This document is a comprehensive bid package for the Clarendon County Emergency Management and 911 Communications Dispatch Center project in Manning, South Carolina. The project involves constructing a 10,112 square foot Type II-B building to serve as an emergency operations and communications center, with construction to be located at 1091 Capital Way. The bid solicitation was issued on May 5, 2025, with a bid submission deadline of June 19, 2025, at 2:00 p.m. local time. A mandatory pre-bid meeting is scheduled for May 15, 2025, at 1:00 p.m. at the Administration Building, followed by a site walkthrough. The project will be procured through a single general contract covering all trades, with a performance period beginning upon receipt of the Notice to Proceed.

The bid documents specify a liquidated damages rate of $500 per day for project delays. Bidders must be properly licensed and prepared to provide a performance bond, payment bond, and acceptable insurance. The geotechnical report indicates potential liquefaction risks with estimated settlements up to 3 inches during a seismic event, which contractors will need to account for in their design and construction approach. The estimated contract sum is not explicitly stated, but the project involves complex construction with concrete masonry, structural steel, brick veneer, aluminum metal panels, and modified bitumen roofing. Bidding documents are available electronically through Clarendon County's procurement website and BidNet Direct, with no electronic bid submissions accepted. The project is funded by Clarendon County and will serve business, assembly, and residential occupancy classifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMERGENCY MANAGEMENT & 911

COMMUNICATIONS DISPATCH CENTER

Clarendon County 1091 Capital Way, Manning, SC 29102

May 5, 2025

Volume 1 of 3

Caplea Coe Architects, Inc.

1643 Means Street

Charleston, SC 29412

(843) 577-6073

EMERGENCY MANAGEMENT AND 911 COMMUNICATIONS DISPATCH CENTER

TABLE OF CONTENTS 000102-1

TABLE OF CONTENTS

PROJECT NAME: Emergency Management and 911 Communications Dispatch Center

SECTION NUMBER OF PAGES

VOLUME 1

000100 Table of Contents 000107 Seals Page 000115 List of Drawings AIA Document A701 Instructions to Bidders Bid Bond (AIA A310 reference) AIA Document A101 Standard Form of Agreement between Owner and Contractor (Including Exhibit A) AIA Document A201 General Conditions of the Contract for Construction 001116 Invitation to Bid 002513 Prebid Meetings 003132 Geotechnical Data 004113 Bid Form – Stipulated Sum (Single-Prime Contract 004393 Bid Submittal Checklist

DIVISION 01 – GENERAL REQUIREMENTS

011000 Summary 012100 Allowances 012200 Unit Prices 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013233 Photographic Documentation 013300 Submittal Procedures 014000 Quality Requirements 014100 Collective Inspections and Structural Testing 014339 Mockups 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closet Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training

DIVISION 02 – EXISTING CONDITIONS

024100 Demolition

TABLE OF CONTENTS 000102-2

DIVISION 03 – CONCRETE

031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete 033543 Polished Concrete Finishing

DIVISION 04 – MASONRY

042200 Concrete Unit Masonry 042613 Masonry Veneer

DIVISION 05 – METALS

050505 Galvanic Corrosion Protection 051200 Structural Steel Framing 052100 Steel Joist Framing 053100 Steel Decking 054000 Cold-Formed Metal Framing 055000 Metal Fabrications

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry 064116 Plastic-Laminate-Clad Architectural Cabinets

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation 072726 Fluid-Applied Membrane Air Barriers 074113 Standing-Seam Metal Roof Panels 074213 Formed Metal Wall Panels 074293 Soffit Panels 074616 Aluminum Siding 075216 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Protected Membrane

Roofing 076200 Sheet Metal Flashing and Trim 077200 Roof Accessories 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants 079219 Acoustical Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083453 Aluminum Security Doors and Frames 084113 Aluminum-Framed Entrances and Storefronts 084129 Aluminum Security Storefront 087100 Door Hardware 088000 Glazing 088117 Fire-Rated Glass 089119 Fixed Louvers

