This Contract Data Requirements List (CDRL) outlines seven reporting requirements for a Material Handling Equipment rental contract at Norfolk Naval Shipyard. The contractor must submit the following reports: a personnel roster within 15 days of award and updates within 7 days of changes; a quality management plan within 30 days of award and updates as agreed upon; an inspection and surveillance report monthly after initial submission 30 days after award; a hazardous material inventory report as required; a training plan initially during the proposal period and updates as required; and preventative maintenance and repair plans initially during the proposal period and updates as required. Reports are to be marked Distribution Statement D and submitted to the shipyard via email.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL HANDLING EQUIPMENT

CONTRACT/PR N0: TBD

CONTRACT DATA REQUIREMENTS LIST (CDRL)

TABLE OF CONTENTS

Rev B. Dated 4-5-17

ITEM SUBTITLE

A001 LIST OF PERSONNEL

A002 QUALITY MANAGEMENT PLAN

A003 INSPECTION AND SURVEILLANCE REPORT

A004 CONTRACTOR’S TRAINING

A005 HAZARDOUS MATERIAL

A006 REPAIR

A007 PREVENTIVE MAINTENANCE

CONTRACT DATE REQUIREMENTS LIST (CDRL)

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A001

2. TITLE OF DATA ITEM

CONTRACTOR’S PERSONNEL ROSTER

3. SUBTITLE

LIST OF PERSONNEL

4. AUTHORITY (Data Acquisition Doc. No)

D1-MGMT-81834A

5. CONTRACT REFERENCE

PWS PARA 4.14

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D (SEE BLK 16)

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

A

(SEE BLK 16)

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

ADDRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 8: DRAFT TO BE PROVIDED VIA FORMAL CORRESPONDENCE. APPROVAL BY

GOVERNMENT.

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLKS 10, 12 & 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A COMPLETE

LIST OF ALL PERSONNEL, QUALIFICATIONS AND SECURITY CLEARANCE FIFTEEN

DAYS AFTER CONTRACT AWARD. REVISION PROVIDED WITHIN SEVEN DAYS AS

CHANGES OCCUR.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS AVAILABLE.

POINT OF CONTACT:

NNSY CODE REPRESENTATIVE: TBD

NNSY CODE

TBD

0 1 0

15. TOTAL 0 1 0

G. PREPARED BY

LEISA WILSON

H. DATE

I. APPROVED BY

J. DATE

17. PRICE

GROUP

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A002

2. TITLE OF DATA ITEM

MANAGEMENT PLAN

3. SUBTITLE

QUALITY MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-80004A

5. CONTRACT REFERENCE

PWS PARA 4.12

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

DD

ONE/R

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

A

SUBMISSION

ASREQ

ADDRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 8: DRAFT TO BE PROVIDED VIA FORMAL CORRESPONDENCE. APPROVAL BY

GOVERNMENT.

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER

UNNPI) (13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT

NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VA.

BLK 10, 12 & 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT

AN ASSESSMENT REPORT OF THE FINDINGS AS THEY BECOME

AVAILABLE OR AS AGREED TO BETWEEN THE GOVERNMENT AND

THE CONTRACTOR.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS AVAILABLE.

POINT OF CONTACT:

NNSY CODE REPRESENTATIVES: TBD

NNSY CODE

15. TOTAL 1

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER ENVR

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A0005

2. TITLE OF DATA ITEM

CONTRACTOR’S HAZARDOUS MATERIAL

INVENTORY REPORT

3. SUBTITLE

HAZARDOUS MATERIAL

4. AUTHORITY (Data Acquisition Doc. No)

DI-ENVR-82091

5. CONTRACT REFERENCE

PWS PARA 4.36

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

DD

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

A

SUBMISSION

ASREQ

ADRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 8: DRAFT TO BE PROVIDED VIA FORMAL CORRESPONDENCE. APPROVAL BY

GOVERNMENT TO BE 10 WORKING DAYS AFTER RECEIPT.

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLK 10, 12 & 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT AN ASSESSMENT

REPORT OF THE FINDINGS AS THEY BECOME AVAILABLE OR AS AGREED TO

BETWEEN THE GOVERNMENT AND THE CONTRACTOR.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS POSTED.

POC:

NNSY CODE REPRESENTATIVE: TBD

15. TOTAL 0 1 0

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A004

2. TITLE OF DATA ITEM

SYLLABUS

3. SUBTITLE

CONTRACTOR’S TRAINING PLAN

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-82151

5. CONTRACT REFERENCE

PWS PARA 4.14

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

N/A

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

SUBMISSION

ASREQ

ADRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLK 10, 12 & 13: UPDATED TRAINING PLAN SHALL BE SUBMITTED UPON

CONTRACTOR REVISIONS AND UPON REQUEST.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS POSTED.

NNSY CODE EPRESENTATIVE: TBD

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER QCIC

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A003

2. TITLE OF DATA ITEM

QUALITY ASSESSMENT REPORT

3. SUBTITLE

QUALITY INSPECTION AND SURVEILLANCE

REPORT

4. AUTHORITY (Data Acquisition Doc. No)

DI-QCIC-81187

5. CONTRACT REFERENCE

PWS PARA 4.13

6. REQUIRING OFFICE

NNSY TBD

7. DD 250 REQ

DD

ONE/R

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

SEE BLK 16

8. APP CODE

A

SUBMISSION

MTHLY

ADDRESSEES Draft

Final

Reg Repr o

16. REMARKS

BLK 8: DRAFT TO BE PROVIDED VIA FORMAL CORRESPONDENCE. APPROVAL BY

GOVERNMENT TO BE 10 WORKING DAYS AFTER RECEIPT.

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLKS 10, 12 & 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT AN ASSESSMENT

REPORT OF THE FINDINGS AS THEY BECOME AVAILABLE OR AS AGREED TO

BETWEEN THE GOVERNMENT AND THE CONTRACTOR.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL IN A

DOWNLOADABLE MICROSOFT OFFICE ACCEPTABLE FORMAT THAT WILL BE WRITE-

PROTECTED. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT

ORGANIZATIONAL ENTITIES BY EMAIL WHEN REPORT IS POSTED.

POINT OFCONTACT:

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A006

2. TITLE OF DATA ITEM

SYLLABUS

3. SUBTITLE

REPAIR

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-82151

5. CONTRACT REFERENCE

PWS PARA 5.5

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

N/A

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

SUBMISSION

ASREQ

ADRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLK 10, 12 & 13: UPDATED TRAINING PLAN SHALL BE SUBMITTED UPON

CONTRACTOR REVISIONS AND UPON REQUEST.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS POSTED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER MGMT

D. SYSTEM/ITEM

MATERIAL HANDLING EQUIPMENT

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO

A007

2. TITLE OF DATA ITEM

SYLLABUS

3. SUBTITLE

PREVENTIVE MAINTENANCE

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-82151

5. CONTRACT REFERENCE

PWS PARA 5.3

6. REQUIRING OFFICE

NNSY CODE TBD

7. DD 250 REQ

N/A

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

(SEE BLK 16)

8. APP CODE

SUBMISSION

ASREQ

ADRESSEES Draft

Final

Reg Repro

16. REMARKS

BLK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CARRIER UNNPI)

(13July2016). OTHER REQUESTS SHALL BE REFERRED TO POC AT NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VA.

BLK 10, 12 & 13: FIRST SUBMISSION SHALL BE DURING PROPOSAL PERIOD.

UPDATED TRAINING PLAN SHALL BE SUBMITTED UPON CONTRACTOR REVISIONS

AND UPON REQUEST.

BLK 14: DATA SUBMISSION SHALL BE SUBMITTED TO ALL POCs VIA EMAIL. THE

CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENT ORGANIZATIONAL

ENTITIES BY EMAIL WHEN REPORT IS POSTED.

File details come from the government source that posted it. Updated .