Church Hills Phase III Trough Location.kmz

KMZ file 4 KB Posted

Attached to
AM26-7 CHURCH HILLS WATER ENHANCEMENT PIPELINE PROJECT PHASE III 2026
Solicitation number
AM27-7
Issued by
Utah

About this file

This file is a geographical data file (KMZ format) associated with the Church Hills Water Enhancement Pipeline Project Phase III 2026, a procurement conducted by the State of Utah Division of Wildlife Resources through the State of Utah Division of Purchasing. The project involves the installation of approximately 24,000 linear feet (4.54 miles) of 2-inch fusible polyethylene pipe with a minimum SDR 11 rating of 200 PSI, including the fusing of pipeline segments upon installation. The procurement is structured as an Invitation for Bid (IFB) expected to result in a single contract award to the lowest cost responsive and responsible vendor. No mandatory site visit is required for bid submission.

Award determination will be based on the lowest cost per foot methodology, with the selected vendor required to guarantee pricing for the duration of the project. The KMZ file itself contains geographical mapping data depicting the trough location and route alignment for the pipeline installation, serving as a reference document for bidders to understand the project scope and physical layout of the proposed pipeline corridor.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .