOSURE 5 - PAINT AND PRIMER SPECIFICATIONS
timothy.zoellick Text Box
PRIMER SPECIFICATIONS
File details come from the government source that posted it. Updated .