CDRL A005.pdf
PDF 88 KB Posted
- Attached to
- Industrial Plant Equipment Maintenance Program
- Solicitation number
- N42158-22-R-S007-DRAFT
About this file
This Contract Data Requirements List (CDRL) outlines reporting requirements for an Industrial Plant Equipment (IPE) Maintenance Program contract. The contractor must submit comprehensive Certification and Calibration reports within 30 days of scheduled preventative maintenance services or annually. Reports must identify personnel, dates, equipment details, maintenance activities, references used, man-hours, and status by major component. The Distribution Statement allows release to the Department of Defense and contractors. The related draft solicitation is for the IPE Maintenance Program at Norfolk Naval Shipyard to maintain equipment per the Performance Work Statement. Interested offerors should review all attached draft documents for upcoming requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N42158-22-R-S007-DRAFT.pdf | ||
| APPENDIX A.pdf | ||
| CDRL A008.pdf | ||
| CDRL A002.pdf | ||
| CDRL A001.pdf | ||
| CDRL A004.pdf | ||
| Exhibit 1 Past Performance Information Form.pdf | ||
| APPENDIX A.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 1 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Appendix B - QASP.pdf | ||
| CDRL A003.pdf | ||
| Exhibit 2 Past Performance Questionnaire.pdf | ||
| N4215822RS007 IPE Draft Solicitation.docx | DOCX document | |
| CDRL A007.pdf | ||
| CDRL A006.pdf | ||
| CDRL A009.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A005 |
| 2_TITLE_OF_DATA_ITEM: Certification and Calibration (C&C) Report |
| 3_SUBTITLE: N/A |
| 4_AUTHORITY_Data_Acquisit: DI-MGMT-81893 |
| 5_CONTRACT_REFERENCE: PWS Paragraph 16.2. |
| 6_REQUIRING_OFFICE: |
| 7_DID_250_REQ: |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: D |
| 10_FREQUENCY: ASREQ |
| 11_AS_OF_DATE: Contract Award Date |
| 12_DATE_OF_FIRST_SUBMISSI: 30 days after event |
| 13_DATE_OF_SUBSEQUENT_SUB: N/A |
| addressee1: Norfolk Naval Shipyard |
| draft1: |
| reg1: |
| repro1: |
| addressee2: Portsmouth, VA |
| draft2: |
| reg2: |
| repro2: |
| addressee3: Russell Harris |
| draft3: |
| reg3: |
| repro3: |
| addressee4: 757-636-4908 |
| draft4: |
| reg4: |
| repro4: |
| addressee5: russell.r.harris@navy.mil |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: |
The contractor shall submit a comprehensive, detailed Certification and Calibration report to the COR for all equipment listed in Appendix A within 30 calendar days after each PM service and yearly thereafter.
The submission of this report is acceptable in the contractor's format.
Reports shall contain a minimum of the following:
• Identification of Personnel Performing Work
• Date
• DoD Asset Number
• Dates and Time of Certification and Calibration Action
• Status of the Machine by Major Component
• Description of Certifications and Calibrations performed
• List of References Used
• Number of Mechanical Man-Hours
• Number of Electrical/Electronic Man-Hours
• Total Man-Hours
Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests for this document shall be referred to the Program Officer listed in the contract.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: |
| H_DATE: |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 0 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: X |
| TM: |
| OTHER: |
| DSYSTEMITEM: IPE Maintenance |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it. Updated .