Christensen BL- PEA Signed(Recorded)Completed.pdf
PDF 665 KB Posted
- Attached to
- Finished Water 3B (FW3B)
- Solicitation number
- ITB 23-0416-01
- Issued by
- Rio Arriba County, New Mexico
About this file
The document appears to consist of multiple pages of repeated text marked as "dddddd", which suggests the file may be corrupted or unreadable. Without legible content, I cannot provide a comprehensive summary of the specific contract details. However, based on the external context provided, this appears to be related to the Finished Water 3B (FW3B) project in New Mexico, which involves purchasing and installing approximately 5.4 miles of water pipeline infrastructure including 20-inch polyvinyl chloride and ductile iron pipes with associated crossings and appurtenances.
Given the limited readable information, I cannot confidently elaborate on specific pricing terms, funding sources, or contract details. The external description indicates this is a municipal water infrastructure project in New Mexico, but the actual document contents are not interpretable in their current form.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .