Christensen BP- TCE Signed(Recorded)Completed.pdf
PDF 508 KB Posted
- Attached to
- Finished Water 3B (FW3B)
- Solicitation number
- ITB 23-0416-01
- Issued by
- Rio Arriba County, New Mexico
About this file
The provided electronic file appears to be a scanned document with repeated characters, which suggests the image may be unreadable or corrupted. Without legible content, I cannot extract specific contract details about the Finished Water 3B (FW3B) project. The basic project overview indicates it involves approximately 5.4 miles of water pipeline installation in New Mexico, including 20-inch polyvinyl chloride and ductile iron pipes with associated infrastructure components. However, I cannot confirm specific contract terms, pricing, or other details from the current document image.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .