About this file

This document contains a Contract Data Requirements List (CDRL) and details of a federal contract opportunity for Mission Command Training Program (MCTP) support. The CDRL outlines requirements for a Simulation Control Plan to be provided by the contractor on an as-needed basis to support MCTP exercises. Key details include specific sections and formatting required for the plan, use of standard icons and templates, and deadlines to submit draft and final versions. The federal contract opportunity notices a change from a previous draft, removing a software development requirement to procure solutions separately. It provides a Salient Characteristics document and seeks feedback on the revised approach by February 6, 2024. The training contract will use NAICS 611699 and PSC U013, while the software licensing contract applies NAICS 513210 and PSC DA10. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Mission Command Training Program (MCTP) Second Draft RFP, newest first.
File Type Posted
CDRL A-19.pdf PDF
CDRL A-18.pdf PDF
CDRL A-17.pdf PDF
CDRL A-2.pdf PDF
ATTACHMENT 1 SUBCONTRACTOR OR TEAMING PARTNER CONSENT LETTER.docx DOCX document
CDRL A-15.pdf PDF
CDRL A-14.pdf PDF
CDRL A-11.pdf PDF
CDRL A-9.pdf PDF
CDRL A-8.pdf PDF
CDRL A-3.pdf PDF
TRADOC Regulation 350-50-3 REVISED 12 JUL 23.pdf PDF
REVISED MCTP_Handbook_v1.1_20221020.pdf PDF
ATTACHMENT 5 Sample Exercises Cost Estimate Sheet.xls XLS spreadsheet
ATTACHMENT 2 SPECIFIC RELEVANT CONTRACTS SHEET.docx DOCX document
W91QF423RMCTP DRAFT.pdf PDF
CDRL A-5.pdf PDF
CDRL A-4.pdf PDF
MCTP PWS DRAFT with Tracked Changes 23JAN2024.docx DOCX document
ATTACHMENT 3 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
CDRL A-12.pdf PDF
CDRL A-16.pdf PDF
CDRL A-13.pdf PDF
CDRL A-7.pdf PDF
CDRL A-6.pdf PDF
CDRL A-1.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A-10

2. AUTHORITY (Data

2. TITLE OF DATA ITEM

Simulation Control Plan Acquisition Document No.) 5. CONTRACT REFERENCE

3. SUBTITLE

BLUFOR Simulation Control Plan

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST STATEMENT

10. FREQU

ENCY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

REQUIRED As required

11. AS OF DATE

As required

13. DATE OF SUBSEQUENT

b. COPIES

a. ADDRESSEE

CIO

Final

16. REMARKS

SUBMISSION Draft

Reg Repro

Prior to each exercise the Contractor shall produce a Simulation Control Plan that identifies all workstation requirements, workstation relationships, Mission Training Center technical lay down, unit training plan, unit equipment requirements, and a listing of all augmentees, with duty descriptions, by work cell per Government direction. The simulation control plan timeline may change due to exercise requirements changing during the ELC planning events. The Contractor shall:

Develop and publish a simulation control plan (SCP) for all MCTP and Non-MCTP planned and executed exercises to include MCTP internal support requirements such as simulation operator / instructor training, simulation evaluation and testing, new equipment testing and fielding, and other Government specified events requiring the establishment of a simulation and/or analysis network utilizing MCTP Government provided equipment.

Provide personnel to attend scheduled SCP planning events, site surveys, exercise working groups and other planning requirements as specified by the Government.

Be directly responsible for the management and production of the SCP as directed by the S-37 and the MCTP Chief Information Officer (CIO).

Provide personnel at site surveys to assess availability of space at each facility provided, access to power at each facility provided, and capacity of available power to support required equipment at each facility provided.

Identify a point of contact (SCP Lead Contractor) to consolidate, compile, complete, update, and publish SCPs in accordance with Government established timelines and direction.

Provide a recommended apportionment of facility space for all Government directed requirements and a list of identified shortfalls in assessed power access, assessed power capacity, and surveyed square footage necessary to support the exercise. The Government Contractor in conjunction with the Government coordinates with site and facility Government representatives to mitigate Contractor identified SCP shortfalls.

Publish an initial draft of each required SCP by site no later than 5 calendar days from the end of after the Initial Planning Event (IPE) event or as directed by the Government.

Update the draft SCP with all changes directed by the Government prior to the Final Planning Event (FPE).

Participate in the SCP Working Group (SCP WG) at date, time and location specified by the Government.

Provide a copy of the updated draft SCP in a Government approved format to facilitate the review of all changes resulting from the FPE, validate apportionment of limited equipment, and capture all additional changes resulting from the SCP WG.

Schedule and provide a desk side pre-brief of the updated draft SCP resulting from the SCP WG to the DCoS Ops, S-37, COR, and support staff prior to the SCP decision board.

OPSGRP 1 1

COR 1 1

S-3/S-37 1 1 Deputy Commander 1 1

15. TOTAL 4 4 0

18. ESTIMATED

Facilitate the SCP decision Board at a date, time and location directed by the Government.

Publish the final draft SCP with all changes directed at the SCP DB in PDF format no later than 5 calendar days after the decision board, or as directed by the Government, for delivery to the MCTP Deputy Commander for approval and signature.

Verify shipping requirements a minimum of 10 days prior to any planned shipment.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Reset

CONTRACT DATAREQUIREMENTSLIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Simulation Control Plan Format: The contractor shall provide at minimum the following documentation listed below when developing the SCP.

SIMULATION CONTROL PLAN OVERVIEW

Exercise training locations Enclosure 1 KEY MILESTONE LISTING OF EVENTS AND TIMES Enclosure 2 MISSION COMMAND STRUCTURE Tab A: Exercise Control Group (COIC) Structure Tab B: Exercise Control Work cells Tab C: Higher Command (HICOM) Tab D: Mission Command Architecture Tab E: Technical Support Organization and Functions Enclosure 3 ROOM DRAWINGS AND EQUIPMENT REQUIREMENTS Enclosure 4 EXERCISE WORK/RESPONSE CELL POSITION DESCRIPTIONS Enclosure 5 AUGMENTEE AND PLAYER/CONTROLLER TRAINING SCHEDULE Enclosure 6 SIMULATION DIAGRAMS/TECHNICAL SERVICES SPT PLAN SCP ENCL 3: Specific Format Requirements. Contractor will develop and produce the SCP using the following guidelines and formats to facilitate standardization between all MCTP operations groups, sections, and external agencies.

All draft and final SCP documentation will be converted to PDF format when submitted to the government, all documentation submitted will use cover letter format and government provided templates.

Contractor shall use Microsoft Visio, Excel, Word, and PDF to develop detailed floor plans of all locations and building used during the exercise, to include Fort Leavenworth locations.

o Visio will be used to produce site, building, floor, and room layouts.

o Excel will be used to produce site, building, floor, and room equipment lists.

o Word will be used to combine both the visio and excel data into one document.

o PDF will be used when document is published.

Contractor shall use approved icon list provided by the government CIO/S6/S-3/S-37 section, icons will be used to identify required equipment and furnishings used during an exercise.

SCP icons and spreadsheets must be legible and detailed to meet MCTP exercise requirements.

All pages of the SCP will have standardized header and page numbers to facilitate updates and changes.

ENCL 3: Room Drawings and Equipment requirements section of the SCP will adhere to following format.

o Index Header page o Glossary of Symbols section o Overall Equipment roll-up o Main Site location overview with area map o Main Site locations with unit/training audience map o Main Site detailed list of buildings/rooms supported o Main Site equipment roll-up o Main Site Building/Room diagrams and individual roll-up o Secondary Site location overview with area map o Secondary Site locations with unit/training audience map o Secondary Site list of buildings/rooms supported o Secondary Site equipment roll-up o Secondary Site Building/Room diagrams and individual roll-up

SCP Changes/Updates: Contractor shall provide additional coversheet with all listed changes to initial SCP listing pages that were updated during the SCP development process. This will facilitate users reviewing updated versions.

DD FORM 1423-1, FEB 2001 Reset Page of Page

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort, but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001