AM26-7 CHURCH HILLS WATER ENHANCEMENT PIPELINE PROJECT PHASE III 2026
Solicitation number
AM27-7
Issued by
Utah

About this file

This is a Scope of Work document for the Church Hills Water Enhancement Pipeline Project Phase III 2026, issued by the Utah Division of Wildlife Resources (UDWR) in conjunction with the Fishlake Forest Service Fillmore Field Office (USFS). The project involves the installation of approximately 24,000 feet (4.54 miles) of 2-inch HDPE fusible pipe (SDR 11, minimum 200 PSI) in Millard County on USFS-administered lands northwest of Holden, Utah. The contractor must also supply and install three rubber tire troughs with metal floats, valve covers, and float protectors, and connect the pipeline to all three troughs. The installation is scheduled between August 10 and September 24, 2026. No mandatory site visit is required, though contractors are expected to conduct their own inspections before submitting bids. The contract will be awarded to the lowest cost responsive and responsible vendor based on cost per foot, with vendors required to guarantee pricing for the duration of the project.

The contractor must provide all HDPE pipe, troughs, and equipment necessary for installation, including equipment to bury the pipeline approximately 3 feet underground and fuse fittings together. The contractor should possess prior experience with HDPE pipe installation and have specialized equipment such as a tracked dozer with a vibratory ripper. UDWR will provide or purchase additional pipe fittings, floats, cement for troughs, and connection materials as needed. The project site is located at an elevation of 5,400 to 5,800 feet with moderate rolling topography and rough terrain; some tree and brush removal may be necessary. If subcontractors are used, the contractor must submit a complete list with names, primary contacts, addresses, and telephone numbers with their bid submission to State Purchasing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B:

AM26-7 CHURCH HILLS WATER ENHANCEMENT

PIPELINE PROJECT PHASE III 2026

Introduction:

The Utah Division of Wildlife Resources (UDWR) and the Fishlake Forest Service Fillmore Field Office (USFS) is requesting services for the installation of an estimated ~24,000 feet of HDPE Fusible Pipe. Project will consist of a Contractor installing an estimated ~24,000’ (4.54 miles) of 2” fusible pipe (SDR 11 minimum of 200 PSI), along with fusing the pipeline together upon installation. Contractor will also be required to supply three (3) rubbber tire troughs, metal floats, valve covers and float protectors and connect the pipeline to all three (3) rubber tire troughs.

Project is located in Millard County within USFS Administrated Lands. Contractor will need to provide the above mention pipe size along with the total footage listed above. Including all labor costs, equipment and materials to install the pipeline, fuse fittings and connect the pipeline to the three (3) new rubber tire troughs within the project outline.

UDWR will provide or purchase from the contractor additional pipefittings, floats, cement for troughs and or additional connection for the project.

PROJECT INSTALLTION SPECIFICATIONS

Project: Church Hills Water Enhancement Pipeline Project Phase III 2026.

Location: Project is located northwest of Holden, Utah, on USFS Properties. Elevation is 5,400 – 5,800 feet with moderate rolling topography. Vicinity maps showing sites are attached. Access to site is by dirt road. Some north facing slopes will have trees and brush. Project will follow an existing pipeline and will need to be installed within the original footprint.

Linear Feet: Estimated up to ~24,000 Feet of 2” HDPE SDR 11 4710 resin (min. 200 psi )

Pricing: Bids are to be submitted on a cost per foot basis for the cost of the pipe, installation of the pipe and fusing/connecting the new installed pipeline to three water troughs as stated above. Pricing will also include providing three (3) rubber tire troughs along with metal floats and float protectors, valve protectors along with all equipment needed to level and set the troughs along with the installation cost.

Installation Dates:Application scheduled to take place during the time frame of
August 10th – Sept 24th, 2026. There will be no site tour, contractor is to conduct his own inspections of the project before submitting a bid. Project is ready to move forward. Contractor will work closely with the Project Manager, Grazing Permittee and the USFS to schedule optimal installation dates. All HDPE Pipe and troughs will be provided by the contractor. UDWR will provide/purchase the additional fittings or pipe for connecting to the water troughs as needed.

The contractor will need to be equipped with the necessary equipment to install the HDPE pipe underground approximately 3’ Feet. Contractor will also provide equipment to dig up the installed pipeline and fuse fittings together as needed.

Experience: Contractor must have prior experience in the use of this pipe, provide his own equipment to fuse the pipe together, haul and load the pipe and move it to the site. Contractor will be required to install the pipeline cross country, over rough terrain, removal of some trees maybe necessary to install the pipeline. Contractor will be expected to have equipment to handle the pipe. Preferred equipment would be to have a tracked Dozer with a vibratory ripper for the pipe to be installed. References can be submitted with this bid.

Use of Subcontractors: If subcontractors will be completing any part of the outlined work, a list of the subcontractors (including name, primary contact, address and telephone number) must be included with submission of the bid to State Purchasing.

Enclosed Project Maps of Pipeline Location: