About this file
This document is a civil engineering drainage management plan for a New Mexico State University (NMSU) Department of Agriculture office building project located at 967 Agriculture Way in Las Cruces, New Mexico. The project involves detailed hydrological analysis and drainage management for a new building site, with a focus on existing and proposed site conditions, runoff calculations, and flood risk mitigation. The documentation includes comprehensive analysis of four existing drainage basins and five proposed drainage basins, utilizing NOAA Atlas 14 rainfall data and US Army Corps of Engineers hydrologic modeling system (HEC-HMS) to calculate 100-year, 24-hour storm event impacts.
The analysis reveals that the proposed development will result in a minor increase of 0.06 acre-feet of runoff volume compared to current conditions. The project team identified a retention volume deficiency of 0.23 acre-feet, which they propose to address through future campus-wide stormwater management improvements. The finished floor elevation of the proposed building is set at 3905.20, which is 1.46 feet above the highest water elevation on Agriculture Way and 2.93 feet above the water elevation on Espina Street, meeting best practices for flood protection. The documentation includes detailed cross-section analyses, swale calculations, and recommendations for managing stormwater runoff in compliance with NMSU Urban Drainage Criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Rates.pdf | ||
| BID Form rev 2.1.2024.pdf | ||
| Subcontractor Listing.pdf | ||
| ADDENDUM 3.pdf | ||
| Addendum 7.js | JS file | |
| Specifications and Drawings.js | JS file | |
| ADDENDUM 8.pdf | ||
| ADDENDUM 5.pdf | ||
| Addendum 1 Site Visit.pdf | ||
| NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf | ||
| ADDENDUM 6 Docs.pdf | ||
| Addendum 4.pdf | ||
| ADDENDUM 2.pdf | ||
| ADDENDUM 6.pdf | ||
| 1267644-event.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
1.8' HIGH CMU DECORATIVE W
ALL
5.5' HIGH WOOD FENCE
6' HIGH WOOD FENCE
6' HIGH CHAINLINK FENCE
4.5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
5' HIGH METAL FENCE
5' HIGH METAL FENCE
5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
5.3' HIGH BLOCK WALL .67' WIDE
SWING GATE
5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
5' HIGH METAL FENCESWING GATE
7' HIGH CHAINLINK FENCE
7' HIGH CHAINLINK FENCE
7' HIGH CHAINLINK FENCE
SWING CHAINLINK GATE
SWING GATE
6' HIGH
CHAINLINK
FENCE
5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
5' HIGH PIPE FENCE
SW
ING GATE
SW
ING GATE
4.5' HIGH METAL FENCE
5' HIGH PIPE FENCE
SW
ING GATE 4.5' HIGHMETALFENCE
SWING GATE SWING GATE
SWING GATE
4.5' HIGH PIPE FENCE
SW
ING GATE
GREGG STREET
PULL BOX
VAULT
VAULT
PULL BOX
PULL BOX
PULL BOX
PULL BOXTRANSFORMER
PULL BOX
BH 20-396-032" ALUMINUM CAPON 0.625" REBARSTAMPED "BH 20-396-03"
N = 465304.724E = 1484409.981ELEV = 3902.292
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMM
COMM
C O
M M
C O
M M
C O
M M
COMM
COMM
COMMCOMM
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMMCOMM
COMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMM
COMM
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
C O
M M
C O
M M
C O
M M
SD
SD
SDE
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEE
EEEEEE
E
E
E
E E E E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E E
E E
E
E
E
E
E
E
E E
E
E E E E
EEEEE
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E E E E E E E E E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
E E E E E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEE
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
EEEEE
