This is a design layout and construction drawing document for the Devil's Gate Station Cistern project located in Georgetown, Colorado, prepared for the Applegate Group, Inc. by Water Resource Advisors for the West Applegate Group, Inc. The project involves the design and construction of a cistern system with associated infrastructure including C900 PVC piping, concrete work, electrical components, grading, landscaping, sediment and erosion control measures, and Seametrics A3000 flow meters. The project is situated in Clear Creek County and has obtained a driveway permit numbered SDR2018-0011. The construction is scheduled to commence in Fall 2018 with completion anticipated in Spring 2019. The design documents consist of ten sheets total, including a cover sheet, general notes and specifications, overall and detailed site plans, grading and landscape plans, plan and profile views, and construction details. The survey work was completed on August 17, 2017 by EPP & Associates using NAD83 Colorado State Plane Central Zone and GEOID09 coordinate systems.
The document contains no information regarding pricing terms, set asides, incumbents, funding sources, or other contractual elements. Rather, it represents the finalized technical and design specifications issued for bid purposes, with the engineering provided by EPP & Associates of Craig, Colorado, and the owner identified as the Applegate Group, Inc. of Denver, Colorado. The drawings establish the technical requirements and specifications necessary for contractors to submit competitive bids for the construction phase of the cistern installation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Architectural_2018 0711 Devil's Gate Cistern_Part1.pdf | ||
| Electrical_070918 - Devil's Gate Cistern Addition - RJM - Review Comments - STAMPED.pdf | ||
| CII P29260.1 GLRR.bidding contractors.pdf | ||
| Architectural_2018 0711 Devil's Gate Cistern_Part2.pdf | ||
| HCCistern_BidQuestions_Response.pdf | ||
| Devil's Gate Cistern Bid Sheet_Aug2018.pdf | ||
| SC8.1 DBLS GC.docx | DOCX document | |
| SC622PerfBond.docx | DOCX document | |
| sbp-612_0 Information for Bidders.doc | DOC document | |
| sbp-613 BID.docx | DOCX document | |
| Civil_Georgetown Loop 8-13-18 a_Part2.pdf | ||
| SC6221LMBond.docx | DOCX document | |
| SheetE501.pdf | ||
| Structural_18001 Devils Gate Cistern 2018-08-10r.pdf | ||
| 2015-026P14_Devil's Gate Station Cistern Intro for bid docs 9-2018.docx | DOCX document | |
| sbp-614 Bid Bond.docx | DOCX document | |
| SC6.21 DBB A .docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
R E
V
IS
IO
N
S
W at er R es ou rc e
A dv is or s f or th e
W es t
A pp le ga te G ro up
, In c.
-0
P
D
E V
IL
's
G A
T E
S T
A T
IO
N
C
IS
T E
R N
C
IS
T E
R N
D E
S
IG
N L
A Y
O U
T
C O
V E
R S
H E
E
TGEORGETOWN, COLORADO
CISTERN DESIGN LAYOUT
2015-026P14 DEVIL's GATE STATION CISTERN
VICINITY MAP
ENGINEER:
OWNER:
SURVEY:
FINAL DRAWINGS
ISSUED FOR BID
HISTORY COLORADO
1200 N. BROADWAY
DENVER, CO 80203
(303) 447-8679
APPLEGATE GROUP, INC.
1490 WEST 121st AVE., SUITE 100
DENVER, CO 80234
(970) 945-9686
EPP & ASSOCIATES
433 4th AVENUE
P.O. BOX 1444
CRAIG, CO 81625
(970) 824-8236
Sheet Index
No. Sheet Title
1 COVER SHEET
GENERAL NOTES AND
SPECIFICATIONS
GENERAL NOTES AND
SPECIFICATIONS
4 OVERALL SITE PLAN
5 SITE PLAN
6 GRADING AND LANDSCAPE
PLAN
7 PLAN AND PROFILE
8 DETAILS
9 DETAILS
10 DETAILS
NOTE:
APPROXIMATE CONSTRUCTION SCHEDULE:
FALL 2018 - SPRING 2019
CLEAR CREEK COUNTY DRIVEWAY
PERMIT NUMBER SDR2018-0011
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
R E
V
IS
IO
N
S
W at er R es ou rc e
A dv is or s f or th e
W es t
A pp le ga te G ro up
, In c.
-0
P
D
E V
IL
's
G A
T E
S T
A T
IO
N
C
IS
T E
R N
C
IS
T E
R N
D E
S
IG
N L
A Y
O U
T
G E
N E
R A
L N
O T
E S
A N
D S
P E
C
IF
IC
A
T
IO
N S
GENERAL
CONCRETE
ELECTRICAL
BACKFILL
FENCE
C900 PVC PIPE
CISTERN(S)
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
R E
V
IS
IO
N
S
W at er R es ou rc e
A dv is or s f or th e
W es t
A pp le ga te G ro up
, In c.
-0
P
D
E V
IL
's
G A
T E
S T
A T
IO
N
C
IS
T E
R N
C
IS
T E
R N
D E
S
IG
N L
A Y
O U
T
G E
N E
R A
L N
O T
E S
A N
D S
P E
C
IF
IC
A
T
IO
N S
PUMP
SEAMETRICS A3000 FLOW METERS
GRADING
SEDIMENT AND EROSION CONTROL
ARCHITECTURAL
STRUCTURAL
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
R E
V
IS
IO
N
S
W at er R es ou rc e
A dv is or s f or th e
W es t
A pp le ga te G ro up
, In c.
-0
P
D
E V
IL
's
G A
T E
S T
A T
IO
N
C
IS
T E
R N
C
IS
T E
R N
D E
S
IG
N L
A Y
O U
T
O V
E R
A L L S
IT
E
P L A
N
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
R E
V
IS
IO
N
S
W at er R es ou rc e
A dv is or s f or th e
W es t
A pp le ga te G ro up
, In c.
-0
P
D
E V
IL
's
G A
T E
S T
A T
IO
N
C
IS
T E
R N
C
IS
T E
R N
D E
S
IG
N L
A Y
O U
T
S
IT
E P
L A
N
NOTE:
SURVEY COMPLETED ON AUGUST 17, 2017
BY EPP AND ASSOCIATES IN NAD83,
COLORADO STATE PLANE CENTRAL ZONE,
GEOID09.
File details come from the government source that posted it. Updated .