TABLE OF CONTENTS 000102-3

VOLUME 2

DIVISION 09 - FINISHES

092216 Non-Structural Metal Framing 092900 Gypsum Board 093000 Tiling 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096536 Static-Control Resilient Flooring 096813 Tile Carpeting 096900 Access Flooring 099113 Exterior Painting 099123 Interior Painting 099600 High-Performance Coatings

DIVISION 10 - SPECIALTIES

101100 Visual Display Units 101416 Plaques 101419 Dimensional Letter Signage 101423 Room-Identification Panel Signage 102113 Phenolic-Core Toilet Compartments 102600 Wall and Door Protection 102800 Toilet, Bath, and Laundry Accessories 104300 Emergency Aid Specialties 104413 Fire Protection Cabinets 104416 Fire Extinguishers 107300 Aluminum Canopy – Hanger Rod Supported 107516 Ground-Set Flagpoles

DIVISION 11- EQUIPMENT

113013 Residential Appliances

DIVISION 12 – FURNISHINGS

122413 Roller Window Shades 123661 Simulated Stone Countertops

DIVISION 21 – FIRE SUPRESSION

210500 General Fire Suppression Requirements 210501 Common Work Results for Fire Suppression 210510 Documentation and Closeout 210511 Submittals 210548 Seismic Controls for Fire Suppression Piping & Equipment 210553 Identification for Fire Suppression Piping & Equipment 211300 Fire Suppression Sprinkler Systems 212200 Clean Agent Fire Extinguishing Systems 212301 Nitrogen Generation System for Fire Protection Systems

DIVISION 22 –PLUMBING

220500 General Plumbing Requirements 220501 Common Plumbing Materials 220505 Trenching and Excavation

TABLE OF CONTENTS 000102-4

220510 Documentation and Closeout 220511 Submittals 220517 Sleeves, Seals, and Escutcheons 220519 Meters and Gauges for Plumbing Piping 220523 General-Duty Valves for Plumbing Piping – “LEAD FREE” 220529 Hangers and Supports for Plumbing Piping 220548 Vibration and Seismic Control for Plumbing 220553 Identification for Plumbing Piping and Equipment 220592 System Start-Up 220601 Hydronic Specialties 220719 Plumbing Piping Insulation 221100 Plumbing Piping 221123 Plumbing Pumping System 223300 Electric Domestic Water Heaters 224011 Plumbing Accessories 224013 Plumbing Fixtures (General) 224100 Plumbing Fixtures (Sinks and Lavatories) 224200 Plumbing Fixtures (Showers) 224300 Plumbing Fixtures (Water Closets and Urinals) 224400 Plumbing Fixtures (Water Fountain and Water Coolers)

DIVISION 23 –HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230501 General HVAC Requirements 230502 Common HVAC Materials 230508 Required Coordination Meetings 230510 Documentation and Closeout 230511 Submittals 230529 Hangers and Supports for HVAC Piping 230548 Sound, Vibration, and Seismic Control for HVAC 230553 Identification for HVAC Piping and Equipment 230592 System Start-Up 230593 Testing, Adjusting, and Balancing for HVAC 230700 HVAC Insulation 230713 Duct Insulation 230719 HVAC Piping Insulation 230900 Instrumentation and Controls for HVAC (General)

230900.01 Controls for HVAC (Dampers and Valves)

230900.02 Controls for HVAC (Flow Measurement)

230904.1 VRF Control System

230993 Sequence of Operations (HVAC Controls)

230993.01 Sequence of Operation (Single Package Heat Pumps)

230993.02 Sequence of Operation (General Fans)

230993.04 Sequence of Operation (Electric Heaters)

230993.06 Sequence of Operation (Split System Dx Equipment)

230993.09 Sequence of Operation (Various Systems)

232113 HVAC Piping (General) 233112 Mechanical Duct

233113.01 Metal Duct

233300 Duct Accessories 233313 Dampers 233346 Flexible Duct

TABLE OF CONTENTS 000102-5

233400 HVAC Fans 233713 Diffusers, Registers, and Grilles 233723 HVAC Gravity Ventilators 234100 Particulate Air Filtration 238123 Computer Room Air Conditioning 239005 Heat Transfer (Electric Cooling)

239005.02 Heat Transfer (Electric Cooling, VRF Systems)

239006 Heat Transfer (Electric Heaters)

VOLUME 3

DIVISION 26 – ELECTRICAL

260500 Electrical General Requirements 260501 Electrical Coordination 260519 Wire and Cable - Building Wire (600 Volts and Below) 260526 Grounding 260533 Conduits/Raceways and Fittings 260535 Electrical Boxes 260548 Seismic Support of Electrical Equipment 260923 Automatic Lighting Control 262413 Switchboards 262416 Panelboards 262726 Wiring Devices 262816 Safety/Disconnect Switches 263213 Engine Generators 263353 Uninterruptible Power Supply 263600 Automatic Transfer Switch Bypass Isolation 263601 Automatic Transfer Switches 263602 Static Transfer Switches 264113 Lightning Protection System 265100 Lighting

DIVISION 27 – COMMUNICATIONS

270010 Technology General Provisions 270526 Grounding and Bonding for Telecommunications Systems 270528 Raceways for Technology 271000 Structured Cabling System 274100 Audio Visual Systems

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

281000 Electronic Security Systems 282000 Closed Circuit Television – Video Surveillance System 283111 Fire Emergency Voice/Alarm Communications System 283150 Emergency Responder Radio Coverage System (ERRC)

DIVISION 31 – EARTHWORK

311000 Site Clearing 312200 Grading 312316 Excavation

312316.13 Trenching

TABLE OF CONTENTS 000102-6

312500 Erosion and Sedimentation Controls 313116 Termite Control 313700 Riprap

DIVISION 32 – EXTERIOR IMPROVEMENTS

321123 Aggregate Base Courses 321216 Asphalt Paving 321313 Concrete Paving 321723 Pavement Markings 323113 Staggered Aluminum Plank Screening 329219 Seeding

DIVISION 33 – UTILITIES

330561 Concrete Manholes 331416 Site Water Utility Distribution Piping 333113 Site Sanitary Sewerage Gravity Piping 334211 Stormwater Gravity Piping 334213 Stormwater Culverts 334600 Stormwater Management

END OF SECTION

SEALS PAGE 000107 - 1

DOCUMENT 000107 - SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

Firm Seal if Applicable Individual Seal

PRIME ARCHITECT

ROSENBLUM COE ARCHITECTS, INC.

Steven H. Coe, AIA, LEED BD+C License #: AR. 5573

Responsible for Divisions 00-33 except where indicated as prepared by other design professionals of record.

STRUCTURAL ENGINEER

MMSA, INC.

Michael M. Simpson, PE License # 16718

Responsible for sections:

014100 Collective Inspections and Structural Testing 031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete 051200 Structural Steel Framing 052100 Steel Joist Framing 053100 Steel Decking 054000 Cold-Formed Metal Framing

ELECTRICAL ENGINEER

BUFORD GOFF & ASSOCIATES

Brian Melson License #14135

Responsible for Division 26 and 28.

SEALS PAGE 000107 - 2

MECHANICAL ENGINEER

BUFORD GOFF & ASSOCIATES

Jonathan Burkett License #26527

Responsible for Division 23.

PLUMBING & FIRE PROTECTION ENGINEER

BUFORD GOFF & ASSOCIATES

Mark Watts License #12614

Responsible for Divisions 21 and 22.

CIVIL ENGINEER

HUSSEY GAY BELL

Travis Basnett License #32125

Responsible for Divisions 31, 32, and 33.

05/01/2025

SEALS PAGE 000107 - 3

TECHNOLOGY ENGINEER

WIRED ENGINEERING

Daniel T. Hunter, PE License #: 40300

Responsible for sections:

270010 Technology General Provisions 270526 Grounding & Bonding for

Telecommunications Systems 270528 Raceways for Technology 271000 Structured Cabling System 274100 Audio Visual Systems 281000 Electronic Security Systems 282000 Close Circuit Television-Video

Surveillance System

END OF DOCUMENT

LIST OF DRAWING SHEETS

000115 - 1

DOCUMENT 000115 - LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

01 GENERAL

G100 TITLE SHEET

G101 ABBREVIATIONS, LEGEND, & CONDOC

G102 ADA DETAILS

02 LIFE SAFETY

LS101 FIRST FLOOR LIFE SAFETY PLAN

03 CIVIL

C000 COVER & INDEX SHEET

C100 EXISTING CONDITIONS & DEMOLITION PLAN

C200 SITE PLAN

C201 SITE DETAILS

C202 SITE DETAILS

C300 GRADING & DRAINAGE PLAN

C301 STORMWATER DETENTION POND DETAILS

C302 STORM DRAINAGE DETAILS

C303 STORM DRAINAGE DETAILS

C304 STORM DRAINAGE DETAILS

C400 WATER & SANITARY SEWER PLAN

C401 WATER & SANITARY SEWER DETAILS

C501 SWPPP PHASE 1 – INITIAL PHASE

C502 SWPPP PHASE 2 – CONSTRUCTION PHASE

C503 SWPPP PHASE 3 – STABILIZATION PHASE

C504 SWPPP DETAILS

C505 SWPPP DETAILS

C506 SWPPP DETAILS

05 ARCHITECTURAL

A100 EDGE OF SLAB PLAN

A101 FIRST FLOOR PLAN

A102 FIRST FLOOR DIMENSION PLAN

A110 ROOF PLAN

A124 TYPICAL SEISMIC CEILING DETAILS

A201 EXTERIOR ELEVATIONS

A202 EXTERIOR ELEVATIONS

A301 BUILDING SECTIONS

A302 BUILDING SECTIONS

A310 WALL SECTIONS

A311 WALL SECTIONS

000115 - 2

A312 WALL SECTIONS

A313 WALL SECTIONS

A320 SECTION DETAILS

A321 SECTION DETAILS

A401 ENLARGED PLANS & INTERIOR ELEVATIONS

A402 ENLARGED PLANS & INTERIOR ELEVATIONS

A403 ENLARGED PLANS & INTERIOR ELEVATIONS

A404 ENLARGED PLANS & INTERIOR ELEVATIONS

A405 INTERIOR ELEVATIONS

A501 CASEWORK SECTIONS

A502 CASEWORK SECTIONS

A510 DETAILS

A511 MOCK-UP PANEL

A601 DOOR SCHEDULE & LEGENDS

A602 STOREFRONT LEGEND

A603 HEAD, JAMB, & SILL DETAILS

A621 PARTITION TYPES

A623 WALL, FLOOR, & ROOF TYPES

A700 FIRST FLOOR FINISH PLAN

A701 FINISH SCHEDULES

A901 RENDERING

A902 RENDERING

A903 RENDERING

A904 RENDERING

06 STRUCTURAL

S001 GENERAL NOTES

S002 BASIS OF DESIGN

S101 FOUNDATION / SLAB PLAN

S201 ROOF FRAMING PLAN

S202 HIGH ROOF FRAMING PLAN

S301 SECTIONS AND DETAILS

S302 SECTIONS AND DETAILS

S401 SECTIONS AND DETAILS

S402 SECTIONS AND DETAILS

S501 MASONRY DETAILS

S601 BRACING ELEVATIONS

S602 BRACING DETAILS

S603 SECTIONS AND DETAILS

07 MECHANICAL

M001 HVAC SCHEDULES

M002 HVAC SCHEDULES

M100 FIRST FLOOR PLAN – HVAC

M110 ROOF PLAN – HVAC

M400 DETAILS – HVAC

M401 DETAILS – HVAC

08 PLUMBING

P001 PLUMBING NOTES, LEGENDS, & SCHEDULES

P002 PLUMBING SCHEDULES & DETAILS

000115 - 3

P101 FLOOR PLAN – PLUMBING – SUPPLY

P102 FLOOR PLAN – PLUMBING – WASTE / VENT

P110 ROOF PLAN – PLUMBING

P200 PLUMBING – WASTER / VENT RISER

09 ELECTRICAL

E001 SITE PLAN

E002 ONE-LINE DIAGRAM – MAIN SERVICE

E003 ONE-LINE DIAGRAM – UPS SERVICE

E004 PANELBOARD SCHEDULES

E005 PANELBOARD SCHEDULES

E006 PANELBOARD SCHEDULES

E100 LIGHTING DETAILS

E101 FIRST FLOOR PLAN

E200 ELECTRICAL DETAILS

E201 FIRST FLOOR PLAN – ELECTRICAL

E202 MECH. PLATFORM – ELECTRICAL

E210 ENLARGED FLOOR PLANS – ELECTRICAL

E211 CALL CENTER POWER SYSTEMS ANNUNCIATION

E250 OVERALL ROOF PLAN – LIGHTNING PROTECTION SYSTEM

E300 FIRE ALARM DETAILS

E301 FIRST FLOOR PLAN – FIRE ALARM

E401 FIRST FLOOR PLAN – EMERGENY RESPONDER RADIO COVERAGE (ERRC)

10 FIRE PROTECTION

F001 LEGENDS, NOTES, & SCHEDULES – FIRE PROTECTION

F100 FIRST FLOOR PLAN – FIRE PROTECTION

F500 DETAILS – FIRE PROTECTION

F501 ENLARGED PLANS & SCHEMATICS – FIRE PROTECTION

11 TECHNOLOGY

T001 GENERAL NOTES & SHEET INDEX

T002 RESPONSIBILITY MATRIX

T101 VOICE / DATA FLOOR PLAN

T102 SECURITY FLOOR PLAN

T103 A/V FLOOR PLAN

T104 REFLECTED CEILING PLAN

T201 TECHNOLOGY ENLARGED PLANS

T301 TECHNOLOGY RISER DIAGRAMS

T302 TECHNOLOGY RISER DIAGRAMS

T401 TECHNOLOGY DETAILS

T402 TECHNOLOGY DETAILS

T501 DEVICE SCHEDULES

T502 DEVICE SCHEDULES

END OF DOCUMENT 000115

Document A701

– 2018 Instructions to Bidders

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

FEDERAL, STATE, AND LOCAL

LAWS MAY IMPOSE

REQUIREMENTS ON PUBLIC

PROCUREMENT CONTRACTS.

CONSULT LOCAL AUTHORITIES

OR AN ATTORNEY TO VERIFY

REQUIREMENTS APPLICABLE TO

THIS PROCUREMENT BEFORE

COMPLETING THIS FORM.

It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.

for the following Project:

(Name, location, and detailed description)

Clarendon 911/EOC 219 Commerce Street Manning, South Carolina 29102 Clarendon County GIS TMS No. 169-10-02-052-00 Emergency Call Center – Clarendon County

THE OWNER:

(Name, legal status, address, and other information)

Clarendon County 411 Sunset Drive Manning, SC 29102

THE ARCHITECT:

(Name, legal status, address, and other information)

Caplea Coe Architects, Inc.

1643 Means Street Charleston, SC 29412 Telephone Number: (843) 577-6073

TABLE OF ARTICLES

1 DEFINITIONS

2 BIDDER’S REPRESENTATIONS

3 BIDDING DOCUMENTS

4 BIDDING PROCEDURES

5 CONSIDERATION OF BIDS

6 POST-BID INFORMATION

7 PERFORMANCE BOND AND PAYMENT BOND

8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

ARTICLE 1 DEFINITIONS

§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.

§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.

§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.

§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.

§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.

§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.

§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.

ARTICLE 2 BIDDER’S REPRESENTATIONS

§ 2.1 By submitting a Bid, the Bidder represents that:

.1 the Bidder has read and understands the Bidding Documents;

.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;

.3 the Bid complies with the Bidding Documents;

.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;

.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and

.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.

ARTICLE 3 BIDDING DOCUMENTS

§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)

http://clarendoncountyprocurement.sc.gov/solicitations or www.bidnetdirect.com//clarendoncounty

§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165) documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.

§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.

§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.

§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.

§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.

§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least fourteen (14) days prior to the date for receipt of Bids.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)

project@clarendoncountygov.org

§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.

§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.

§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.

§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.

§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)

§ 3.4.2 Addenda will be available where Bidding Documents are on file.

§ 3.4.3 Addenda will be issued no later than seven (7) days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.

ARTICLE 4 BIDDING PROCEDURES

§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.

§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.

§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.

§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.

§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form.

§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.

§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.

§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.

§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:

(Insert the form and amount of bid security.)

