CDRL A006.pdf
PDF 81 KB Posted
- Attached to
- Industrial Plant Equipment Maintenance Program
- Solicitation number
- N42158-22-R-S007-DRAFT
About this file
This Contract Data Requirements List (CDRL) outlines reporting requirements for corrective maintenance repair reports related to an industrial plant equipment maintenance program. The contractor must submit comprehensive reports within 10 calendar days of any unscheduled repairs or maintenance performed on equipment listed in an appendix. Reports must include identification of personnel, dates, asset numbers, descriptions of completed repairs, changes to procedures or preventative maintenance, lists of references and replaced parts with costs and labor hours. Distribution of the reports is restricted to the Department of Defense and contractors.
The draft request for proposal solicits bids for an industrial plant equipment maintenance program at Norfolk Naval Shipyard. Interested offerors should review all attached draft solicitation documents for requirements regarding maintenance of equipment, reporting timelines, and pricing terms. The Navy seeks a contractor to provide comprehensive upkeep of machinery to ensure operational readiness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N42158-22-R-S007-DRAFT.pdf | ||
| APPENDIX A.pdf | ||
| CDRL A008.pdf | ||
| CDRL A002.pdf | ||
| CDRL A001.pdf | ||
| CDRL A004.pdf | ||
| Exhibit 1 Past Performance Information Form.pdf | ||
| APPENDIX A.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 1 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Appendix B - QASP.pdf | ||
| CDRL A003.pdf | ||
| Exhibit 2 Past Performance Questionnaire.pdf | ||
| N4215822RS007 IPE Draft Solicitation.docx | DOCX document | |
| CDRL A007.pdf | ||
| CDRL A009.pdf | ||
| CDRL A005.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A006 |
| 2_TITLE_OF_DATA_ITEM: Corrective Maintenance Repair Report |
| 3_SUBTITLE: Repair Work Completed |
| 4_AUTHORITY_Data_Acquisit: DI-MGMT-81893 |
| 5_CONTRACT_REFERENCE: PWS 16.3. |
| 6_REQUIRING_OFFICE: |
| 7_DID_250_REQ: |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: D |
| 10_FREQUENCY: ASREQ |
| 11_AS_OF_DATE: Contract Award Date |
| 12_DATE_OF_FIRST_SUBMISSI: 10 days after event |
| 13_DATE_OF_SUBSEQUENT_SUB: N/A |
| addressee1: Norfolk Naval Shipyard |
| draft1: |
| reg1: |
| repro1: |
| addressee2: Portsmouth, VA |
| draft2: |
| reg2: |
| repro2: |
| addressee3: Russell Harris |
| draft3: |
| reg3: |
| repro3: |
| addressee4: 757-636-4908 |
| draft4: |
| reg4: |
| repro4: |
| addressee5: russell.r.harris@navy.mil |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: |
The contractor shall submit a comprehensive, detailed Corrective Maintenance Repair Report within 10 calendar days after each event for all unscheduled minor and major adjustments, repairs, urgent repairs, non-urgent repairs and repair resolution services conducted on any equipment listed in Appendix A. Unscheduled repair reports shall include all applicable information regarding tests, calibrations and/or measurements taken to verify repair and operation of the machine.
The submission of this report is acceptable in the contractor's format.
Reports shall contain a minimum of the following:
• Identification of Personnel Performing Work
• Date
• DoD Asset Number
• Dates and Time of Maintenance Action
• Description of Repairs Completed
• Changes in Operating Procedures (if any).
• Changes in Preventative Maintenance (if any) - See Data Item A003
• List of References Used
• List of Replaced Parts (Note if OEM, Upgrade or Approved Equal Replacement)
• Cost Breakdown of each Replaced Parts and Labor
• Number of Mechanical Man-Hours
• Number of Electrical/Electronic Man-Hours
• Total Man-Hours
Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests for this document shall be referred to the Program Officer listed in the contract.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: |
| H_DATE: |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 0 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: X |
| TM: |
| OTHER: |
| DSYSTEMITEM: IPE Maintenance |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it. Updated .