CDRL 004 - Production Roadmap DI-IPSC-82297.pdf

PDF 135 KB Posted

Attached to
MGA Thomas Hall Security
Solicitation number
FA857926Q0040
Issued by

About this file

This document is a non-functional PDF file containing only an Adobe Reader error message. The file does not contain any contract opportunity information, solicitation details, statements of work, pricing terms, agency information, or other substantive federal contracting content. The document merely displays a loading message indicating that the PDF viewer cannot properly render the file contents and directs users to upgrade their Adobe Reader software. No contract-related details can be extracted from this file.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" Show Attachment Bar

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER: TBD
exhibit: A
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.": IPSC
System: MGSU Security System Install
ContractNum: TBD
Contractor: TBD
1. DATA ITEM NUMBER: 004
titleDataItem: Product Roadmap
subtitle:
4. AUTHORITY (Data Acquisition Document Number): DI-IPSC-82297
contractRef: 4.1
reqOffice: 402nd SWEG
7. DD 250 REQUIREMENT: DD
8. APPROVAL CODE : N/A
9. DISTRIBUTION STATEMENT REQUIRED: D
freq: ONE/R
asOfDate: N/A
dateFirstSub: 7 Days ARO
dateSubseqSub: ASREQ
16. REMARKS: Block C: IPSC Information Processing Standards (for Computers)

Block 4: Use DI-IPSC-82297 as reference.

The following paragraph numbers will not be required for submission: 3.2, 3.3, 3.5, 3.6, 3.7.3, 3.8 The following information will be required: detailing the sequence, timeline, and key milestones required to deliver the final product. The road map must explicitly identify all long-lead material procurements, major assembly phases, testing periods, and final delivery dates. The Contractor shall update this road map as required to accurately reflect current production status, supply chain impacts, and mitigation plans for any identified schedule risks.

Block 7: Contractor format is acceptable however, Government will approve contractor's formate prior to subsequent submissions.

DD = None at Source. Final Inspection at Destination.

Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests for this document must be referred to 402nd SWEG.

(1) This statement can apply to classified, CUI, and unclassified technical information.

(2) Distribution is authorized only to military and civilian employees of the DoD or U.S. DoD contractors or grantees who enter into a contract or award with the DoD to perform a specific job, to supply labor and materials, or for the sale of products and services if such distribution is in furtherance of that contractual purpose.

Block 10: Once with revisions.

Block 12: Initial Due No Later Than (NLT) Seven (7) Calendar Days After Receipt of Order (ARO)

Block 13: Updates As Required or at the request of the PM, PCO or COR. At request, the contractor shall have NLT 7 calendar days from request to produce subsequent/revised reports.

Block 14:

Contracting Officer Representative (COR): Assigned ARO Procurement Contracting Officer (PCO) Assigned ARO:

402nd SWEG Program Manager (PM): Assigned ARO:

Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: SWEG PM
14. DISTRIBUTION - a. ADDRESSEE, new line: Contracting Officer
14. DISTRIBUTION - a. ADDRESSEE, new line: COR
15.TOTAL - Total draft copies is automatically calculated.:
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 3
15.TOTAL - Total final reproducible copies is automatically calculated.:
priceGrp: NSP
estTotalPrice: 0.00
remarks:
preparedBy: Craig Hollis
J. SIGNATURE: H. SIGNED ON 20260921
J. SIGNATURE: J. SIGNED ON 20260921
J. SIGNATURE:
approvedBy: Garry S. Navas
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .