5-Church Hills Phase III Project Map 2026 Topo.pdf
PDF 3 MB Posted
- Solicitation number
- AM27-7
- Issued by
- Utah
About this file
This is a project map document related to the Church Hills Water Enhancement Pipeline Project Phase III 2026, a state and local contract opportunity issued by the State of Utah Division of Purchasing on behalf of the Division of Wildlife Resources. The project involves the installation of approximately 24,000 linear feet (4.54 miles) of 2-inch fusible pipe with a minimum SDR 11 rating and 200 PSI pressure capacity, including the fusing of pipeline segments upon installation. The invitation for bid (IFB) anticipates a single contract award to the lowest cost responsive and responsible vendor, with no mandatory site visit required. Award methodology will be based on lowest cost per foot pricing.
Vendors must guarantee their pricing for the duration of the project. The map illustrates the proposed pipeline route, trough locations, and 2026 timeline for the Church Hills Phase III Water Enhancement Project. Additional contractual details, including specific response deadlines, due dates, and funding sources, are not provided in the document itself but would be contained in the full IFB package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Church Hills Phase III Pipeline 2026.kmz | KMZ file | |
| 3-Attachment A-PO Terms and Conditions.docx | DOCX document | |
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 6-Attachment B-Scope of Work.docx | DOCX document | |
| Church Hills Phase III Trough Location.kmz | KMZ file | |
| 4-Church Hills Phase III Project Map 2026 Imagery.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
'4
'4
'4
Legend '4Church Hills Phase III Trough Location Church Hills Phase III Pipeline 2026 ¹
Church Hills Phase III Water Enhancemet Project 2026
File details come from the government source that posted it. Updated .