This document contains federal contracting clauses applicable to a construction contract awarded by the U.S. Army Corps of Engineers.

The contract requires the successful contractor to commence work within 14 calendar days of receiving the notice to proceed and complete all work within 60 calendar days of that notice, with final cleanup included in the completion timeline. The contractor must prosecute the work diligently throughout the performance period. A preconstruction conference may be conducted at the Contracting Officer's discretion, and if held, the successful offeror and potentially subcontractors will be required to attend with specific details provided regarding date, time, and location. Offerors are strongly urged and expected to conduct site visits prior to submission. Site visits can be arranged during normal business hours by contacting DJ Scalf at (502) 658-4055 or David Seng at (502) 315-6722 at either the John T Myers Locks and Dam (16501 Raben Rd., Mt Vernon, IN 47620) or the Newburgh Locks and Dam (6877 State Rd. 66, Newburgh, IN 47630). The contract will include clauses addressing differing site conditions and site investigations that may affect the work.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26QA0840001 SF 30.pdf PDF
JTM NBG UPS Replacement_SOW.pdf PDF
PIEE Directions.pdf PDF
SPECIAL INSTRUCTIONS.pdf PDF
ProjNet Instructions.pdf PDF
Wage Determinations.pdf PDF
Solicitation - W912QR26QA084.pdf PDF
Price Breakout Schedule.pdf PDF
REPS AND CERTS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAUSES

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.236-26 Preconstruction Conference (Feb 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

(End of clause)

52.236-27 Site Visit (Construction) (Feb 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: DJ Scalf (502) 658-4055 and/or David Seng (502) 315-6722.

Address:

U.S Army Corps of Engineers John T Myers Locks and Dam 16501 Raben Rd.

Mt Vernon, IN 47620

U.S Army Corps of Engineers Newburgh Locks and Dam 6877 State Rd. 66 Newburgh, IN 47630

(End of Provision)