CFM_EWP_-_Set_6-20-25.pdf

PDF 7 MB Posted

Attached to
Waterway Debris Collection and Removal / NRCS Emergency Watershed Protection Grant
Solicitation number
RFP 26-060
Issued by
Lee County, Fruitville CDP, Florida

About this file

Summary

This is a construction drawings and specifications document for the City of Fort Myers Public Works Department Engineering Division detailing waterway debris and sediment removal under an NRCS Emergency Watershed Protection Grant. The project encompasses debris removal, sediment removal, bank reshaping, and erosion control repairs across multiple waterways and canals within Fort Myers city limits, including the Caloosahatchee River, Billy's Creek, Eastwood Golf Course Canal, L-3 Canal, Ford Street Canal, Veronica S. Shoemaker Canal, Manuels Branch, Canal Street Canal, Carrell Road Canal, and Winkler Avenue Canal. The scope includes approximately 20,000 linear feet of debris removal, sediment removal and bank reshaping at specified locations, tree clearing for construction access, underwater vegetative debris removal in Billy's Creek (7,500 feet), and erosion control repairs using articulated concrete block mat systems. The construction drawings indicate a project date of June 16, 2025, with revisions dated July 24, 2025, and are sealed by Richard H. Thompson, P.E., Florida Registration No. 46720.

The contractor is responsible for assuring construction compliance with attached drawings and specifications and must provide NRCS with a minimum of 72 hours advance notice before construction commences. All utility owners must be notified of construction scheduling to locate and mark underground utilities at the site, and construction cannot begin until notification is complete. The document includes detailed construction details and debris removal procedures for streams, channels, and canals, along with specifications for sediment and debris disposal as outlined in accompanying construction specifications and quality assurance plans referenced in the document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RESPONSIBILITY: It shall be the responsibility of the cooperator to assure that the project is constructed according to the attached drawings and specifications.

NOTICE OF CONSTRUCTION: NRCS shall be notified a minimum of 72 hours prior to construction.

UTILITIES: NRCS makes no representation as to the existence or non-existence of any utilities at the construction site. Utility Owners must be notified of the date and time construction is scheduled to approach the utility (pipeline, telephone lines, electric lines, etc.). Construction shall not commence until all Utility Owners have been notified and have their utilities located on the ground.

INDEX OF SHEETS

Sheet No. Sheet Title

1 Cover Sheet 2 Debris Removal Location Map 1 3 Debris Removal Location Map 2

Debris Removal & Erosion Control

Repair Site Location Map 3 5 Debris Removal Location Map 4 6 Debris Removal Detail No. 1 7 Debris Removal Detail No. 2 8 Debris Removal Detail No. 3 9 Erosion Control Repair Detail

10 Streambank Erosion Repair Details and Construction Notes

Always call 811 two full business days before you dig to have underground utilities located and marked.

C

IT

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

LIST OF SPECIFICATIONS

NO. TITLE

1 400. STREAM DEBRIS AND SEDIMENT REMOVAL

2 CITY OF FORT MYERS TECHNICAL SPECIFICATIONS

3 QUALITY ASSURANCE PLAN CFM

4 CITY WIDE DEBRIS AND SEDIMENT REMOVAL ENVIRONMENTAL EVALUATION

5 1 SCOPE OF SERVICES

SITE LOCATIONS

CITY OF FORT MYERS

EMERGENCY WATERSHED PROTECTION

WATERWAYS DEBRIS, SEDIMENT REMOVAL

AND BANK RESHAPING

SHEET: SHEET: OF1 10

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

C ov er S he et

Ca loo sa ha tch ee

R ive r

I-7

Ve no ni ca

S . S ho em ak er

U S-

M cG re go r B lvd

. Colonial Blvd.

Palm Beach Blvd.

O rti z Av e

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

SEE SHEET 3 OF 10 FOR

DEBRIS LOCATION MAP

SEE SHEET 2 OF 10 FOR

DEBRIS LOCATION MAP

SEE SHEET 4 OF 10 FOR

DEBRIS LOCATION MAP

AND STREAMBANK EROSION

CONTROL REPAIR SITE LOCATION

SEE SHEET 5 OF 10 FOR

DEBRIS LOCATION MAP

06/16/2025

7/

RT

RE

VI

SE

D

M ar sh A ve

SR 82 Blvd.

Th is it em h as b ee n el ec tro ni ca lly s ig ne d an d se al ed b y

R ic ha rd

H

. T ho m ps on o n th e da te a dj ac en t t o th e se al u si ng a S

H A au th en tic at io n co de

Pr in te d co pi es o f t hi s do cu m en t a re n ot c on si de re d si gn ed a nd se al ed a nd th e

SH

A au th en tic at io n co de m us t b e ve rif ie d on an y el ec tro ni c co pi es

/2 5/

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text S

C

IT

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al L oc at io n

M ap

OF2 10

L-

C

AN

AL

S

ED

IM

EN

T R

EM

O

VA

L

AN

D

B

AN

K R

ES

H

AP

IN

G

Colonial Blvd.

C le ve la nd A ve

U S-

Winkler Ave.

Fowler St.

D eL eo n

St

Sam Fleishman Regional Sports

PAGE FIELD AIRPORT

Ev an s Av e.

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

Complex

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

D

Su m m er lin R d.

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF3 10

WINKLER AVE. CANAL - 3,963'

400' - SEDIMENT REMOVAL AND BANK RESHAPING

M cG re go r B lvd

C le ve la nd A ve

U S-

EDISON MALL

CFM GOLF COURSE

300' - SEDIMENT REMOVAL AND BANK RESHAPING

CARRELL RD. CANAL - 9,327'

Winkler Ave.

Br oa dw ay

A ve

C en tra l A ve

Metro Pkwy

CANAL ST. CANAL - 5,322'

200' - SEDIMENT REMOVAL AND BANK RESHAPING

CA

LO

O

SA

HA

TC

HE

E

RI

VE

R

MANUELS BRANCH - 4,319SEDIMENT

HospitalFort Myers High School

Pr in ce to n St

Carrell Rd.

Hill Ave.

D eb ris R em ov al L oc at io n

M ap

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

Memorial Lee

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

DBANK

RESHAPING

1145'

REMOVAL

1594'

1580'

TREE

CLEARING FOR

CONSTRUCTION

BANK

RESHAPING BANK RESHAPING

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF4 10

FO

R

D S

T.

C

AN

AL

R oc kf ill

R

d. Martin Luther King (Jr.) Blvd

O rti z Av e.

Ve ro ni ca

S . S ho em ak er

B lv

d. Michigan Ave.

Calo os ah atc he e R ive r

Diana Ave.

BILLYS CREEK

7,500' - U

NDER WATER VEGETATIVE DEBRIS REMOVAL

Palm Beach Blvd.

N un a Av e.

0'

SE

D

IM

EN

T

R

EM

O

VA

L

D eb ris R em ov al L oc at io n

M ap

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

STRUCTURAL REPAIR BETWEEN DIANE ST.AND

BALLARD RD. IS DETAILED IN A SEPARATE SET

OF CONSTRUCTION DRAWINGS AND SPECS.

SEE SHEET 10 OF 10.

NOTE:

06/16/2025

7/

RT

RE

VI

SE

D

AN

D

B

AN

K R

ES

H

AP

IN

G

0'

SE

D

IM

EN

T R

EM

O

VA

L

AN

D

B

AN

K R

ES

H

AP

IN

G

BA

LL

AR

D

F

AR

M C

AN

AL

300' - EROSION CONTROL - REPAIR

ARTICULATED CONCRETE BLOCK MAT (ACB MAT)

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

SHEET:

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

SHEET: OF5 10

N.T.S.SCALE:

R oc kf ill

R d.

Martin Luther King (Jr.) Blvd

Edison Ave.

O rti z Av e.

Ve ro ni ca

S . S ho em ak er

B lv d.

Canal St.

Colonial Blvd.

Hanson St.

I-7

EASTWOOD

GOLF COURSE

EA

ST

W O

O D

G O

LF

C

O U

R

SE

C

AN

AL

1905' - TREE CLEARING FOR CONSTRUCTION

SEDIMENT REMOVAL AND BANK RESHAPING

D eb ris R em ov al L oc at io n

M ap

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF6 10

NOTES:

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to Billy's Creek.

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

STREAM

DETAIL NO. 1 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

STREAM

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

D eb ris R em ov al D et ai l N o.

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al D et ai l N o.

OF7 10

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CHANNEL

DETAIL NO. 2 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to Eastwood Golf Course Canal.

NOTES:

CHANNEL

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al D et ai l N o.

OF8 10

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CANAL

DETAIL NO. 3 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to the following waterways: L-3 Canal, Ford Street Canal, Veronica S. Shoemaker Canal, Manuels Branch, Canal St. Canal, Carrell Rd. Canal, and Winkler Ave. Canal.

NOTES:

CANAL

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

VEGETATIVE AND C & D

(CONSTRUCTION &

DEMOLITION) DEBRIS

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

Er os io n

C on tr ol

R ep ai r

D et ai l

OF9 10

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

06/16/2025

7/

RT

RE

VI

SE

DErosion repair area

VARIABLE TOP WIDTH

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CHANNEL

DETAIL NO. 4 - BANK EROSION REPAIRS/MINOR RESHAPING

N.T.S.

1. Left and right looking downstream.

NOTES:

CHANNEL

EROSION REPAIR AREA

ERODED CHANNEL BANK

2. This drawing applies to minor bank reshaping applicable to all sites, as needed.

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

S tr ea m

B an k Er os io n R ep ai r

D et ai ls a nd

C on st ru ct io n N ot es

OF10 10

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

06/16/2025

7/

RT

RE

VI

SE

D

Sheet - 1
Sheet - 2
Sheet - 3
Sheet - 4
Sheet - 5
Sheet - 6
Sheet - 7
Sheet - 8
Sheet - 9
Sheet - 10

File details come from the government source that posted it. Updated .