AIA Document A310-2010 "Bid Bond", Cashier’s check, or Certified check of not less than five percent (5%) of the base bid

§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.

§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165) affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning 60 days after the opening of Bids, withdraw its Bid and request the return of its bid security.

§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:

(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)

Bids are to be submitted on the bid form provided, enclosed in a sealed opaque envelope bearing the name and address of the bidder, contractor’s license number, identification of contract being bid, and name of project. All bids must comply with the laws of the State of South Carolina.

§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.

§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.

§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.

§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.

§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.

§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:

(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)

At the Owner's discretion.

ARTICLE 5 CONSIDERATION OF BIDS

§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.

§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.

§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.

ARTICLE 6 POST-BID INFORMATION

§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.

§ 6.2 (Paragraphs deleted) Submittals (Paragraphs deleted) § 6.2.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:

.1 a designation of the Work to be performed with the Bidder’s own forces;

.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and

.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

§ 6.2.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.

§ 6.2.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.

§ 6.2.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.

ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND

§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.

§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.

§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.

(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)

§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.

§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.

§ 7.2.3 The bonds shall be dated on or after the date of the Contract.

§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.

ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:

.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.

(Insert the complete AIA Document number, including year, and Document title.)

.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.

.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.

.4 Building Information Modeling Exhibit, if completed:

.5 Drawings

Number Title Date See Attached List of Drawings

.6 Specifications

Section Title Date Pages See Attached List of Specifications

.7 Addenda:

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:25:53 ET on 04/23/2025 under Order No.4104245517 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1850554165)

Number Date Pages

.8 Other Exhibits:

(Check all boxes that apply and include appropriate information identifying the exhibit where required.)

[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:

(Insert the date of the E204-2017.)

[ ] The Sustainability Plan:

Title Date Pages

[ ] Supplementary and other Conditions of the Contract:

Document Title Date Pages Exhibit A Clarendon County

Supplemental Instructions

16 April 2025 5

.9 Other documents listed below:

(List here any additional documents that are intended to form part of the Proposed Contract Documents.)

Clarendon County, SC

SUPPLEMENTAL INSTRUCTIONS

EXPERIENCE AND REFERENCE CHECKS: The County reserves the right to consider historic information and fact, whether gained from the offeror's proposal, question and answer conferences, references, or any other source, in the evaluation process. Offeror acknowledges (1) that County will contact various persons who are familiar with Offeror's prior work and related matters, whether such persons are voluntarily disclosed to County in this proposal or not; (2) that truthful and complete information is necessary for the County to make an adequate evaluation; and (3) that Offeror will not take any action against the person who responds in good faith to a bona fide inquiry by the County for purposes of evaluating the proposals received by the County under this solicitation.

ETHICS CERTIFICATE: By submitting an offer, the offeror certifies that the offeror has and will comply with, and has not, and will not, induce a person to violate Title 8, Chapter 13 of the South Carolina Code of Laws, as amended (ethics act). The following statutes require special attention: Section 8-13-700, regarding use of official position for financial gain; Section 8-13-705, regarding gifts to influence action of public official;

Section 8-13-720, regarding offering money for advice or assistance of public official;

Sections 8-13-755 and 8-13-760, regarding restrictions on employment by former public official; Section 8-13-775, prohibiting public official with economic interests from acting on contracts; Section 8-13-790, regarding recovery of kickbacks; Section 8-13-1150, regarding statements to be filed by consultants; and Section 8-13-1342, regarding restrictions on contributions by contractor to candidate who participated in awarding of contract. The County may rescind any contract and recover all amounts expended as a result of any action taken in violation of this provision. If contractor participates, directly or indirectly, in the evaluation or award of public contracts, including without limitation, change orders or task orders regarding a public contract, contractor shall, if required by law to file such a statement, provide the statement required by Section 8-13-1150 to the procurement officer at the same time the law requires the statement to be filed.

