CDRL 3006.pdf
PDF 85 KB Posted
- Solicitation number
- ISO212-24
About this file
This document is a Contract Data Requirements List (CDRL) that lists the deliverables required for a federal contract opportunity. The CDRL includes 23 unique deliverables such as a Contractor's Personnel Roster, Activity Hazard Analysis Report, Accident Prevention Plan, Approved Build Drawings, Quality Control Plan, Production Report, Warranty Management Plan, and As-Built Drawings. Each deliverable has a specific DID (Data Item Description) number, applicable Statement of Work paragraph, and required delivery schedule, ranging from within 10 days of the Post Award Kickoff (PAK) to 5 days prior to Beneficial Occupancy Date (BOD).
The related federal contract opportunity is for a Design-Build project to provide a new Cooperative Engagement Capability (CEC) Test Range and modernize the control room at Building 3006 at Naval Support Activity Crane in Indiana. The scope includes testing verification of CEC systems, both shipboard and airborne, as well as an expeditionary CEC system. The contract will be awarded by the Department of Justice Bureau of Prisons Correctional Facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD03 ISO212-24.pdf | ||
| B3006 RFI 42-48 with responses_ (003).docx | DOCX document | |
| AMD02 ISO212-24.pdf | ||
| ISO212-24 Sign In Sheet.pdf | ||
| B3006 RFI 1-41 with responses.docx | DOCX document | |
| AMD01 ISO212-24 SD.pdf | ||
| Acronym Table 3006.pdf | ||
| wage determination.txt | TXT text file | |
| APPLICABLE DOCUMENTS 3006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL DID Number DID Title Applicable
SOW
Paragraph
Deliverable Schedule
A001 DI-MGMT-
81834
Contractor’s Personnel Roster
6.14 NLT 10 days
after PAK
A002 DI-SAFT-81841 Activity Hazard Analysis Report
4.4.1 NLT 10 working
days after the
PAK
A003 DI-MISC-
80508B
Accident Prevention Plan 4.4.2 NLT 10 working days after the
PAK
A004 DI-MISC-
80508B
Severe Hazard Exposure 4.5 As Required
A005 DI-SAFT-82188 Accident/Incident Report 6.5 As Required
A006 DI-SAFT-82188 Damage Reporting 6.7 As Required
A007 DI-MISC-
80508B
Approved Build Drawings 4.0 At Milestone
Prior to start of construction
A008 DI-MISC-
80508B
Quality Control Plan 4.3.1 Post Award Kickoff
A009 DI-MISC-
80508B
Production Report 4.1 Daily
A010 DI-MISC-
80508B
Waste Management Plan 4.5 NLT 10 working days after the
PAK
A011 DI-MISC-
80508B
Hazardous Material Clean-Up 4.5 As Required
A012 DI-MISC-
80508B
Waste Management Report 4.5 5 days prior to
BOD
A013 DI-MISC-
80508B
Warranty Management Plan 4.8 10 days prior to pre-warranty meeting
A014 DI-MGMT-
81994
Bill of Materials 4.1 As Required
A015 DI-MISC-
80508B
Asbestos Containing Building Material Report
4.6.1 NLT 5 working
days prior to
BOD
A016 DI-MISC-
81489B
As-Built Drawings 4.7 5 days prior to
BOD
A017 ER 415-1-10 Submittal Register 4.1 As Required
A018 DI-MISC-
80508B
Schedule 4.1 Post Award Kickoff
A019 DI-SAFT-82112 Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
4.6.8 As Required
A020 DI-MISC-
80508B
Standard Lift Plan 4.4.4 As Required
A021 DI-SAFT-82313 ENVIRONMENTAL, SAFETY,
AND OCCUPATIONAL
HEALTH (ESOH) PLAN
4.6.1 Within 10 days
after the PAK
A022 DI-MISC-
80508B
Maintenance Manuals 4.3 5 working days prior to BOD
A023 DI-ADMN-
81250C
MEETING MINUTES 4.1 Weekly