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E E E E E E E E E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
E E E E E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
EEEEE
E E
E E
E E E E E E E E E E E E E E E E E E
EEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
EEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E
ESPINA STREET
KNOX STREET
GREGG STREET
EXISTING BASIN 1
Q100YR-24HR= 14.19 CFS
V100YR-24HR= 0..55 AC-FT
EXISTING BASIN 2
Q100YR-24HR= 3.28 CFS
V100YR-24HR= 0.13 AC-FT
EXISTING BASIN 3
Q100YR-24HR= 2.83 CFS
V100YR-24HR= 0.11 AC-FT
EXISTING BASIN 4
Q100YR-24HR= 1.12 CFS
V100YR-24HR= 0.05 AC-FT
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
DATE
07/23/2024
N M
SU
N
M D
EP
T
O F
AG
R
IC
U
LT
U
R E
O
FF
IC
E
BU
IL
D
IN
G
AG
R
IC
U
LT
U R
E W
AY
LA
S C
R U
C
ES
, N
EW
M
EX
IC
O
AP
22-0227.001
NP
ISSUED FOR
CONSTRUCTION
10/09/2024
SITE
FEMA MAP
LEGEND
HISTORIC/PRE-DEVELOPED CONDITIONS
CURRENT EXISTING CONDITIONS
Fr i, 2
7-S ep
-20
- 1 1:4
4:a m, P lot ted by
: N
PI
ER
CE
P:
\20
\C
DP
\P lan s\G en era l\2
2_ Ex ist ing
D
MP
.dw g
EXISTING
DRAINAGE
MANAGEMENT
PLAN
C201
24862 R
EENIGNELANOISSEFORP
DER
ET
SI
GE
R
OCI
XEMWEN
AM
I T PATHAK
09.30.2024
S ESPINA ST
AGRICULTURE WAY
S
1.8' HIGH CMU DECORATIVE W
ALL
ADOBE BUILDING
5.3' HIGH BLOCK WALL .67' WIDE
ADOBE BUILDING
ADOBE BUILDING
ADOBE BUILDING
ADOBE BUILDING
ADOBE BUILDING
METALCANOPY
METALCANOPY
ADOBE BUILDING
OVERHANGMETAL STORAGEBARN
PULL BOX
VAULT
VAULT
PULL BOX
PULL BOX
PULL BOX
PULL BOXTRANSFORMER
PULL BOX
BH 20-396-032" ALUMINUM CAPON 0.625" REBARSTAMPED "BH 20-396-03"
N = 465304.724E = 1484409.981ELEV = 3902.292
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMM
COMM
C O
M M
C O
M M
C O
M M
COMM
COMM
COMMCOMM
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMMCOMM
COMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMM
COMM
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
C O
M M
C O
M M
C O
M M
SD
SD
SDE
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEE
EEEEEE
E
E
E
E E E E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E E
E E
E
E
E
E
E
E
E E
E
E E E E
EEEEE
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E E E E E E E E E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
E E E E E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEEEEEEEEEEEEEEEEE
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
EEEEE
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E E E E E E E E E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
E E E E E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
EEEEE
E E
E E
E E E E E E E E E E E E E E E E E E
EEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
EEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E
E
39033904
FF=3904.45
FF=3905.20
FF=3905.20
OFF BASIN 1
Q100YR-24HR= 11.35 CFS
V100YR-24HR= 0.44 AC-FT
POND A
V=0.44 AC-FT
BASIN 1
Q100YR-24HR= 2.74 CFS
V100YR-24HR= 0.11 AC-FT
OFF BASIN 2
Q100YR-24HR= 3.06 CFS
V100YR-24HR= 0.12 AC-FT
BASIN 2
Q100YR-24HR= 4.97 CFS
V100YR-24HR= 0.19AC-FT
BASIN 3
Q100YR-24HR= 1.02 CFS
V100YR-24HR= 0.04 AC-FT
A
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
PROJECT
REVISIONS
SHEET NO
DRAWING NAME
SEAL
DATE
REVIEWED BY
PROJECT NO
DRAWN BY
DATE
07/23/2024
N M
SU
N
M D
EP
T
O F
AG
R
IC
U
LT
U
R E
O
FF
IC
E
BU
IL
D
IN
G
AG
R
IC
U
LT
U R
E W
AY
LA
S C
R U
C
ES
, N
EW
M
EX
IC
O
AP
22-0227.001
NP
ISSUED FOR
CONSTRUCTION
10/09/2024
1"=30'
30 15 0 30
A
B
LEGEND
INTRODUCTION:
THE PROPOSED NMDA BUILDING 330 IS LOCATED NEAR THE NORTHWEST CORNER OF
AGRICULTURE WAY AND ESPINA STREET, JUST EAST OF THE EXISTING BUILDING 643
WITHIN THE NMSU CAMPUS. THE SITE WAS PREVIOUSLY DEVELOPED WITH AN EXISTING
BUILDING BUT IT HAS RECENTLY BEEN DEMOLISHED FOR THIS PROPOSED DEVELOPMENT.
THE MAJORITY OF THE PROPOSED IMPROVEMENTS ARE TO BE INSTALLED IN THE SAME
LOCATION OF THE PRIOR BUILDING FOOTPRINT.
METHODOLOGY:
THE METHODOLOGY SELECTED TO COMPUTE RUNOFF VOLUMES IS BASED ON THE NMSU
URBAN DRAINAGE CRITERIA PROVIDED BY NMSU. RAINFALL VALUES WERE DETERMINED
FROM THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) ATLAS 14. THE
BASINS WERE ANALYZED FOR THE 100 YEAR - 24 HOUR STORM EVENT USING THE US ARMY
CORPS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER'S HYDROLOGIC MODELING
SYSTEM (HEC-HMS, VERSION 4.11). SURFACE CHARACTERISTICS AFFECTING INITIAL
ABSTRACTION AND INFILTRATION RATES ARE REPRESENTED BY CURVE NUMBERS AND
WERE DETERMINED USING THE NATIONAL RESOURCES CONSERVATION SERVICE (NRCS)
SOIL SURVEY DATABASE. CURVE NUMBERS FOR EACH DRAINAGE BASIN WERE ASSIGNED
USING THE NRCS SOIL SURVEY GEOGRAPHIC DATABASE AND APPROPRIATE LAND
TREATMENT TYPES AS ESTABLISHED IN THE NMDOT DRAINAGE MANUAL. FOR PURPOSE OF
THIS ANALYSIS, TABLES 402-2 THROUGH 402-5 WERE UTILIZED.
EXISTING CONDITIONS:
THE EXISTING SITE IN ITS CURRENT CONDITION CAN BE SEEN TO BE MADE UP OF FOUR
DRAINAGE BASINS AS SHOWN ON THE EXISTING CONDITIONS BASIN SHEET. EX-BASIN 1,
WHICH CONSISTS OF THE MAJORITY OF THE SITE, GENERALLY DRAINS FROM EAST TO
WEST WHERE THE FLOWS GENERATED BY THIS PORTION OF THE SITE DRAIN INTO THE
RETENTION POND AND THEN OVERFLOWS TO KNOX STREET. EX-BASIN 2 IS LOCATED DUE
SOUTH OF THE 643 BUILDING AND SURFACE DRAINS TO THE SOUTH TO AGRICULTURE WAY.
EX-BASIN 3, LOCATED ON THE EASTERN SIDE OF THE SITE SURFACE DRAINS TO THE EAST
TO ESPINA STREET. EX-BASIN 4 IS LOCATED ON THE NORTH SIDE OF THE SITE AND DRAINS
TO THE NORTH THROUGH THE EXISTING PARKING LOT AND THEN EAST TO ESPINA STREET.
IN TOTAL, IT CAN BE SEEN THAT THERE IS A TOTAL FLOW RATE 21.42 CFS FOR THE
100YR-24HR STORM EVENT AND 0.84 AC-FT OF VOLUME IN THE EXISTING CONDITIONS.
EX-BASIN 1 HAS A VOLUME OF 0.55AC-FT DRAINING TO THE WEST, EX-BASIN 2 HAS 0.13
AC-FT DRAINING TO THE NORTH, EX-BASIN 3 HAS 0.11 AC-FT DRAINING TO THE SOUTH, AND
EX-BASIN 4 HAS 0.05 AC-FT DRAINING TO THE NORTH.
HISTORIC CONDITIONS
PER THE NMSU URBAN DRAINAGE CRITERIA SECTIONS II.A.III AND III.C.II.F, THE EXISTING
CONDITIONS SHALL BE CALCULATED ASSUMING HISTORIC/UNDEVELOPED FLOWS. BASED
ON THE TOTAL AREA OF THE LIMITS OF 3.68 ACRES WITH AN SCS CURVE NUMBER OF 63 AND
A 0% IMPERVIOUS AREA, THE TOTAL FLOW RATE IS APPROXIMATELY 5.91 CFS FOR THE
100-24HR STORM EVENT AND A TOTAL OF 0.23 AC-FT OF VOLUME OF RUNOFF FLOWING OFF
THE SITE IN THE HISTORIC/UNDEVELOPED CONDITION.
PROPOSED CONDITIONS:
IN PROPOSED CONDITIONS, THE SITE AREA IS BROKEN UP INTO FIVE DIFFERENT DRAINAGE
BASINS. OFFSITE BASIN 1 CONSISTS OF A MAJORITY OF THE EXISTING SITE THAT
GENERALLY DRAINS FROM EAST TO WEST INTO THE EXISTING RETENTION POND. OFFSITE
BASIN 2 IS LOCATED DUE SOUTH OF THE 643 BUILDING AND SURFACE DRAINS TO THE
SOUTH TO AGRICULTURE WAY. BASIN 1, WHICH CONSISTS OF THE WEST PORTION OF THE
BUILDING AND DRAINS TO THE WEST INTO THE EXISTING RETENTION POND. BASIN 2
CONSISTS OF THE EAST PORTION OF THE BUILDING AND DRAINS TO THE EAST WITHOUT
ATTENUATION DIRECTLY TO ESPINA STREET. BASIN 3 CONSISTS OF THE SOUTHERN
PORTION OF THE BUILDING THAT DRAINS TO THE SOUTH WITHOUT ATTENUATION TO
AGRICULTURE WAY.
IN TOTAL, IT CAN BE SEEN THAT THERE IS A TOTAL FLOW RATE OF 23.14 CFS FOR THE
100YR-24HR STORM EVENT AND 0.90 AC-FT OF VOLUME IN THE PROPOSED CONDITIONS.
OFFSITE BASIN 1 HAS A VOLUME OF 0.44 AC-FT DRAINING TO THE WEST, OFFSITE BASIN 2
HAS 0.12 AC-FT DRAINING TO THE SOUTH, PR-BASIN 1 HAS 0.11 AC-FT DRAINING TO THE
WEST. PR-BASIN 2 HAS 0.19 AC-FT DRAINING TO THE EAST AND PR-BASIN 3 HAS 0.04 AC-FT
DRAINING TO THE SOUTH.
AS REQUIRED BY THE NMSU URBAN DRAINAGE CRITERIA, COMPARING THE TOTAL FLOWS
OF THE SITE FROM THE HISTORIC/PRE-DEVELOPED CONDITIONS TO THE PROPOSED
CONDITIONS AT THE 100-YR 24HR STORM EVENT, WE ARE REQUIRED TO PROVIDE AN
ONSITE RETENTION VOLUME OF 0.67 AC-FT (0.90 - 0.23). THE ALREADY BUILT RETENTION
POND ONLY PROVIDES A TOTAL OF 0.44 AC-FT OF VOLUME AT THE HIGH WATER ELEVATION
OF 3896.20. THEREFORE, THE PROPOSED IMPROVEMENTS ARE DEFICIENT OF
APPROXIMATELY 0.23 AC-FT OF RETENTION VOLUME TO MEET THE REQUIREMENTS.
CONCLUSION
IT'S OUR UNDERSTANDING THAT NMSU HAS FUTURE PLANS FOR THE ENTIRE CAMPUS TO
IMPROVE STORMWATER MANAGEMENT/DRAINAGE AND INCREASE THE OVERALL STORAGE
CAPACITY FOR STORMWATER RUNOFF. THE FINAL MASTER DRAINAGE MANAGEMENT PLAN
PREPARED BY MOLZEN CORBIN DATED FEBRUARY 2024 SUMMARIZES THESE SOLUTIONS
WHICH ARE DOWNSTREAM OF THIS PROPOSED DEVELOPMENT'S RUNOFF AND WOULD
DIRECTLY BENEFIT THE PROJECT. THEREFORE, TO MEET THE REQUIREMENTS AS
OUTLINED IN THE NMSU URBAN DRAINAGE CRITERIA, WE PROPOSE THAT 0.23 AC-FT OF
RETENTION VOLUME BE ACCOUNTED FOR ELSEWHERE ON THE CAMPUS AS PART OF THOSE
FUTURE IMPROVEMENTS. IN ADDITION, WE ANALYZED AND COMPARED THE CURRENT
EXISTING CONDITIONS (WHERE THE EXISTING 330 BUILDING WAS NOT DEMOLISHED) TO THE
PROPOSED CONDITIONS (WHERE THE NEW BUILDING AND IMPROVEMENTS WILL BE
DEVELOPED). THE EXISTING CONDITIONS VOLUME AT THE 100-YR 24HR STORM EVENT HAD
0.84 AC-FT OF RUNOFF AND THE PROPOSED CONDITIONS VOLUME HAD 0.90 AC-FT OF
RUNOFF. THEREFORE, THERE IS A MINOR INCREASE OF 0.06 AC-FT OF RUNOFF VOLUME
LEAVING THE SITE FROM CURRENT EXISTING CONDITIONS TO PROPOSED CONDITIONS.
TO CALCULATE THE FINISHED FLOOR ELEVATION OF THE PROPOSED BUILDING, WE USED
THE FLOWS FROM THE 1995 MASTER DRAINAGE MANAGEMENT REPORT WITHIN THE
ADJACENT ROADWAYS OF AGRICULTURE WAY AT CROSS SECTION A-A AND ESPINA STREET
AT CROSS SECTION B-B. FOR THE CROSS SECTION A-A ON AGRICULTURE WAY, ABOUT 75%
OF UPSTREAM BASIN 138 (110.25 CFS) AND 20% OF UPSTREAM BASIN 139 (20.2 CFS) IS BEING
ANALYZED FOR A TOTAL FLOW OF 130.45 CFS FOR THE 100YR-24HR STORM EVENT. BASED
ON THE PROPOSED PROFILE OF CROSS SECTION A-A, THE HIGH WATER ELEVATION WITHIN
AGRICULTURE WAY IS 3903.74'.
FOR CROSS SECTION B-B ON ESPINA ST, ABOUT 25% OF UPSTREAM BASIN 138 (36.75 CFS)
AND 20% OF UPSTREAM BASIN 128 (13.6 CFS) IS BEING ANALYZED FOR A TOTAL FLOW OF
50.35 CFS FOR THE 100YR-24HR STORM EVENT. BASED ON THE PROPOSED PROFILE OF
CROSS SECTION B-B, THE HIGH WATER ELEVATION WITHIN ESPINA IS 3902.27'.
THE PROPOSED BUILDING FINISHED FLOOR ELEVATION IS ANTICIPATED TO BE SET AT
3905.20 WHICH IS 1.46-FT ABOVE THE HIGH WATER ELEVATION ON AGRICULTURE WAY AND
IS 2.93-FT ABOVE THE HIGH WATER ELEVATION ON ESPINA ST. KEEPING THE FINISHED
FLOOR 1-FT ABOVE THE HIGHEST WATER ELEVATION OF THE ADJACENT ROADWAY IS BEST
PRACTICE FOR SUFFICIENT FREEBOARD, WHICH THE DESIGN DOES MEET.
SEE CALCULATIONS ENCLOSED FOR MORE INFORMATION
SEE CALCULATIONS ENCLOSED
FOR MORE INFORMATION
A
B
PROPOSED CONDITIONS
PROPOSED
DRAINAGE
MANAGEMENT
PLAN
C202
Fr i, 2
7-S ep
-20
- 1 1:4
4:a m, P lot ted by
: N
PI
ER
CE
P:
\20
\C
DP
\P lan s\G en era l\2
2_ Pr op os ed D
MP
.dw g
24862 R
EENIGNELANOISSEFORP
DER
ET
SI
GE
R
OCI
XEMWEN
AM
I T PATHAK
09.30.2024
Section A-A
MANNING'S N = 0.022 SLOPE = 0.020 (ft/ft)
POINT DIST ELEV POINT DIST ELEV POINT DIST ELEV
1.0 0.0 3905.2 9.0 45.9 3903.7 17.0 99.2 3903.3
2.0 0.6 3905.2 10.0 57.3 3903.2 18.0 100.9 3903.3
3.0 15.3 3904.4 11.0 61.0 3903.2 19.0 102.1 3903.3
4.0 16.5 3904.4 12.0 64.0 3903.3 20.0 102.2 3903.3
5.0 17.1 3904.4 13.0 64.1 3903.3 21.0 103.0 3903.8
6.0 17.2 3904.4 14.0 64.8 3903.2 22.0 105.6 3907.0
7.0 19.7 3904.4 15.0 65.1 3903.2
8.0 27.2 3904.2 16.0 84.5 3903.3
WSEL DEPTH FLOW FLOW WETTED FLOW TOPWID TOPWID TOTAL FROUDE
INC AREA RATE PER VEL PLUS WATER ENERGY NO.
FT. SQ.FT. (CFS) (FT) (FPS) OBSTRUCTIONS (FT)
3903.330 0.100 2.806 4.184 45.494 1.491 48.465 45.485 0.135 1.058
3903.430 0.200 7.661 21.059 49.627 2.749 50.880 49.590 0.318 1.233
3903.530 0.300 12.741 47.611 52.069 3.737 53.294 52.004 0.517 1.331
3903.630 0.400 18.062 82.613 54.512 4.574 55.708 54.418 0.725 1.400
3903.730 0.500 23.624 125.513 56.955 5.313 58.123 56.833 0.939 1.453
3903.830 0.600 29.496 173.759 60.906 5.891 62.031 60.741 1.140 1.490
3903.930 0.700 35.773 229.469 65.008 6.415 66.084 64.794 1.340 1.522
3904.030 0.800 42.455 293.066 69.110 6.903 70.136 68.846 1.541 1.550
3904.130 0.900 49.542 364.769 73.211 7.363 74.189 72.899 1.743 1.575
3904.230 1.000 57.036 444.272 77.459 7.789 78.387 77.097 1.944 1.597
3904.330 1.100 64.985 530.365 82.288 8.161 83.167 81.877 2.136 1.615
3904.430 1.200 73.449 620.600 88.290 8.449 88.421 87.831 2.310 1.629
3904.530 1.300 82.352 738.390 90.557 8.966 90.638 90.048 2.550 1.653
3904.630 1.400 91.457 866.303 92.621 9.472 92.651 92.061 2.796 1.675
3904.730 1.500 100.764 1003.309 94.685 9.957 94.664 94.074 3.042 1.696
3904.830 1.600 110.272 1149.367 96.748 10.423 96.677 96.087 3.290 1.715
3904.930 1.700 119.982 1304.453 98.812 10.872 98.690 98.100 3.539 1.733
3905.030 1.800 129.892 1468.560 100.876 11.306 100.703 100.113 3.788 1.750
3905.130 1.900 140.004 1641.691 102.940 11.726 102.716 102.126 4.039 1.766
Q = 130.45 cfs based off of NMSU Main Campus DMP. 75% basin 138 and 20% basin 139. See enclosed basin map for backup calculations
MWSE = 3903.74'
FFE = 3905.20' and therefore is 1.46-ft above the highest water elevation on Agriculture Way at this cross section.
Section A-A
MANNING'S N = 0.022 SLOPE = 0.020
POINT DIST ELEV POINT DIST ELEV POINT DIST ELEV
1.0 0.0 3905.2 15.0 34.0 3904.1 29.0 85.6 3902.2
2.0 11.8 3905.2 16.0 36.2 3904.0 30.0 85.9 3902.0
3.0 17.5 3905.2 17.0 38.8 3904.0 31.0 86.3 3902.0
4.0 17.7 3905.2 18.0 46.1 3903.6 32.0 87.2 3902.0
5.0 18.0 3905.2 19.0 55.6 3903.3 33.0 107.5 3902.0
6.0 20.0 3905.2 20.0 56.0 3903.3 34.0 128.3 3902.1
7.0 21.2 3905.2 21.0 57.5 3903.2 35.0 130.3 3902.1
8.0 21.3 3905.2 22.0 58.4 3903.2 36.0 133.1 3902.1
9.0 21.7 3905.2 23.0 67.1 3902.9 37.0 136.3 3902.0
10.0 21.9 3905.2 24.0 68.3 3902.8 38.0 139.8 3902.2
11.0 24.9 3905.1 25.0 73.2 3902.6 39.0 143.6 3902.5
12.0 25.2 3904.9 26.0 78.3 3902.5 40.0 149.0 3902.5
13.0 26.2 3904.1 27.0 80.5 3902.5 41.0 154.5 3902.5
14.0 27.1 3904.1 28.0 85.3 3902.3 42.0 160.4 3902.5
WSEL DEPTH FLOW FLOW WETTED FLOW TOPWID TOPWID TOTAL FROUDE
INC AREA RATE PER VEL PLUS WATER ENERGY NO.
FT. SQ.FT. (CFS) (FT) (FPS) OBSTRUCTIONS (FT)
3902.070 0.100 2.864 3.969 51.842 1.386 75.065 51.815 0.130 1.039
3902.170 0.200 8.176 22.089 54.365 2.702 77.559 54.309 0.314 1.227
3902.270 0.300 13.669 51.220 55.638 3.747 78.797 55.547 0.518 1.332
3902.370 0.400 19.317 88.201 58.453 4.566 81.589 58.339 0.724 1.399
3902.470 0.500 25.404 132.030 63.303 5.197 86.433 63.183 0.920 1.445
Q = 50.35 cfs based off of NMSU Main Campus DMP. 25% basin 138 and 20% basin 128. See enclosed basin map for backup calculations
MWSE = 3902.267'
FFE = 3905.20' and therefore is 2.93-ft above the highest water elevation on Espina St at this cross section.
Section B-B
Project Location
SECTION B-B
(Espina St) Assumed 25% of Basin 138 = 36.75 cfs + 20% of Basin 128 = 13.6 cfs =
50.35 cfs
SECTION A-A
(Agriculture Way) Assumed 20% of basin 139 = 20.2 cfs + 75% of Basin 138 =
110.25 = 130.45 cfs total assuming Basin 139 send 20% to section A-A. Basin 139 flow = 101 cfs (20% = 20.2cfs)
Assuming that Basin 138 sends 25% off flow down Espina st and 75% down Gregg St. (now Agricultural Way). Basin 138 = 147 cfs
Assuming 20% of basin 128 gets to section B-B. Basin 128 = 68 cfs (20% =
13.6 cfs)
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jun 21 2024
Swale 1 100yr-24hr
Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 3904.00 Slope (%) = 0.62 N-Value = 0.023
Calculations Compute by: Known Q Known Q (cfs) = 3.08
Highlighted Depth (ft) = 0.36 Q (cfs) = 3.080 Area (sqft) = 1.47 Velocity (ft/s) = 2.10 Wetted Perim (ft) = 5.28 Crit Depth, Yc (ft) = 0.29 Top Width (ft) = 5.16 EGL (ft) = 0.43
0 1 2 3 4 5 6 7 8
Elev (ft) Depth (ft) Section
3903.75 -0.25
3904.00 0.00
3904.25 0.25
3904.50 0.50
3904.75 0.75
3905.00 1.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jun 21 2024
Swale 2 100yr-24hr
Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 3904.00 Slope (%) = 0.62 N-Value = 0.023
Calculations Compute by: Known Q Known Q (cfs) = 1.89
Highlighted Depth (ft) = 0.27 Q (cfs) = 1.890 Area (sqft) = 1.03 Velocity (ft/s) = 1.84 Wetted Perim (ft) = 4.71 Crit Depth, Yc (ft) = 0.22 Top Width (ft) = 4.62 EGL (ft) = 0.32
0 1 2 3 4 5 6 7 8
Elev (ft) Depth (ft) Section
3903.75 -0.25
3904.00 0.00
3904.25 0.25
3904.50 0.50
3904.75 0.75
3905.00 1.00
Reach (ft)
File details come from the government source that posted it. Updated .