EXHIBIT A

scoe Text Box 16 April 2025

01 GENERAL

G100 TITLE SHEET

G101 ABBREVIATIONS, LEGEND, & CONDOC

G102 ADA DETAILS

02 LIFE SAFETY

LS101 FIRST FLOOR LIFE SAFETY PLAN

03 CIVIL

C000 COVER & INDEX SHEET

C100 EXISTING CONDITIONS & DEMOLITION PLAN

C200 SITE PLAN

C201 SITE DETAILS

C202 SITE DETAILS

C300 GRADING & DRAINAGE PLAN

C301 STORMWATER DETENTION POND DETAILS

C302 STORM DRAINAGE DETAILS

C303 STORM DRAINAGE DETAILS

C304 STORM DRAINAGE DETAILS

C400 WATER & SANITARY SEWER PLAN

C401 WATER & SANITARY SEWER DETAILS

C501 SWPPP PHASE 1 – INITIAL PHASE

C502 SWPPP PHASE 2 – CONSTRUCTION PHASE

C503 SWPPP PHASE 3 – STABILIZATION PHASE

C504 SWPPP DETAILS

C505 SWPPP DETAILS

C506 SWPPP DETAILS

05 ARCHITECTURAL

A100 EDGE OF SLAB PLAN

A101 FIRST FLOOR PLAN

A102 FIRST FLOOR DIMENSION PLAN

A110 ROOF PLAN

A124 TYPICAL SEISMIC CEILING DETAILS

A201 EXTERIOR ELEVATIONS

A202 EXTERIOR ELEVATIONS

A301 BUILDING SECTIONS

A302 BUILDING SECTIONS

A310 WALL SECTIONS

A311 WALL SECTIONS

A312 WALL SECTIONS

A313 WALL SECTIONS

A320 SECTION DETAILS

A321 SECTION DETAILS

A401 ENLARGED PLANS & INTERIOR ELEVATIONS

A402 ENLARGED PLANS & INTERIOR ELEVATIONS

A403 ENLARGED PLANS & INTERIOR ELEVATIONS

A404 ENLARGED PLANS & INTERIOR ELEVATIONS

A405 INTERIOR ELEVATIONS

A501 CASEWORK SECTIONS

A502 CASEWORK SECTIONS

A510 DETAILS

A511 MOCK-UP PANEL

A601 DOOR SCHEDULE & LEGENDS

A602 STOREFRONT LEGEND

A603 HEAD, JAMB, & SILL DETAILS

A621 PARTITION TYPES

A623 WALL, FLOOR, & ROOF TYPES

A700 FIRST FLOOR FINISH PLAN

A701 FINISH SCHEDULES

A901 RENDERING

A902 RENDERING

A903 RENDERING

A904 RENDERING

06 STRUCTURAL

S001 GENERAL NOTES

S002 BASIS OF DESIGN

S101 FOUNDATION / SLAB PLAN

S201 ROOF FRAMING PLAN

S202 HIGH ROOF FRAMING PLAN

S301 SECTIONS AND DETAILS

S302 SECTIONS AND DETAILS

S401 SECTIONS AND DETAILS

S402 SECTIONS AND DETAILS

S501 MASONRY DETAILS

S601 BRACING ELEVATIONS

S602 BRACING DETAILS

S603 SECTIONS AND DETAILS

07 MECHANICAL

M001 HVAC SCHEDULES

M002 HVAC SCHEDULES

M100 FIRST FLOOR PLAN – HVAC

M110 ROOF PLAN – HVAC

M400 DETAILS – HVAC

M401 DETAILS – HVAC

08 PLUMBING

P001 PLUMBING NOTES, LEGENDS, & SCHEDULES

P002 PLUMBING SCHEDULES & DETAILS

P101 FLOOR PLAN – PLUMBING – SUPPLY

P102 FLOOR PLAN – PLUMBING – WASTE / VENT

P110 ROOF PLAN – PLUMBING

P200 PLUMBING – WASTER / VENT RISER

09 ELECTRICAL

E001 SITE PLAN

E002 ONE-LINE DIAGRAM – MAIN SERVICE

E003 ONE-LINE DIAGRAM – UPS SERVICE

E004 PANELBOARD SCHEDULES

E005 PANELBOARD SCHEDULES

E006 PANELBOARD SCHEDULES

E100 LIGHTING DETAILS

E101 FIRST FLOOR PLAN

E200 ELECTRICAL DETAILS

E201 FIRST FLOOR PLAN – ELECTRICAL

E202 MECH. PLATFORM – ELECTRICAL

E210 ENLARGED FLOOR PLANS – ELECTRICAL

E211 CALL CENTER POWER SYSTEMS ANNUNCIATION

E250 OVERALL ROOF PLAN – LIGHTNING PROTECTION SYSTEM

E300 FIRE ALARM DETAILS

E301 FIRST FLOOR PLAN – FIRE ALARM

E401 FIRST FLOOR PLAN – EMERGENY RESPONDER RADIO COVERAGE (ERRC)

10 FIRE PROTECTION

F001 LEGENDS, NOTES, & SCHEDULES – FIRE PROTECTION

F100 FIRST FLOOR PLAN – FIRE PROTECTION

F500 DETAILS – FIRE PROTECTION

F501 ENLARGED PLANS & SCHEMATICS – FIRE PROTECTION

11 TECHNOLOGY

T001 GENERAL NOTES & SHEET INDEX

T002 RESPONSIBILITY MATRIX

T101 VOICE / DATA FLOOR PLAN

T102 SECURITY FLOOR PLAN

T103 A/V FLOOR PLAN

T104 REFLECTED CEILING PLAN

T201 TECHNOLOGY ENLARGED PLANS

T301 TECHNOLOGY RISER DIAGRAMS

T302 TECHNOLOGY RISER DIAGRAMS

T401 TECHNOLOGY DETAILS

T402 TECHNOLOGY DETAILS

T501 DEVICE SCHEDULES

T502 DEVICE SCHEDULES

LIST OF SPECIFICATIONS

000100 Table of Contents 000107 Seals Page 000115 List of Drawings AIA Document A701 Instructions to Bidders Bid Bond (AIA A310 reference) AIA Document A101 Standard Form of Agreement between Owner and Contractor (Including Exhibit A) AIA Document A201 General Conditions of the Contract for Construction 001116 Invitation to Bid 002513 Prebid Meetings 003132 Geotechnical Data 004113 Bid Form – Stipulated Sum (Single-Prime Contract 004393 Bid Submittal Checklist

DIVISION 01 – GENERAL REQUIREMENTS

011000 Summary 012100 Allowances 012200 Unit Prices 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013233 Photographic Documentation 013300 Submittal Procedures 014000 Quality Requirements 014100 Collective Inspections and Structural Testing 014339 Mockups 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closet Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training

DIVISION 02 – EXISTING CONDITIONS

024100 Demolition

DIVISION 03 – CONCRETE

031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete 033543 Polished Concrete Finishing

DIVISION 04 – MASONRY

042200 Concrete Unit Masonry

042613 Masonry Veneer

DIVISION 05 – METALS

050505 Galvanic Corrosion Protection 051200 Structural Steel Framing 052100 Steel Joist Framing 053100 Steel Decking 054000 Cold-Formed Metal Framing 055000 Metal Fabrications

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry 064116 Plastic-Laminate-Clad Architectural Cabinets

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation 072726 Fluid-Applied Membrane Air Barriers 074113 Standing-Seam Metal Roof Panels 074213 Formed Metal Wall Panels 074293 Soffit Panels 074616 Aluminum Siding 075216 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Protected Membrane

Roofing 076200 Sheet Metal Flashing and Trim 077100 Roof Specialties 077200 Roof Accessories 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants 079219 Acoustical Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 084113 Aluminum-Framed Entrances and Storefronts 087100 Door Hardware 084200 Aluminum-Framed Ballistics Rated Entrances and Storefronts 088000 Glazing 088117 Fire-Rated Glass 089119 Fixed Louvers

DIVISION 09 - FINISHES

092216 Non-Structural Metal Framing 092900 Gypsum Board 093000 Tiling 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096536 Static-Control Resilient Flooring 096813 Tile Carpeting 096900 Access Flooring

099113 Exterior Painting 099123 Interior Painting 099600 High-Performance Coatings

DIVISION 10 - SPECIALTIES

101100 Visual Display Units 101416 Plaques 101419 Dimensional Letter Signage 101423 Room-Identification Panel Signage 102113…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .