2015-026P14_Devil's Gate Station Cistern Intro for bid docs 9-2018.docx
DOCX document 20 KB Posted
- Solicitation number
- RFP GCAA 2019000041 4
- Issued by
- Clear Creek County, Denver City, Colorado
About this file
This is a bid document introduction for a construction project issued by History Colorado for the Georgetown Loop Railroad property in Clear Creek County. The project involves constructing a storage cistern system at the Devil's Gate Visitor's Center to augment potable water supply and meet water augmentation requirements for Clear Creek water rights. The scope of work includes constructing a new storage building with two 2,000-gallon cisterns, installing a self-priming centrifugal pump, flow meters, and associated plumbing and electrical infrastructure, as well as installing two parallel 4-inch diameter PVC pipes running to a new headwall near Clear Creek. Additional work includes tree removal, sediment and erosion control, and site restoration. A mandatory walkthrough was scheduled for September 12, 2018, at 10:00 AM at Devil's Gate Station in Georgetown. Questions were due by 4:00 PM on September 18, 2018, with answers posted by September 21, 2018. Bids were due by 2:00 PM on October 1, 2018, with project completion required by spring 2019.
The total project budget is $240,000. Contractors must demonstrate expertise in building, electrical, and environmental codes; compliance with Colorado Office of State Architect building codes; building foundations; concrete forming; stamped and colored concrete; PVC piping; flow measurement meters; rock wall demolition; steel fencing; large tank installation; roofing; and erosion and sediment control. The project administrator is Applegate Group, located at 1490 West 121st Avenue, Suite 100, Denver, Colorado 80234, with contact number (303) 452-6611.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Architectural_2018 0711 Devil's Gate Cistern_Part1.pdf | ||
| Electrical_070918 - Devil's Gate Cistern Addition - RJM - Review Comments - STAMPED.pdf | ||
| CII P29260.1 GLRR.bidding contractors.pdf | ||
| Civil_Georgetown Loop 8-13-18 a_Part1.pdf | ||
| Architectural_2018 0711 Devil's Gate Cistern_Part2.pdf | ||
| HCCistern_BidQuestions_Response.pdf | ||
| Devil's Gate Cistern Bid Sheet_Aug2018.pdf | ||
| SC8.1 DBLS GC.docx | DOCX document | |
| SC622PerfBond.docx | DOCX document | |
| sbp-612_0 Information for Bidders.doc | DOC document | |
| sbp-613 BID.docx | DOCX document | |
| Civil_Georgetown Loop 8-13-18 a_Part2.pdf | ||
| SC6221LMBond.docx | DOCX document | |
| SheetE501.pdf | ||
| Structural_18001 Devils Gate Cistern 2018-08-10r.pdf | ||
| sbp-614 Bid Bond.docx | DOCX document | |
| SC6.21 DBB A .docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2015-026P14/Devil's Gate Station Cistern Bid Document Intro September 2018
History & Purpose History Colorado has operated the Georgetown Loop Railroad as a historic property since the 1970s. The property is a tourist attraction for Clear Creek County, and brings in visitors from all over that generate County-wide revenue. Water needs at the property include potable water use at the Devil’s Gate Visitor’s Center on the Georgetown side of the railroad. History Colorado uses an existing well to provide water for the restroom at the Visitor’s Center, and is in need of augmenting that use at certain times of year to prevent injury to other water rights on Clear Creek. Storage is needed in the vicinity of the Devil’s Gate Visitor’s Center to meet augmentation needs. History Colorado plans to construct a storage cistern adjacent to the existing Visitor’s Center that will include two (2) 2,000 gallon storage cisterns in a new storage building to be constructed with architecture that is consistent with the existing Visitor’s Center building. The new structure will also house a self-priming centrifugal pump, flow meters, and related plumbing and electrical work. In addition, two parallel 4-inch diameter PVC pipes will run from the new structure to the new headwall located near Clear Creek. Contractor will be responsible for tree removal, sediment and erosion control, and site restoration.
There is a MANDATORY walk through scheduled for Wednesday, September 12, 2018 at 10:00AM.
The meeting location is at Devil’s Gate Station/Georgetown Loop Railroad in Georgetown.
Questions regarding this solicitation must be submitted by 4:00 PM September 18, 2018.
Answers will be posted to Colorado Bids/VSS by 4:00 PM September 21, 2018.
Bids are due by 2:00 PM October 1, 2018.
Total budget for this project is $240,000. Project needs to be completed by spring 2019.
Required Contractor Skills For this specific project, it is important that the selected contractor have knowledge in the following areas:
· Building, electrical and environmental codes; compliance with Colorado Office of State Architect’s building codes
· Building foundations
· Concrete forming
· Stamped and colored concrete
· PVC Piping
· Flow Measurement meters
· Rock wall demolition
· Steel fencing
· Large tank installation
· Roofing
· Erosion and sediment control
| www.applegategroup.com |
| 1490 West 121st Avenue, Suite 100 |
Denver, CO 80234
(303) 452-6611