Church_St_bridge_construction_as-built_1960.pdf
PDF 179 MB Posted
- Attached to
- Church St Bridge Rehabilitation
- Solicitation number
- 2027-RFQ-CNH-389
- Issued by
- New Haven County, Connecticut
About this file
This is an as-built construction document for the Church Street Bridge in New Haven, Connecticut, dated 1960. The document represents historical engineering and construction records for the City of New Haven and serves as a reference for the current Church Street Bridge Rehabilitation project. The as-built plans detail the original bridge construction specifications, structural design, and physical dimensions as they were completed in 1960, providing baseline documentation of the bridge's constructed condition at that time. These historical records are essential reference materials for the ongoing bridge rehabilitation design and construction-phase services currently being solicited by the City of New Haven.
The as-built documentation establishes the existing structural conditions and original design parameters that will inform the current rehabilitation project scope. This historical record is critical for the professional teams selected through the City's Statements of Qualifications process to understand the bridge's original construction, material specifications, and structural systems. The document serves as a foundational reference for developing rehabilitation strategies and construction methodologies that must account for the bridge's 1960 construction standards and existing physical configuration, ensuring that rehabilitation design and construction work properly address the documented conditions and historical context of this infrastructure asset.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .