Arnold P- PEA Signed(Recorded)Completed.pdf
PDF 598 KB Posted
- Attached to
- Finished Water 3B (FW3B)
- Solicitation number
- ITB 23-0416-01
- Issued by
- Rio Arriba County, New Mexico
About this file
I apologize, but the document provided appears to be a placeholder or corrupted file with repeated "d" characters across multiple pages. Without actual readable content, I cannot summarize the specific details of the contract opportunity.
However, based on the supplemental information you've provided, this appears to be a document related to the Finished Water 3B (FW3B) project in New Mexico, which involves purchasing and installing approximately 5.4 miles of water transmission infrastructure including:
- 20-inch polyvinyl chloride pipe
- 20-inch diameter restrained joint ductile iron pipe
- Trenchless crossings
- Associated appurtenances
To provide a comprehensive summary, I would need to review the actual readable contents of the PDF document. The current file does not contain interpretable text or contract details.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .