Church Hills Phase III Trough Location.kmz
KMZ file 4 KB Posted
- Solicitation number
- AM27-7
- Issued by
- Utah
About this file
This file is a geographical data file (KMZ format) associated with the Church Hills Water Enhancement Pipeline Project Phase III 2026, a procurement conducted by the State of Utah Division of Wildlife Resources through the State of Utah Division of Purchasing. The project involves the installation of approximately 24,000 linear feet (4.54 miles) of 2-inch fusible polyethylene pipe with a minimum SDR 11 rating of 200 PSI, including the fusing of pipeline segments upon installation. The procurement is structured as an Invitation for Bid (IFB) expected to result in a single contract award to the lowest cost responsive and responsible vendor. No mandatory site visit is required for bid submission.
Award determination will be based on the lowest cost per foot methodology, with the selected vendor required to guarantee pricing for the duration of the project. The KMZ file itself contains geographical mapping data depicting the trough location and route alignment for the pipeline installation, serving as a reference document for bidders to understand the project scope and physical layout of the proposed pipeline corridor.
Other files
| File | Type | Posted |
|---|---|---|
| Church Hills Phase III Pipeline 2026.kmz | KMZ file | |
| 3-Attachment A-PO Terms and Conditions.docx | DOCX document | |
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 6-Attachment B-Scope of Work.docx | DOCX document | |
| 5-Church Hills Phase III Project Map 2026 Topo.pdf | ||
| 4-Church Hills Phase III Project Map 2026 Imagery.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .