CDDrawingsCombined.pdf

PDF 42 MB Posted

Attached to
Security Assessment survey Federal contract opportunity
Solicitation number
36C26024Q0296
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This solicitation seeks quotes for a security assessment survey for the Roseburg VA HealthCare System in Oregon. Quotes are requested for conducting the security assessment with the period of performance to have the assessment completed by Summer 2024. The solicitation is set aside for verified service-disabled veteran-owned small businesses. Quotes are due by January 16, 2024 and must include pricing, details on past performance conducting similar assessments within the last five years, and acceptance of the solicitation's terms and conditions. Award will be made based on a comparative evaluation of quotes considering price, technical acceptability, and performance history most advantageous to the government.

View the file

Other files for this federal contract opportunity

Other files attached to Security Assessment survey, newest first.
File Type Posted
PRSDM January 2024.pdf PDF
SOW 36C26024Q0296.pdf PDF
RoseburgVAMC 653 16 100 Final Drawings.pdf PDF
RFQ 36C26024Q0296.pdf PDF
VA_ROSEBURG_SPACEBOOK_FINAL SET_2021.pdf PDF
CS 36C26024Q0296.pdf PDF
VA MEDICAL CENTER CAMPUS MAP WITH TOPO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TV

ROSEBURG VA MEDICAL CENTER - ROSEBURG, OR

PROJECT NO. 653-20-107

EHRM INFRASTRUCTURE UPGRADES

LOCATION PLAN

NOT TO SCALE

VICINITY PLAN

NOT TO SCALE

ROSEBURG VA MEDICAL CENTER

BUILDINGS WITHIN

SCOPE OF THIS PROJECT

COVER,

LOCATION & VICINITY PLANS

G-001

MH

EC

TRUE

NORTH

TRUE

NORTH

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

N/A

913 NW GARDEN VALLEY BLVD

ROSEBURG, OR 97471

ROSEBURG VA MEDICAL CENTER -

ROSEBURG, OR

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text W

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

COMMITTAL SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T15

AutoCAD SHX Text T19

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T20

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T8

AutoCAD SHX Text T7

AutoCAD SHX Text T6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Roosevelt Loop

AutoCAD SHX Text Way Loop

AutoCAD SHX Text S Umpqua Dr.

AutoCAD SHX Text Veterans Way

AutoCAD SHX Text Garden Lane

AutoCAD SHX Text Lincoln Dr.

AutoCAD SHX Text Veterans

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Garden Vally Blvd.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

PROJECT SUMMARY &

DRAWINGS INDEX

G-002

MH

EC

PROJECT SUMMARY

BUILDINGS WITHIN SCOPE:

BUILDING 1

BUILDING 2

BUILDING 3

BUILDING 16

BUILDING 17

BUILDING 81

BUILDING 85

BUILDING 86

BUILDING 87

BUILDING 88

ICRA CLASS TYPE:

TBD BASED ON LOCATION

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 G-001

COVER, LOCATION & VICINITY PLANS

2 G-002 PROJECT SUMMARY & DRAWINGS INDEX

3 G-003

SYMBOLS, ABBREVIATIONS & GENERAL NOTES

ARCHITECTURAL

4 AS101 ICRA BARRIER DETAILS

5 A-101a BUILDING 1AC – FIRST FLOOR

6 A-101b BUILDING 1AC – FIRST FLOOR

7 A-101c BUILDING 1AC - ROOF PLAN

8 A-102a BUILDING 1 – DATA CENTER DEMO FLOOR PLAN & FLOOR PLAN

9 A-102b BUILDING 1 – DATA CENTER DEMO R.C.P & R.C.P

10 A-102c BUILDING 1 – FIRST FLOOR

11 A-102d BUILDING 1 – SECOND FLOOR

12 A-102e BUILDING 1 – SECOND FLOOR

13 A-102f BUILDING 1 – THIRD FLOOR

A-102g

BUILDING 1 – FOURTH & FIFTH FLOOR

15 A-103a BUILDING 2 – SECOND FLOOR

16 A-103b BUILDING 2 - ROOF PLAN

17 A-104 BUILDING 3 – SECOND FLOOR

18 A-105 BUILDING 16 – SECOND FLOOR

19 A-106 BUILDING 17 – FIRST FLOOR

20 A-107a BUILDING 81 – FIRST FLOOR

21 A-107b BUILDING 81 - ROOF PLAN

22 A-108 BUILDING 85 – FIRST FLOOR

23 A-109 BUILDING 86 – FIRST FLOOR

24 A-110a BUILDING 87 – FIRST FLOOR

25 A-110b BUILDING 87 - ROOF PLAN

26 A-111 BUILDING 88 – FIRST FLOOR

27 AI400 INTERIOR ELEVATIONS & TR PLANVIEW

28 AE500 DETAILS

29 AE600

SCHEDULES, DOOR/WALL TYPES & DOOR/WALL DETAILS

MECHANICAL

30 M-001 MECHANICAL: SCHEDULES AND SYMBOLS

31 M-101 BUILDING 1AC – FIRST FLOOR E156 & B101A & D101A PLAN

32 M-102a BUILDING 1 – FIRST FLOOR DEMO & NEW WORK DATA CENTER PLAN

33 M-102b BUILDING 1 – FIRST FLOOR DEMO & NEW WORK C104A

34 M-102c BUILDING 1 – SECOND FLOOR C205 PLAN

35 M-102d BUILDING 1 – THIRD FLOOR C300 PLAN

36 M-102e BUILDING 1 – FOURTH FLOOR C400 PLAN

37 M-103

BUILDING 2 – SECOND FLOOR A211, A212, B209D & C202 PLAN

38 M-104 BUILDING 3 – SECOND FLOOR B201 PLAN

39 M-105 BUILDING 16 FIRST & SECOND FLOOR E103 & A218 PLAN

40 M-106 BUILDING 17 FIRST FLOOR A114 PLAN

41 M-107 BUILDING 81 FIRST FLOOR E109A PLAN

42 M-108 BUILDING 85 FIRST FLOOR D103 PLAN

43 M-109 BUILDING 86 FIRST FLOOR E103 PLAN

44 M-110 BUILDING 87 FIRST FLOOR E124 PLAN

45 M-111 BUILDING 88 FIRST FLOOR A117 PLAN

46 M-501

MECHANICAL EQUIPMENT SCHEDULES

47 M-502 MECHANICAL DETAILS

48 M-601 SCHEDULES

ELECTRICAL

49 EG001

ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS

50 EG002 LUMINAIRE SCHEDULE

51 ES101 ELECTRICAL CAMPUS SITE PLAN

52 EP100a BUILDING 1 EAST - CRAWL SPACE FLOOR PLAN

53 EP100b BUILDING 1 WEST - CRAWL SPACE FLOOR PLAN

54 EP101 BUILDING 1 & 1AC – FIRST FLOOR PLAN

55 EP102 BUILDING 1 – SECOND FLOOR PLAN

56 EP103 BUILDING 1 – THIRD FLOOR PLAN

57 EP104 BUILDING 1 – FOURTH FLOOR PLAN

58 EP105 BUILDING 1 – FIFTH FLOOR PLAN

59 EP106 BUILDING 2 – FIRST FLOOR PLAN

PAGE # SHEET # SHEET NAME

60 EP107 BUILDING 2 – SECOND FLOOR PLAN

61 EP108 BUILDING 2 – THIRD FLOOR PLAN

62 EP109 BUILDING 2 – ATTIC FLOOR PLAN

63 EP110 BUILDING 3 – FLOOR POWER PLANS

64 EP111 BUILDING 16 – BASEMENT AND FIRST FLOOR PLANS

65 EP112 BUILDING 16 – SECOND FLOOR POWER PLANS

66 EP113 BUILDING 17 – FIRST FLOOR PLAN

67 EP114 BUILDING 81 – FIRST FLOOR PLAN

68 EP117 BUILDING 85 – FIRST FLOOR PLANS

69 EP118 BUILDING 86 – FIRST FLOOR PLAN

70 EP119 BUILDING 87 – FIRST FLOOR PLAN

71 EP401 BUILDING 1 – FIRST FLOOR ENLARGED POWER PLANS

72 EP402 BUILDING 1AC – FIRST FLOOR ENLARGED POWER PLANS

73 EP403 BUIDLING 1 – SECOND FLOOR ENLARGED POWER PLAN

74 EP404 BUILDING 1 – THIRD FLOOR ENLARGED POWER PLANS

75 EP405 BUIDLING 1 – FOURTH FLOOR ENBLARGED POWER PLAN

76 EP406 BUILDING 1 – FIFTH FLOOR ENLARGED POWER PLAN

77 EP407 BUILDING 2 – SECOND FLOOR ENLARGED POWER PLANS

78 EP408 BUILDING 3 – SECOND FLOOR ENLARGED POWER PLAN

79 EP409 BUILDING 16 – FIRST FLOOR ENLARGED POWER PLANS

80 EP410 BUILDING 16 – SECOND FLOOR ENLARGED POWER PLANS

81 EP411 BUILDING 17 – FIRST FLOOR ENLARGED POWER PLANS

82 EP412 BUILDING 81 – FIRST FLOOR ENLARGED POWER PLAN

83 EP413 BUILDING 87 - FIRST FLOOR ENLARGED POWER PLANS

84 EL401 BUILDING 1 – FIRST FLOOR ENLARGED LIGHTING PLANS

85 EL402 BUILDING 1AC – FIRST FLOOR ENLARGED LIGHTING PLANS

86 EL403 BUILDING 1 – SECOND FLOOR ENLARGED LIGHTING PLANS

87 EL404 BUILDING 1 – THIRD FLOOR ENLARGED LIGHTING PLANS

88 EL405 BUILDING 1 – FOURTH FLOOR ENLARGED LIGHTING PLANS

89 EL406 BUILDING 2 – SECOND FLOOR ENLARGED LIGHTING PLANS

90 EL407 BUILDING 3 – SECOND FLOOR ENLARGED LIGHTING PLANS

91 EL408 BUILDING 16 – SECOND FLOOR ENLARGED LIGHTING PLANS

92 EL409 BUILDING 17 – FIRST FLOOR ENLARGED LIGHTING PLANS

93 EL410 BUILDING 81 – FIRST FLOOR ENLARGED LIGHTING PLANS

94 EL411 BUILDING 85 – FIRST FLOOR ENLARGED LIGHTING PLAN

95 EL412 BUILDING 86 – FIRST FLOOR ENLARGED LIGHTING PLAN

96 EL413 BUILDING 87 – FIRST FLOOR ENLARGED LIGHTING PLANS

97 EP501 ELECTRICAL DETAILS

98 EP502 ELECTRICAL DETAILS

99 EP601 BUILDING 1 – ONE-LINE DIAGRAM

100 EP602

BUILDING 1AC, 64 & 65 – ONE-LINE DIAGRAMS

101 EP603 BUILDING 81 – ONE-LINE DIAGRAM

102 EP604 BUILDING 16 – ONE-LINE DIAGRAM

103 EP605 BUILDING 17 & 58 – ONE-LINE DIAGRAMS

104 EP606

BLDG 3, 14, 15, 54 – ONE-LINE DIAGRAMS

105 EP607 BUILDING 2 & 61 – ONE-LINE DIAGRAMS

106 EP700 ELECTRICAL DEMAND CALCULATIONS

107 EP701 ELECTRICAL PANEL SCHEDULES

108 EP702 ELECTRICAL PANEL SCHEDULES

109 EP703 ELECTRICAL PANEL SCHEDULES

110 EP704 ELECTRICAL PANEL SCHEDULES

111 EP705 ELECTRICAL PANEL SCHEDULES

112 EP706 DEMAND LOAD CALCULATIONS

113 EP707 DEMAND LOAD CALCULATIONS

TELECOMMUNICATIONS

114 TN001

DRAWING INDEX, LEGENDS AND GENERAL NOTES

115 TN100 OVERALL SITE PLAN

116 TN201a BUILDING 1 – NEW FIRST FLOOR PLAN – AREA 1

117 TN201b BUILDING 1 – NEW FIRST FLOOR PLAN – AREA 2

118 TN201c BUILDING 1AC – NEW FIRST FLOOR PLAN – AREA 1

119 TN201d BUILDING 1AC – NEW FIRST FLOOR PLAN – AREA 2

120 TN202a BUILDING 1 – NEW SECOND FLOOR PLAN – AREA 1

121 TN202b BUILDING 1 – NEW SECOND FLOOR PLAN – AREA 2

122 TN202c BUILDING 1AC – NEW SECOND FLOOR PLAN

123 TN203 BUILDING 1 – NEW THIRD FLOOR PLAN

124 TN204 BUILDING 1 – NEW FOURTH FLOOR PLAN

PAGE # SHEET # SHEET NAME

125 TN205 BUILDING 1 – NEW FIFTH FLOOR PLAN

126 TN206 BUILDING 2 – NEW FIRST FLOOR PLAN

127 TN207 BUILDING 2 – NEW SECOND FLOOR PLAN

128 TN208 BUILDING 2 – NEW THIRD FLOOR PLAN

129 TN209 BUILDING 3 – NEW FLOOR PLANS

130 TN210 BUILDING 16 – FIRST FLOOR PLAN

131 TN211 BUILDING 16 – NEW SECOND FLOOR PLAN

132 TN212 BUILDING 17 – NEW FIRST FLOOR PLAN

133 TN213 BUILDING 81 – NEW FIRST FLOOR PLAN

134 TN214 BUILDING 85 – NEW FIRST FLOOR PLAN

135 TN215 BUILDING 86 – NEW FIRST FLOOR PLAN

136 TN216 BUILDING 87 – NEW FIRST FLOOR PLAN

137 TN217 BUILDING 88 – NEW FIRST FLOOR PLAN

138 TN301 BUILDING 1 – FIRST FLOOR – ENLARGED PLANS

139 TN302 BUILDING 1AC – FIRST FLOOR – ENLARGED PLANS

140 TN303 BUILDING 1 – SECOND FLOOR – ENLARGED PLANS

141 TN304 BUILDING 1 – THIRD FLOOR – ENLARGED PLANS

142 TN305 BUILDING 1 – FOURTH FLOOR – ENLARGED PLANS

143 TN306 BUILDING 1 – FIFTH FLOOR – ENLARGED PLANS

144 TN307 BUILDING 2 – SECOND FLOOR – ENLARGED PLANS

145 TN308 BUILDING 3 – SECOND FLOOR – ENLARGED PLANS

146 TN309 BUILDING 16 – ENLARGED PLANS

147 TN310 BUILDING 17 – FIRST FLOOR – ENLARGED PLANS

148 TN311 BUILDING 81 – FIRST FLOOR – ENLARGED PLANS

149 TN312 BUILDING 85 – FIRST FLOOR – ENLARGED PLANS

150 TN313 BUILDING 86 – FIRST FLOOR – ENLARGED PLANS

151 TN314 BUILDING 87 – FIRST FLOOR – ENLARGED PLANS

152 TN315 BUILDING 88 – FIRST FLOOR – ENLARGED PLANS

153 TN401 BUILDING 1 – ELEVATIONS – TR C104A

154 TN402 BUILDING 1 – ELEVATIONS – TR D101A

155 TN403 BUILDING 2 – ELEVATIONS – TR A212

156 TN404 BUILDING 2 – ELEVATIONS – TRB209D

157 TN405 BUILDING 3 – ELEVATIONS – TR B201

158 TN406 BUILDING 16 – ELEVATIONS – TR A218

159 TN407 BUILDING 81 - ELEVATIONS - TR E109

160 TN501 DETAILS

161 TN502 DETAILS

162 TN601 FIBER ONE-LINE DIAGRAM

CIVIL

163 CS101 EXISTING SITE COMMUNICATIONS SCHEMATIC PLAN

164 CS102 EXISTING SITE COMMUNICATIONS SCHEMATIC PLAN

165 CS103 EXISTING SITE COMMUNICATIONS SCHEMATIC PLAN

166 CS104 EXISTING SITE COMMUNICATIONS SCHEMATIC PLAN

167 C-501 TRENCHING AND RESTORATION DETAILS

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, SUITE 301

SEATTLE, WA 98104

PHONE: (360) 223-8994

MECHANICAL

SPEES DESIGN BUILD

625 1ST AVE, SUITE 301

SEATTLE, WA 98104

PHONE: (360) 223-8994

ELECTRICAL & ICT

SÄZÄN GROUP

600 STEWART ST, SUITE 1400

SEATTLE, WA 98101

PHONE: (206) 267-1700

CIVIL

REID MIDDLETON INC.

728 134TH ST SW, SUITE 200

EVERETT, WA 98204

PHONE: (425) 741-3800

DESIGN TEAM

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

N/A

SYMBOLS ABBREVIATIONS

SYMBOLS, ABBREVIATIONS &

GENERAL NOTES

G-003

MH

EC

KEY NOTE

EXIST DOOR TO REMAIN

DOOR TO INSTALL

EXIST DOOR TO DEMO

HIDDEN ABOVE OR BELOW

TO DEMOLISH

AB

ABV

ACT

ADJ

A/E

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BRKT

BLDG

BLK

BLKG

BLW

BM

BRNG

BOC

BOS

BO

BTM

BRC

CAB

CEIL

CTR

CLR

CO

CMU

COL

CONC

COMM

COMP

CONN

CONST

CONT

COR

CJ

CS

COORD

CORR

DEMO

DIA

DC

DIM

DN

DR

DBL

DTL

DWG

E

EA

ELEV

ELEC

EOC

EOP

EQ

EQUIP

ES

EXIST

EXP

EJ

ETS

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLOUR

FNDN

FOC

FOF

FOS

FP

FRM

FT

FTG

FUR

FURN

GA

GALV

GC

GMU

GLB

GB/GWB

GFGI

GOVT

GYP

HAZMAT

HDWE

HDR

HT

HM

HORZ

HPDL

HR

ICRA

ICT

INCL

INFO

INST

ID

INSUL

INT

JT

KV

LAM

LAV

LT

MAT

MAX

MECH

MFR

MIN

MISC

MTL

MOD

MTD

N/A

NOM

N

NTS

NO.

O.C.

OFCI

OFOI

OPNG

OPP

OVHD

P

PR

PNL

PTN(S)

PVMT

P.C.

PRFB

PT

PL

PLYWD

PLAM

PS

QTY

RAD

RB

R.C.P

REF

REINF

REQ

REQ'D

REQS

RESIL

REV

RM

RO

S

SCHED

SECT

SF

SHG

SHT(G)

SIM

SM

SPEC

SQ

SS

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

THK

THRESH

TOC

TOS

TPH

T&G

TR

TRANS

TS

TYP

UON

VA

VAR

VB

VERT

VIF

W

WT

W/

W/O

WD

WD SC

WDW

WP

WH

WR

WT

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ABOVE

ACOUSTICAL CEILING TILE

ADJACENT

ARCHITECT/ENGINEER

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BRACKET

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BEARING

BOTTOM OF CURB

BOTTOM OF SLAB

BOTTOM OF

BOTTOM

BRACE, BRACING

CABINET

CEILING

CENTER

CLEAR

CONTRACTING OFFICER

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

COMMUNICATION(S)

COMPOSITION

CONNECTION

CONSTRUCTION

CONTINUOUS

CONTRACTING OFFICER REP.

CONTROL JOINT

CONCRETE SEALER

COORDINATE

CORRIDOR

DEMOLISH(ION)

DIAMETER

DIRECT CURRENT

DIMENSION

DOWN

DOOR

DOUBLE

DETAIL

DRAWING(S)

EAST

EACH

ELEVATION

ELECTRIC(AL)

END OF CURB

EDGE OF PAVEMENT

EQUAL

EQUIPMENT

EACH SIDE

EXISTING

EXPANSION

EXPANSION JOINT

EXPOSED TO STRUCTURE

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLOURESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FRAME

FOOT, FEET

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL CONTRACTOR

GLASS MASONRY UNIT

GLUE LAMINATED BEAM

GYPSUM (WALL) BOARD

GOVT FURN. GOVT INSTALLED

GOVERNMENT

GYPSUM

HAZARDOUS MATERIAL

HARDWARE

HEADER

HEIGHT

HOLLOW METAL

HORIZONTAL

HIGH-PRESSURE DECORATIVE LAM

HOUR

INFECTIOUS CONTROL RISK

ASSESSMENT

INFO & COMM TECHNOLOGY

INCLUDE(D,ING)

INFORMATION

INSTALL

INSIDE DIAMETER OR DIMENSION

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LIGHT

MATERIAL(S)

MAXIMUM

MECHANIC(AL)

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

METAL

MODIFIED

MOUNTED

NOT APPLICABLE

NOMINAL

NORTH

NOT TO SCALE

NUMBER

ON CENTER(S)

OWNER FURN. CONTRACTOR INST.

OWNER FURN. OWNER INST.

OPENING

OPPOSITE

OVERHEAD

PAINT

PAIR

PANEL

PARTITION(S)

PAVEMENT

PRECAST CONCRETE

PREFABRICATED

PRESSURE TREATED

PLATE

PLYWOOD

PLASTIC LAMINATE

PLASTIC

QUANTITY

RADIUS

RUBBER BASE

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REQUIRE

REQUIRED

REQUIREMENTS

RESILIENT

REVERSE

ROOM

ROUGH OPENING

SOUTH

SCHEDULE

SECTION

SQUARE FEET

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SPECIFICATION

SQUARE

STAINLESS STEEL

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

THICK(NESS)

THRESHOLD

TOP OF CURB

TOP OF SIDEWALK/PAD

TOILET PAPER HOLDER

TONGUE AND GROOVE

TELECOMMUNICATION ROOM

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

US DEPT. OF VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VERTICAL

VERIFY IN FIELD

WEST

WEIGHT

WITH

WITHOUT

WOOD

WOOD SOLID CORE

WINDOW

WATERPROOF(ING)

WATER HEATER

WATER RESISTANT

WOOD TRIM

INTERIOR ELEVATION FLAG

WALL SECTION FLAG

CALLOUT FLAG

TRUE NORTH ARROW

WALL TYPE TAG

DOOR TAG

ROOM TAG

EXIST WALL TO REMAIN

EXIST WALL TO DEMOLISH

WALL TO CONSTRUCT

PROJECT NORTH ARROW (TRUE

NORTH ARROW DASHED)

A-512

PROJECT

NORTH

TO CONSTRUCT

2'-0" X 4'-0" LIGHT TO DEMOLISH

2'-0" x 2'-0" ACT TO DEMOLISH

2'-0" x 4'-0" ACT TO DEMOLISH

TRUE

NORTH

2'-0" X 2'-0" LIGHT TO DEMOLISH

1'-0" X 8'-0" LIGHTS TO INSTALL

1'-0" X 4'-0" LIGHTS TO INSTALL

A-201 1

2'-0" X 2'-0" ACT TO CONSTRUCT

A-101

GENERAL NOTES

ARCHITECTURAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS AND

SPECIFICATION 01 00 00 - GEN REQS & 01 35 26 - SAFETY REQS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWING PLANS IN THE CASE OF ANY CONFLICTING INFORMATION. NOTIFY AND

VERIFY WITH THE VA COR OF ANY CONFLICTS BEFORE PROCEEDING.

3. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL ENSURE ALL WORK IS DONE IN CONFORMANCE WITH ALL

APPLICABLE CODES, ORDINANCES AND REGULATIONS. RELEVANT CODES INCLUDE, BUT ARE NOT LIMITED TO THE

FOLLOWING:

A. LATEST EDITION, INTERNATIONAL BUILDING CODE

B. LATEST EDITION, INTERNATIONAL MECHANICAL CODE

C. LATEST EDITION, INTERNATIONAL PLUMBING CODE

D. LATEST EDITION, NFPA 101

E. LATEST EDITION, NFPA 99

F. ALL VA DESIGN GUIDES, MANUALS AND STANDARDS INCLUDING:

- LATEST EDITION, TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL

- LATEST EDITION, (REVISED MAY 2019) HVAC DESIGN MANUAL

- LATEST EDITION, 2013 VA HANDBOOK 0730/4

- LATEST EDITION, OFFICE OF INFORMATION & TECHNOLOGY

- LATEST EDITION, OEHRM REQUIREMENTS SPECIFICATION VERSION 1.0

- LATEST EDITION, INFRASTRUCTURE STANDARDS FOR TELECOMMUNICATIONS SPACES VERSION 2.2

4. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS, LOCATIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID.

5. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL FIELD VERIFY DIMENSIONS, AND FAMILIARIZE THEMSELVES WITH

PROJECT REQUIREMENTS PRIOR TO COMMENCING WORK. CONTRACTOR SHALL REPORT ANY DISCREPANCIES DIRECTLY

TO THE VA COR. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR

FAILURE TO VISIT THE SITE.

6. THE CONTRACTOR SHALL CHECK AND FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE BEGINNING

WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE DRAWINGS AND SPECIFICATIONS SHALL BE

BROUGHT IMMEDIATELY TO THE ATTENTION OF THE COR.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH WITH THE COR, BEFORE PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH ALL INSTALLERS TO ENSURE

COMPLIANCE TO THE DRAWINGS AND SPECIFICATIONS.

9. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL OF

WORKMANSHIP.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH

PROJECT WORK. THE PLAN WILL BE REVIEWED AND APPROVED BY THE COR PRIOR TO BEGINNING WORK.

11. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD

TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS INDICATED. DO NOT SCALE DRAWINGS. ALL

DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS. ALL

VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION UNLESS OTHERWISE NOTED.

12. ANY WOOD USED IN PROJECT MUST BE FIRE-RESISTANT TREATED.

13. ANY DAMAGES THAT OCCUR TO VA PROPERTY DURING CONSTRUCTION SHALL BE RETURNED TO THEIR ORIGINAL

CONDITION AT NO COST TO THE VA.

14. SCHEDULE SYSTEM AND FUNCTIONAL SHUT DOWNS WITH COR TWO WEEKS PRIOR TO ANY SHUTDOWN.

15. ANY EXIST CARPET AND ADHESIVE IN ALL TELECOMMUNICATION ROOMS SHALL BE REMOVED, INCLUDING ANY

ASBESTOS ABATEMENT MATERIALS AS NOTED IN DRAWINGS, TO EXPOSE CONCRETE FLOORING UNDERNEATH. REFER

TO SPECIFICATION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT AND THE HAZARDOUS MATERIAL SURVEY REPORT.

16. FURNISH ALL PRODUCTS TO COMPLY WITH VA STANDARDS, UON.

17. THE CONTRACTOR IS RESPONSIBLE FOR MOVING OFFICE FURNITURE AS NECESSARY TO ACCESS DATA WALL OUTLETS

IN ROOMS.

STORAGE AREA NOTES

1. CONTRACTOR SHALL COORDINATE AND VERIFY STORAGE AREA WITH THE COR.

2. COORDINATE CONTRACTOR STORAGE LOCATION AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES, BUT IS NOT

LIMITED TO, AREAS TO BE USED FOR MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES AND TRANSPORTATION

ROUTES TO THE PROJECT AREA. VERIFY STORAGE PLAN WITH COR BEFORE BRINGING OR DELIVERING MATERIALS, TOOLS OR EQUIPMENT TO THE MEDICAL CENTER.

3. ENSURE COMPLIANCE WITH ALL NECESSARY CONTRACT DOCUMENTS REGARDING CONTRACTOR STORAGE AREA.

4. DO NOT STORE MATERIALS, TOOLS, EQUIPMENT OR VEHICLES IN ANY LOCATION ON MEDICAL CENTER PROPERTY

UNLESS GIVEN PRIOR VA APPROVAL BY THE COR.

5. A LIMITED AMOUNT OF MATERIALS AND TOOLS MAY BE STORED IN THE CONSTRUCTION AREA WITHIN THE APPLICABLE

BUILDING AS LONG AS SAFETY AND CLEANLINESS ARE NOT COMPROMISED. COR HAS AUTHORITY TO REQUEST

RELOCATION OF ANY AND ALL STORED MATERIALS, TOOLS AND EQUIPMENT TO A DIFFERENT LOCATION.

EXIST LIGHT TO DEMOLISH

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

N/A

ROOM NAME

35 SQ FT

HAZARDOUS MATERIAL ABATEMENT NOTES

1. THIS PROJECT INCLUDES REMOVAL AND DISPOSAL OF HAZARDOUS BUILDING MATERIALS [ASBESTOS-CONTAINING MATERIALS (ACM), LEAD-CONTAINING

MATERIALS (LCM), MERCURY-CONTAINING LIGHT TUBES/BULBS, AND POLYCHLORINATED BIPHENYLS (PCB)] FROM THE VA ROSEBURG HEALTH CARE SYSTEM, LOCATED AT 913 NW GARDEN VALLEY BLVD, ROSEBURG, OR. SEE HAZARDOUS MATERIAL TEST REPORT IN RESOURCE DOCUMENTS BOOK FOR AREAS

REQUIRING ABATEMENT.

ASBESTOS-CONTAINING MATERIALS

1. LOCATIONS OF ACM SHOWN IN THE HAZARDOUS MATERIAL TEST REPORT ARE SCHEMATIC AND APPROXIMATE. NOTE: A LIMITED HAZARDOUS MATERIALS

SURVEY WAS ACCOMPLISHED IN PREPARATION FOR THE WORK THAT MEETS THE REQUIREMENTS OF OREGON STATE DEPARTMENT OF ENVIRONMENTAL

QUALITY (DEQ) TO LOCATE AND IDENTIFY ASBESTOS-CONTAINING MATERIALS EXPECTED TO BE IMPACTED BY THE PROJECT. ALL ASBESTOS MATERIALS

WILL BE REMOVED WITHIN THE SCOPE OF THIS PROJECT. DEMOLITION FOR ACCESS TO CONCEALED ACM AND/OR ASSUMED ACM IS WITHIN THE SCOPE OF

WORK. IF ANY IDENTIFIED ACM, OR SUSPECT MATERIAL NOT ADDRESSED BY THE SURVEY WILL BE IMPACTED AND IS NOT CALLED-OUT BY OTHER WORK

AND IS NOT CALLED-OUT FOR REMOVAL, CONSULT THE CONTRACTING OFFICER PRIOR TO DISTURBANCE. ANY SUCH MATERIAL MUST BE TREATED AS ACM

UNLESS SAMPLED BY A CERTIFIED AHERA BUILDING INSPECTOR AND DETERMINED TO BE NON-ASBESTOS.

2. USE THE PROJECT HAZARDOUS MATERIALS SUMMARY LISTED IN THE REPORT FOR BASE BID QUANTITIES. QUANTITIES ARE CONSIDERED ACCURATE WITHIN

PLUS OR MINUS (+/-) TEN PERCENT (10%). NO CONTRACT CHANGES WILL BE CONSIDERED FOR VARIANCES IN THESE QUANTITIES OF LESS THAN 10%.

3. THE CONTRACTOR MUST VERIFY THE CONDITION, LOCATION, AND QUANTITIES OF HAZARDOUS MATERIALS IN THIS WORK PRIOR TO SUBMITTING A BID.

4. REFER TO CONTRACT AND CONTRACTOR'S APPROVED WORK PLAN FOR ASBESTOS REMOVAL AND DISPOSAL PROCEDURES AND REQUIREMENTS.

5. ONCE THE BUILDING IS TURNED OVER TO THE GC, CONTRACTOR WILL INFORM TESTING AGENCY, SO THAT ASSUMED ACM MATERIALS CAN BE TESTED FOR

ASBESTOS PRESENCE. IF MATERIALS ARE ELIMINATED AS AN ACM, OWNER MAY ISSUE A DEDUCTIVE CHANGE ORDER.

LEAD-CONTAINING MATERIALS

1. INTERIOR PAINTED/GLAZED SURFACES WERE FOUND TO CONTAIN LEAD (E.G., LEAD-BASED PAINT - LBP) AND/OR LEAD-CONTAINING BUILDING MATERIALS

(LCM). LCM MAY ALSO INCLUDE THE FOLLOWING: LEAD ROOF VENT PIPES, ROOF FLASHING, AND GLAZED CERAMIC TILES.

2. REFER TO THE HAZARDOUS MATERIALS REMOVAL SPECIFICATION 02 83 33.13 FOR IMPACTS TO LEAD COATED SURFACES AND LCM. REFER TO

SPECIFICATIONS FOR LEAD DISTURBANCES, DISPOSAL, AND TESTING REQUIREMENTS.

3. THE CONTRACTOR SHALL ASSUME THAT LEAD PAINT IS PRESENT ON ANY PAINTED BUILDING MATERIALS NOT TESTED. ALL WORK THAT MAY DISTURB

PAINT-CONTAINING LEAD OR OTHER LEAD BUILDING MATERIAL SHALL BE IN ACCORDANCE WITH DEQ, OREGON ADMINISTRATIVE RULES 340, DIVISION 248, OSHA REGULATION 29 CFR 1926.62, AND THE SPECIFICATIONS, INCLUDING DUST CONTROL, EMPLOYEE EXPOSURE ASSESSMENTS AND WASTE

CHARACTERIZATION.

MERCURY-CONTAINING LIGHT TUBES AND PCB-CONTAINING BALLASTS

1. INSPECT ALL LIGHT BALLASTS IN THE AREA, ALL IMPACTED MAGNETIC BALLASTS REGARDLESS OF LABELING AS "NO-PCBS" OR "PCB FREE", WILL BE

REMOVED AND DISPOSED OF AS HAZARDOUS WASTE IN ACCORDANCE WITH THE REGULATIONS AND THE CONTRACTOR'S APPROVED WORK PLAN. PARTIAL

DISASSEMBLY OF FLUORESCENT FIXTURES AND SELECTIVE DEMOLITION FOR ACCESS ARE INCLUDED IN THE SCOPE OF WORK. REFER TO CONTRACT

SPECIFICATIONS/DRAWINGS, REGULATIONS, AND CONTRACTOR'S APPROVED WORK PLAN FOR PCB-BALLAST REMOVAL AND DISPOSAL PROCEDURES.

BALLASTS LABELED "ELECTRONIC" MAY BE DISPOSED AS CONSTRUCTION DEBRIS.

2. ALL FLUORESCENT LIGHT TUBES CONTAIN MERCURY AND WILL BE RECYCLED IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND WITHOUT

BREAKAGE ON SITE. REFER TO THE CONTRACT SPECIFICATIONS, REGULATIONS, AND THE CONTRACTOR'S APPROVED WORK PLAN FOR LIGHT TUBE

RECYCLING PROCEDURES.

3. THE CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL ISOLATION OF ALL IMPACTED LIGHT FIXTURES AND SHALL VERIFY PRIOR TO COMMENCING WORK.

BOTTOM OF CEILING

CONSTRUCTION BARRIER

SURROUNDING EXIST DOOR, TYP

TAPE TOP OF CONSTRUCTION

BARRIER TO BOTTOM OF

CEILING, TYP

TAPE BOTTOM OF

CONSTRUCTION BARRIER

TO FLOOR SURFACE, TYP

STICKY TACKY MATT IN

FRONT OF FIRE RESISTANT

PLASTIC BARRIER, TYP

NEG AIR MACHINE, TYP

(INSTALL AT ICRA BARRIER IF

EXTERIOR WINDOW IS NOT

AVAILABLE).

TEMPORARY FIRE-RATED

DOOR , TYP

FIRE RESISTANT PLASTIC

DUST BARRIER

SURROUNDING DOOR, TYP

ZIPPER OPENING, TYP

STICKY TACKY MATT IN

FRONT OF VSIQUEEN

BARRIER

EXIST DOOR BEHIND

VISQUEEN BARRIER

EXTENSION POLES, TYP

NON-SKID PLATE JACK

SCREWED FROM END OF POLE

TO TOP OF CEILING, TYP

NON-SKID PLATE JACK

SCREWED FROM END OF POLE

TO BOTTOM OF FLOOR, TYP

BOTTOM OF CEILING

ICRA BARRIER DETAILS

AS101

MH

EC

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

LEGEND

KEY NOTES

GENERAL NOTES

NEGATIVE AIR MACHINE

TACKY CONSTRUCTION

WALK-OFF MATS

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST

BARRIER. MAY ONLY BE DURING NON-FUNCTIONAL MC

HOURS.

INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYP.

PLACE TACKY CONSTRUCTION WALK-OFF MATS AT

ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY

AREAS, TYP.

FOR CLASS III, NEG AIR MACHINE IS REQ'D AND SHALL BE

LOCATED EITHER AT THE ICRA BARRIER OR AT AN

EXTERIOR WINDOW. COORD WITH VA INFECTIOUS

PREVENTION TEAM AND COR.

1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV

ICRA REQUIREMENTS.

2. COORD ALL WORK WITH INFECTIOUS CONTROL RISK

ASSESSMENT FORM AND SPECIFICATION SECTION 01 35

26 - SAFETY REQUIREMENTS.

3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

ALL ICRA REQS. AT ANY TIME, THE COR MAY HALT

WORK UNTIL ALL REQS ARE MET.

4. REMOVE OR ISOLATE (E) HVAC SYSTEMS WITHIN

CONSTRUCTION AREA TO PREVENT DUST

CONTAMINATION.

5. CONTAIN ALL CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN

POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN

AREA IS IN ACTIVE ISOLATION.

6. CONTRACTOR IS REQ'D TO CLEAN AREA IMMEDIATELY

UPON COMPLETION OF WORK IN EACH ROOM OR BY THE

END OF EACH WORKDAY.

7. IN CLASS III AREAS, USE EXISTING RETURN AIR

SYSTEM TO CREATE NEGATIVE PRESSURE IN HALLWAY

CONSTRUCTION ZONE.

8. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE

DURING CONSTRUCTION, TYP.

9. INFECTION CONTROL MUST INSPECT EACH BARRIER

BEFORE CONSTRUCTION CAN BEGIN.

A. DURING CONSTRUCTION WORK:

1. OBTAIN PERMIT FROM THE CONTRACTING OFFICER REPRESENTATIVE.

2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM

NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.

4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A

DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

B. UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

THE CONTRACTING OFFICER REPRESENTATIVE AND THOROUGHLY CLEANED BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL

WORK HOURS.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

6. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS III ICRA CLASS REQUIREMENT

CLASS I ICRA CLASS REQUIREMENT

CLASS II ICRA CLASS REQUIREMENT

TYPICAL ICRA CLASS III - ELEVATION

0' 1' 2' 4'

SCALE BAR: 3/4" = 1'0"

TYPICAL ICRA CLASS II BARRIER - ELEVATION

0' 1' 2' 4'

SCALE BAR: 3/4" = 1'0"

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.

B. UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK

2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE OR CONTRACTING OFFICER REPRESENTATIVE.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE

SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE POSSIBLE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

B. UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED

5. NOTIFY THE OR CONTRACTING OFFICER REPRESENTATIVE.

TYPICAL ICRA CLASS II BARRIER - PLANVIEW

TYPICAL ICRA CLASS III BARRIER - PLANVIEW

0 4' 8'2'

SCALE: 1/4" = 1'-0"

0 4' 8'2'

SCALE: 1/4" = 1'-0"

N/A

AS101

AS101

AS101 1

INTERIOR ELEVATION FLAG

ENTRY

URGENT CARE

LOADING RN STATION

BLDG 84

MRI

ENTRANCE

DOCK

E.R.

AMBULANCE

LOADING

DOCK

TUNNEL

LAUNDRY

CHUTE

CO

FF

EE

VE

ND

ER

TUNNEL

DOCK

SWITCH GEAR

D114

619 SF

WORKSHOP

D112

202 SF

MED GAS

STORAGE

D113

175 SF

EXIST IT

CLOSET

SWITCH GEAR

D114

619 SF

WORKSHOP

D112

202 SF

MED GAS

STORAGE

D113

175 SF

LAUNDRY

CHUTE

NO

ARCHITECTURAL

DEMO

PHONE/DATA

B101

20 SF

CORRIDOR

E121A

226 SF

EMS

B127

159 SF

LAUNDRY

CHUTE

NO

ARCHITECTURAL

DEMO

PHONE/DATA

B101

20 SF

CORRIDOR

E121A

226 SF

EMS

B127

159 SF

1AC

ECMH

BUILDING 1AC - FIRST FLOOR

LEGEND

KEY NOTES

GENERAL NOTES

DEMO EXIST WIRE MESH FENCE AROUND IT EQUIPMENT.

PATCH AND PAINT (P-03) TO MATCH EXIST ADJ WALLS AND

FLOOR.

PROJECT

NORTH

BUILDING 1 & 1AC FIRST FLOOR - KEY PLAN

NOT TO SCALE

PROJECT

NORTH

ROOM D114 - DEMO FLOOR PLAN

(RELOCATE ROOM D114 TO ROOM D101A)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM D114 - EXIST R.C.P

(RELOCATE ROOM D114 TO ROOM D101A)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

D114

A-101a

PROJECT

NORTH

ROOM B101 - EXIST R.C.P

(RELOCATE TO ROOM B101 TO ROOM D101A)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM B101 - EXIST FLOOR PLAN

(RELOCATE ROOM B101 TO ROOM D101A)

B101

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXIST

OR ADJ EXIST UNLESS OTHERWISE NOTED.

2. ALL EXISTING OI&T AND FMS NETWORK, PHONE LAND

LINE (COPPER), PA BACKBONE AND EQUIP, FIRE ALARM

BACKBONE AND EQUIP, MATV, NURSE CALL, ETC. IN

ROOMS D114 AND B101 SHALL BE RELOCATED TO ROOM

D101A. ANY CABLES THAT ARE BELOW CAT6 SHALL BE

UPGRADED TO CAT6a. CABLES CAT6 AND ABOVE SHALL

REMAIN. COORD OTHER MODIFICATIONS IN ROOMS D114

AND B101 WITH MECH, ELEC, CIVIL, ICT DRAWING

SHEETS OR HAZMAT SURVEY REPORT.

EXIST WALL TO REMAIN

EXIST DOOR TO REMAIN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

PLANTER

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

AMBULATORY CARE (1-AC) BUILDING 1

AutoCAD SHX Text

ST.

AutoCAD SHX Text E137A

AutoCAD SHX Text

40 SF

AutoCAD SHX Text E178A

AutoCAD SHX Text

104 SF

AutoCAD SHX Text E178A

AutoCAD SHX Text

104 SF

AutoCAD SHX Text E162A

AutoCAD SHX Text

69 SF

AutoCAD SHX Text E162A

AutoCAD SHX Text

69 SF

AutoCAD SHX Text A101

AutoCAD SHX Text

41 SF

AutoCAD SHX Text A103

AutoCAD SHX Text

144 SF

AutoCAD SHX Text E101

AutoCAD SHX Text

246 SF

AutoCAD SHX Text A100A

AutoCAD SHX Text

332 SF

AutoCAD SHX Text E143

AutoCAD SHX Text

146 SF

AutoCAD SHX Text E141

AutoCAD SHX Text

147 SF

AutoCAD SHX Text E133B

AutoCAD SHX Text

157 SF

AutoCAD SHX Text A102

AutoCAD SHX Text

53 SF

AutoCAD SHX Text E162A

AutoCAD SHX Text

69 SF

AutoCAD SHX Text E101

AutoCAD SHX Text

246 SF

AutoCAD SHX Text E134A

AutoCAD SHX Text

49 SF

AutoCAD SHX Text D115

AutoCAD SHX Text

781 SF

AutoCAD SHX Text E141

AutoCAD SHX Text

1468 SF

AutoCAD SHX Text E138

AutoCAD SHX Text

78 SF

AutoCAD SHX Text D117A

AutoCAD SHX Text

180 SF

AutoCAD SHX Text D100

AutoCAD SHX Text

65 SF

AutoCAD SHX Text D105B

AutoCAD SHX Text

59 SF

AutoCAD SHX Text E133

AutoCAD SHX Text

248 SF

AutoCAD SHX Text E139

AutoCAD SHX Text

98 SF

AutoCAD SHX Text D116

AutoCAD SHX Text

287 SF

AutoCAD SHX Text E140

AutoCAD SHX Text

158 SF

AutoCAD SHX Text A100

AutoCAD SHX Text

154 SF

AutoCAD SHX Text E192A

AutoCAD SHX Text

58 SF

AutoCAD SHX Text E187A

AutoCAD SHX Text

63 SF

AutoCAD SHX Text E193K

AutoCAD SHX Text

97 SF

AutoCAD SHX Text D117

AutoCAD SHX Text

609 SF

AutoCAD SHX Text E124

AutoCAD SHX Text

1186 SF

AutoCAD SHX Text E188

AutoCAD SHX Text

81 SF

AutoCAD SHX Text D106

AutoCAD SHX Text

113 SF

AutoCAD SHX Text D105D

AutoCAD SHX Text

157 SF

AutoCAD SHX Text E193

AutoCAD SHX Text

420 SF

AutoCAD SHX Text D105A

AutoCAD SHX Text

160 SF

AutoCAD SHX Text E193F

AutoCAD SHX Text

111 SF

AutoCAD SHX Text D105C

AutoCAD SHX Text

121 SF

AutoCAD SHX Text E178

AutoCAD SHX Text

623 SF

AutoCAD SHX Text E135

AutoCAD SHX Text

105 SF

AutoCAD SHX Text D105

AutoCAD SHX Text

222 SF

AutoCAD SHX Text E129

AutoCAD SHX Text

55 SF

AutoCAD SHX Text D114

AutoCAD SHX Text

619 SF

AutoCAD SHX Text E130

AutoCAD SHX Text

55 SF

AutoCAD SHX Text D112

AutoCAD SHX Text

202 SF

AutoCAD SHX Text E137

AutoCAD SHX Text

166 SF

AutoCAD SHX Text E193E

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E142

AutoCAD SHX Text

48 SF

AutoCAD SHX Text E131

AutoCAD SHX Text

166 SF

AutoCAD SHX Text D104

AutoCAD SHX Text

126 SF

AutoCAD SHX Text D102

AutoCAD SHX Text

259 SF

AutoCAD SHX Text D113

AutoCAD SHX Text

175 SF

AutoCAD SHX Text E193D

AutoCAD SHX Text

111 SF

AutoCAD SHX Text D107

AutoCAD SHX Text

269 SF

AutoCAD SHX Text E190

AutoCAD SHX Text

111 SF

AutoCAD SHX Text D108

AutoCAD SHX Text

216 SF

AutoCAD SHX Text E193A1

AutoCAD SHX Text

63 SF

AutoCAD SHX Text E193J

AutoCAD SHX Text

104 SF

AutoCAD SHX Text E128E

AutoCAD SHX Text

187 SF

AutoCAD SHX Text E128

AutoCAD SHX Text

633 SF

AutoCAD SHX Text D110

AutoCAD SHX Text

252 SF

AutoCAD SHX Text E180A

AutoCAD SHX Text

110 SF

AutoCAD SHX Text E180

AutoCAD SHX Text

819 SF

AutoCAD SHX Text D103

AutoCAD SHX Text

51 SF

AutoCAD SHX Text D109

AutoCAD SHX Text

303 SF

AutoCAD SHX Text E189

AutoCAD SHX Text

69 SF

AutoCAD SHX Text E177

AutoCAD SHX Text

607 SF

AutoCAD SHX Text E180I

AutoCAD SHX Text

107 SF

AutoCAD SHX Text 179A

AutoCAD SHX Text

57 SF

AutoCAD SHX Text E184

AutoCAD SHX Text

73 SF

AutoCAD SHX Text E182

AutoCAD SHX Text

101 SF

AutoCAD SHX Text E180B

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E134

AutoCAD SHX Text

110 SF

AutoCAD SHX Text E106

AutoCAD SHX Text

98 SF

AutoCAD SHX Text E163G

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E108

AutoCAD SHX Text

98 SF

AutoCAD SHX Text E186

AutoCAD SHX Text

50 SF

AutoCAD SHX Text E183

AutoCAD SHX Text

170 SF

AutoCAD SHX Text E105

AutoCAD SHX Text

44 SF

AutoCAD SHX Text E191

AutoCAD SHX Text

585 SF

AutoCAD SHX Text E178B

AutoCAD SHX Text

103 SF

AutoCAD SHX Text E132

AutoCAD SHX Text

444 SF

AutoCAD SHX Text E114

AutoCAD SHX Text

192 SF

AutoCAD SHX Text E178A

AutoCAD SHX Text

104 SF

AutoCAD SHX Text E107

AutoCAD SHX Text

98 SF

AutoCAD SHX Text E181

AutoCAD SHX Text

51 SF

AutoCAD SHX Text E194

AutoCAD SHX Text

362 SF

AutoCAD SHX Text E193I

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E193H1

AutoCAD SHX Text

46 SF

AutoCAD SHX Text E193H

AutoCAD SHX Text

109 SF

AutoCAD SHX Text E160

AutoCAD SHX Text

56 SF

AutoCAD SHX Text E192

AutoCAD SHX Text

261 SF

AutoCAD SHX Text E151

AutoCAD SHX Text

110 SF

AutoCAD SHX Text E179

AutoCAD SHX Text

474 SF

AutoCAD SHX Text E149

AutoCAD SHX Text

168 SF

AutoCAD SHX Text E111

AutoCAD SHX Text

71 SF

AutoCAD SHX Text E120

AutoCAD SHX Text

174 SF

AutoCAD SHX Text E123

AutoCAD SHX Text

223 SF

AutoCAD SHX Text E180K

AutoCAD SHX Text

109 SF

AutoCAD SHX Text E153

AutoCAD SHX Text

109 SF

AutoCAD SHX Text

144 SF

AutoCAD SHX Text E109

AutoCAD SHX Text

98 SF

AutoCAD SHX Text E193B

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E180A1

AutoCAD SHX Text

64 SF

AutoCAD SHX Text E118

AutoCAD SHX Text

669 SF

AutoCAD SHX Text E117

AutoCAD SHX Text

101 SF

AutoCAD SHX Text E113

AutoCAD SHX Text

46 SF

AutoCAD SHX Text E159

AutoCAD SHX Text

51 SF

AutoCAD SHX Text E155

AutoCAD SHX Text

188 SF

AutoCAD SHX Text E116

AutoCAD SHX Text

41 SF

AutoCAD SHX Text D107A

AutoCAD SHX Text

122 SF

AutoCAD SHX Text E180J

AutoCAD SHX Text

109 SF

AutoCAD SHX Text D101A

AutoCAD SHX Text

96 SF

AutoCAD SHX Text E185

AutoCAD SHX Text

71 SF

AutoCAD SHX Text E187

AutoCAD SHX Text

44 SF

AutoCAD SHX Text E193C

AutoCAD SHX Text

136 SF

AutoCAD SHX Text E115A

AutoCAD SHX Text

23 SF

AutoCAD SHX Text E176J

AutoCAD SHX Text

100 SF

AutoCAD SHX Text E144

AutoCAD SHX Text

922 SF

AutoCAD SHX Text E174

AutoCAD SHX Text

628 SF

AutoCAD SHX Text E118

AutoCAD SHX Text

669 SF

AutoCAD SHX Text E169

AutoCAD SHX Text

72 SF

AutoCAD SHX Text E166

AutoCAD SHX Text

73 SF

AutoCAD SHX Text E133A

AutoCAD SHX Text

433 SF

AutoCAD SHX Text E171

AutoCAD SHX Text

73 SF

AutoCAD SHX Text E165

AutoCAD SHX Text

44 SF

AutoCAD SHX Text E127A

AutoCAD SHX Text

433 SF

AutoCAD SHX Text E173

AutoCAD SHX Text

73 SF

AutoCAD SHX Text E163A

AutoCAD SHX Text

62 SF

AutoCAD SHX Text E122

AutoCAD SHX Text

202 SF

AutoCAD SHX Text E162

AutoCAD SHX Text

145 SF

AutoCAD SHX Text E175

AutoCAD SHX Text

724 SF

AutoCAD SHX Text D101

AutoCAD SHX Text

234 SF

AutoCAD SHX Text E125

AutoCAD SHX Text

71 SF

AutoCAD SHX Text E115

AutoCAD SHX Text

128 SF

AutoCAD SHX Text E103

AutoCAD SHX Text

505 SF

AutoCAD SHX Text E103

AutoCAD SHX Text

465 SF

AutoCAD SHX Text E154

AutoCAD SHX Text

115 SF

AutoCAD SHX Text E164H

AutoCAD SHX Text

109 SF

AutoCAD SHX Text E161

AutoCAD SHX Text

628 SF

AutoCAD SHX Text E175A

AutoCAD SHX Text

62 SF

AutoCAD SHX Text E136

AutoCAD SHX Text

105 SF

AutoCAD SHX Text E152

AutoCAD SHX Text

122 SF

AutoCAD SHX Text E162A

AutoCAD SHX Text

69 SF

AutoCAD SHX Text E180F

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E165A

AutoCAD SHX Text

80 SF

AutoCAD SHX Text E104

AutoCAD SHX Text

183 SF

AutoCAD SHX Text E164G

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E193

AutoCAD SHX Text

371 SF

AutoCAD SHX Text E102

AutoCAD SHX Text

565 SF

AutoCAD SHX Text E150

AutoCAD SHX Text

110 SF

AutoCAD SHX Text E176J1

AutoCAD SHX Text

47 SF

AutoCAD SHX Text E176H

AutoCAD SHX Text

109 SF

AutoCAD SHX Text E147

AutoCAD SHX Text

1197 SF

AutoCAD SHX Text E148D

AutoCAD SHX Text

146 SF

AutoCAD SHX Text E176

AutoCAD SHX Text

673 SF

AutoCAD SHX Text E164J

AutoCAD SHX Text

95 SF

AutoCAD SHX Text E100

AutoCAD SHX Text

1222 SF

AutoCAD SHX Text E164I

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E164C

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E167

AutoCAD SHX Text

165 SF

AutoCAD SHX Text E164E

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E164D

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E164F

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E112

AutoCAD SHX Text

157 SF

AutoCAD SHX Text E180C

AutoCAD SHX Text

114 SF

AutoCAD SHX Text E176A

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E132A

AutoCAD SHX Text

799 SF

AutoCAD SHX Text E180E

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E168

AutoCAD SHX Text

50 SF

AutoCAD SHX Text E100

AutoCAD SHX Text

582 SF

AutoCAD SHX Text D107B

AutoCAD SHX Text

121 SF

AutoCAD SHX Text E176G

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E148B

AutoCAD SHX Text

710 SF

AutoCAD SHX Text

TLT.

AutoCAD SHX Text

45 SF

AutoCAD SHX Text E176C

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E180D

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E126A

AutoCAD SHX Text

57 SF

AutoCAD SHX Text E164A-1

AutoCAD SHX Text

63 SF

AutoCAD SHX Text E132A1

AutoCAD SHX Text

235 SF

AutoCAD SHX Text E176E

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E156

AutoCAD SHX Text

58 SF

AutoCAD SHX Text E158

AutoCAD SHX Text

235 SF

AutoCAD SHX Text E176B

AutoCAD SHX Text

110 SF

AutoCAD SHX Text E163

AutoCAD SHX Text

714 SF

AutoCAD SHX Text E164A

AutoCAD SHX Text

146 SF

AutoCAD SHX Text E157

AutoCAD SHX Text

158 SF

AutoCAD SHX Text E148A

AutoCAD SHX Text

272 SF

AutoCAD SHX Text E193A

AutoCAD SHX Text

517 SF

AutoCAD SHX Text E118

AutoCAD SHX Text

262 SF

AutoCAD SHX Text E146

AutoCAD SHX Text

149 SF

AutoCAD SHX Text E164J4

AutoCAD SHX Text

53 SF

AutoCAD SHX Text E164

AutoCAD SHX Text

653 SF

AutoCAD SHX Text E176I

AutoCAD SHX Text

112 SF

AutoCAD SHX Text D111

AutoCAD SHX Text

522 SF

AutoCAD SHX Text E110

AutoCAD SHX Text

44 SF

AutoCAD SHX Text E132A2

AutoCAD SHX Text

248 SF

AutoCAD SHX Text E176D

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E121

AutoCAD SHX Text

173 SF

AutoCAD SHX Text E148C

AutoCAD SHX Text

1671 SF

AutoCAD SHX Text E164B

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E180H

AutoCAD SHX Text

97 SF

AutoCAD SHX Text E126B

AutoCAD SHX Text

183 SF

AutoCAD SHX Text E119

AutoCAD SHX Text

169 SF

AutoCAD SHX Text E172

AutoCAD SHX Text

112 SF

AutoCAD SHX Text E126

AutoCAD SHX Text

221 SF

AutoCAD SHX Text E180G

AutoCAD SHX Text

111 SF

AutoCAD SHX Text E152A

AutoCAD SHX Text

122 SF

AutoCAD SHX Text E176F

AutoCAD SHX Text

114 SF

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

DN

AutoCAD SHX Text

PLANTER

AutoCAD SHX Text

DN

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

DN

AutoCAD SHX Text

RISER

AutoCAD SHX Text

DN

AutoCAD SHX Text

GATE

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text E109

AutoCAD SHX Text

DOCK

AutoCAD SHX Text C100J

AutoCAD SHX Text

45 SF

AutoCAD SHX Text A106

AutoCAD SHX Text

97 SF

AutoCAD SHX Text A106K

AutoCAD SHX Text

48 SF

AutoCAD SHX Text E123

AutoCAD SHX Text

139 SF

AutoCAD SHX Text A106J

AutoCAD SHX Text

14 SF

AutoCAD SHX Text A106I

AutoCAD SHX Text

142 SF

AutoCAD SHX Text A106H

AutoCAD SHX Text

134 SF

AutoCAD SHX Text A106G

AutoCAD SHX Text

147 SF

AutoCAD SHX Text A106E

AutoCAD SHX Text

133 SF

AutoCAD SHX Text A106D

AutoCAD SHX Text

174 SF

AutoCAD SHX Text A106C

AutoCAD SHX Text

28 SF

AutoCAD SHX Text A106B

AutoCAD SHX Text

183 SF

AutoCAD SHX Text A106A

AutoCAD SHX Text

235 SF

AutoCAD SHX Text

RECTANGULAR LAVATORY

AutoCAD SHX Text

RECTANGULAR LAVATORY

AutoCAD SHX Text

51 SF

AutoCAD SHX Text A100C

AutoCAD SHX Text

82 SF

AutoCAD SHX Text E137A

AutoCAD SHX Text

40 SF

AutoCAD SHX Text E122

AutoCAD SHX Text

222 SF

AutoCAD SHX Text

150 SF

AutoCAD SHX Text B111A

AutoCAD SHX Text

23 SF

AutoCAD SHX Text B11B

AutoCAD SHX Text

48 SF

AutoCAD SHX Text E121

AutoCAD SHX Text

731 SF

AutoCAD SHX Text B111C

AutoCAD SHX Text

199 SF

AutoCAD SHX Text B126

AutoCAD SHX Text

333 SF

AutoCAD SHX Text B101

AutoCAD SHX Text

20 SF

AutoCAD SHX Text E121A

AutoCAD SHX Text

226 SF

AutoCAD SHX Text B127

AutoCAD SHX Text

159 SF

AutoCAD SHX Text B103A

AutoCAD SHX Text

32 SF

AutoCAD SHX Text B103

AutoCAD SHX Text

32 SF

AutoCAD SHX Text B105

AutoCAD SHX Text

116 SF

AutoCAD SHX Text B107

AutoCAD SHX Text

160 SF

AutoCAD SHX Text E101

AutoCAD SHX Text

332 SF

AutoCAD SHX Text E121A

AutoCAD SHX Text

769 SF

AutoCAD SHX Text B108

AutoCAD SHX Text

191 SF

AutoCAD SHX Text B121

AutoCAD SHX Text

136 SF

AutoCAD SHX Text B122

AutoCAD SHX Text

283 SF

AutoCAD SHX Text B118

AutoCAD SHX Text

194 SF

AutoCAD SHX Text B120A

AutoCAD SHX Text

46 SF

AutoCAD SHX Text B119

AutoCAD SHX Text

56 SF

AutoCAD SHX Text E101A

AutoCAD SHX Text

470 SF

AutoCAD SHX Text B116

AutoCAD SHX Text

66 SF

AutoCAD SHX Text B115B

AutoCAD SHX Text

51 SF

AutoCAD SHX Text B115

AutoCAD SHX Text

323 SF

AutoCAD SHX Text B114B

AutoCAD SHX Text

55 SF

AutoCAD SHX Text B114A

AutoCAD SHX Text

67 SF

AutoCAD SHX Text B114

AutoCAD SHX Text

429 SF

AutoCAD SHX Text B113

AutoCAD SHX Text

15 SF

AutoCAD SHX Text B112

AutoCAD SHX Text

22 SF

AutoCAD SHX Text B111

AutoCAD SHX Text

31 SF

AutoCAD SHX Text B110

AutoCAD SHX Text

35 SF

AutoCAD SHX Text B109

AutoCAD SHX Text

60 SF

AutoCAD SHX Text B106

AutoCAD SHX Text

270 SF

AutoCAD SHX Text B106A

AutoCAD SHX Text

41 SF

AutoCAD SHX Text B106B

AutoCAD SHX Text

41 SF

AutoCAD SHX Text B106C

AutoCAD SHX Text

73 SF

AutoCAD SHX Text B104B

AutoCAD SHX Text

66 SF

AutoCAD SHX Text B104A

AutoCAD SHX Text

66 SF

AutoCAD SHX Text B104

AutoCAD SHX Text

270 SF

AutoCAD SHX Text E101B

AutoCAD SHX Text

339 SF

AutoCAD SHX Text B102A

AutoCAD SHX Text

143 SF

AutoCAD SHX Text B100

AutoCAD SHX Text

58 SF

AutoCAD SHX Text B102

AutoCAD SHX Text

374 SF

AutoCAD SHX Text E111

AutoCAD SHX Text

282 SF

AutoCAD SHX Text C105C

AutoCAD SHX Text

686 SF

AutoCAD SHX Text C115A

AutoCAD SHX Text

170 SF

AutoCAD SHX Text C115B

AutoCAD SHX Text

124 SF

AutoCAD SHX Text C115C

AutoCAD SHX Text

416 SF

AutoCAD SHX Text C112

AutoCAD SHX Text

352 SF

AutoCAD SHX Text C105B

AutoCAD SHX Text

810 SF

AutoCAD SHX Text C105A

AutoCAD SHX Text

132 SF

AutoCAD SHX Text C105D

AutoCAD SHX Text

100 SF

AutoCAD SHX Text C105E

AutoCAD SHX Text

277 SF

AutoCAD SHX Text E117

AutoCAD SHX Text

641 SF

AutoCAD SHX Text C113F

AutoCAD SHX Text

108 SF

AutoCAD SHX Text C113E

AutoCAD SHX Text

115 SF

AutoCAD SHX Text C113D

AutoCAD SHX Text

214 SF

AutoCAD SHX Text C111

AutoCAD SHX Text

302 SF

AutoCAD SHX Text E123

AutoCAD SHX Text

602 SF

AutoCAD SHX Text C111A

AutoCAD SHX Text

119 SF

AutoCAD SHX Text C110

AutoCAD SHX Text

208 SF

AutoCAD SHX Text C109

AutoCAD SHX Text

46 SF

AutoCAD SHX Text C110

AutoCAD SHX Text

73 SF

AutoCAD SHX Text C110A

AutoCAD SHX Text

167 SF

AutoCAD SHX Text C100J

AutoCAD SHX Text

181 SF

AutoCAD SHX Text C100L

AutoCAD SHX Text

158 SF

AutoCAD SHX Text C108

AutoCAD SHX Text

352 SF

AutoCAD SHX Text E120

AutoCAD SHX Text

673 SF

AutoCAD SHX Text C106A

AutoCAD SHX Text

115 SF

AutoCAD SHX Text C106A

AutoCAD SHX Text

557 SF

AutoCAD SHX Text C107

AutoCAD SHX Text

321 SF

AutoCAD SHX Text C108A

AutoCAD SHX Text

104 SF

AutoCAD SHX Text C100E

AutoCAD SHX Text

277 SF

AutoCAD SHX Text E136

AutoCAD SHX Text

125 SF

AutoCAD SHX Text E135

AutoCAD SHX Text

267 SF

AutoCAD SHX Text C100B

AutoCAD SHX Text

780 SF

AutoCAD SHX Text C100I

AutoCAD SHX Text

70 SF

AutoCAD SHX Text C100D

AutoCAD SHX Text

644 SF

AutoCAD SHX Text C100F

AutoCAD SHX Text

32 SF

AutoCAD SHX Text C100G

AutoCAD SHX Text

25 SF

AutoCAD SHX Text C100H

AutoCAD SHX Text

46 SF

AutoCAD SHX Text C102

AutoCAD SHX Text

43 SF

AutoCAD SHX Text C101

AutoCAD SHX Text

298 SF

AutoCAD SHX Text C100

AutoCAD SHX Text

297 SF

AutoCAD SHX Text C100A

AutoCAD SHX Text

200 SF

AutoCAD SHX Text E107

AutoCAD SHX Text

379 SF

AutoCAD SHX Text C104

AutoCAD SHX Text

139 SF

AutoCAD SHX Text C104A

AutoCAD SHX Text

145 SF

AutoCAD SHX Text C103C

AutoCAD SHX Text

649 SF

AutoCAD SHX Text C103A

AutoCAD SHX Text

73 SF

AutoCAD SHX Text C103B

AutoCAD SHX Text

30 SF

AutoCAD SHX Text C103

AutoCAD SHX Text

254 SF

AutoCAD SHX Text E100

AutoCAD SHX Text

399 SF

AutoCAD SHX Text E100A

AutoCAD SHX Text

134 SF

AutoCAD SHX Text

114 SF

AutoCAD SHX Text E106

AutoCAD SHX Text

159 SF

AutoCAD SHX Text E104

AutoCAD SHX Text

31 SF

AutoCAD SHX Text E118A

AutoCAD SHX Text

53 SF

AutoCAD SHX Text E100

AutoCAD SHX Text

1528 SF

AutoCAD SHX Text A102

AutoCAD SHX Text

75 SF

AutoCAD SHX Text A102A

AutoCAD SHX Text

85 SF

AutoCAD SHX Text A100E

AutoCAD SHX Text

245 SF

AutoCAD SHX Text A100F

AutoCAD SHX Text

135 SF

AutoCAD SHX Text A100-1

AutoCAD SHX Text

16 SF

AutoCAD SHX Text A100-2

AutoCAD SHX Text

19 SF

AutoCAD SHX Text A100B

AutoCAD SHX Text

273 SF

AutoCAD SHX Text A100A

AutoCAD SHX Text

118 SF

AutoCAD SHX Text A100

AutoCAD SHX Text

192 SF

AutoCAD SHX Text E102

AutoCAD SHX Text

920 SF

AutoCAD SHX Text A101

AutoCAD SHX Text

166 SF

AutoCAD SHX Text A103

AutoCAD SHX Text

145 SF

AutoCAD SHX Text A104

AutoCAD SHX Text

161 SF

AutoCAD SHX Text A105B

AutoCAD SHX Text

40 SF

AutoCAD SHX Text A105A

AutoCAD SHX Text

23 SF

AutoCAD SHX Text A105

AutoCAD SHX Text

161 SF

AutoCAD SHX Text E103

AutoCAD SHX Text

170 SF

AutoCAD SHX Text E103A

AutoCAD SHX Text

14 SF

AutoCAD SHX Text A108A

AutoCAD SHX Text

183 SF

AutoCAD SHX Text A108

AutoCAD SHX Text

365 SF

AutoCAD SHX Text A109

AutoCAD SHX Text

418 SF

AutoCAD SHX Text C113C

AutoCAD SHX Text

236 SF

AutoCAD SHX Text A106F

AutoCAD SHX Text

133 SF

AutoCAD SHX Text

DN

DN

ENTRY

URGENT CARE

LOADING RN STATION

BLDG 84

MRI

ENTRANCE

DOCK

E.R.

AMBULANCE

LOADING

DOCK

TUNNEL

LAUNDRY

CHUTE

CO

FF

EE

VE

ND

ER

TUNNEL

DOCK

VE

ND

ER

CO

FF

EE

CO

FF

EE

CANTEEN

STORAGE

D101A

96 SF

FEMALE TLT.

D101

234 SF

HSK

D100

65 SF

HALL

D117A

180 SF

H

R H

R H

R H

R H

R

VE

ND

ER

FEMALE TLT.

D101

234 SF

HSK

D100

65 SF

HALL

D117A

180 SF

TR

D101A

96 SF

H

R H

R H

R H

R H

R

VE

ND

ER

CO

FF

EE

CO

FF

EE

FEMALE TLT.

D101

234 SF

HSK

D100

65 SF

HALL

D117A

180 SF

TR

D101A

96 SF

4'-10"

EQ

EQ

H

R H

R H

R H

R H

R

VE

ND

ER

CO

FF

EE

CO

FF

EE

CANTEEN

STORAGE

D101A

96 SF

FEMALE TLT.

D101

234 SF

HSK

D100

65 SF

HALL

D117A

180 SF

H

R H

R H

R H

R H

R

TR

E156

58 SF

CORRIDOR

E148B

710 SF

FEMALE TLT.

E157

158 SF

EQ EQ

TR

E156

58 SF

CORRIDOR

E148B

710 SF

FEMALE TLT.

E157

158 SF

NO

ARCHITECTURAL

DEMO

TR

E156

58 SF

CORRIDOR

E148B

710 SF

FEMALE TLT.

E157

158 SF

1AC

ECMH

BUILDING 1AC - FIRST FLOOR

LEGEND

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

BUILDING 1 & 1AC FIRST FLOOR - KEY PLAN

NOT TO SCALE

PROJECT

NORTH

ROOM D101A - DEMO FLOOR PLAN

(RELOCATE ROOM D114 & B101 TO ROOM D101A)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM D101A - FLOOR PLAN

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM D101A - DEMO R.C.P

(RELOCATE ROOM D114 & B101 TO ROOM D101A)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM D101A - R.C.P

0 4' 8'2'

SCALE: 1/4" = 1'-0"

D101A

A-101b

PROJECT

NORTH

ROOM E156 - FLOOR PLAN

(UPGRADE EXIST TR)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ROOM E156 - R.C.P

0 4' 8'2'

SCALE: 1/4" = 1'-0"

E156

PROJECT

NORTH

ROOM E156 - DEMO R.C.P

(UPGRADE EXIST TR)

0 4' 8'2'

SCALE: 1/4" = 1'-0"

Phase

ARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 1st Ave #301

Seattle, WA, 98104

(360) 223 - 8994

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

653-20-107

Revisions: Date:

SPEES DESIGN BUILD

EHRM INFRASTRUCTURE

UPGRADES

06/29/2020

Roseburg VA Health Care System -

Roseburg, OR

EXIST WALL TO REMAIN

EXIST DOOR TO DEMOLISH

EXIST DOOR TO REMAIN

2'-0" X 2'-0" LIGHT TO DEMOLISH

2'-0" x 2'-0" ACT TO DEMOLISH

DOOR TO INSTALL / DOOR TAG (SEE

DOOR SCHEDULE ON SHEET AE600)

1'-0" X 4'-0" LIGHT TO INSTALL (SEE ELEC)

1. WHERE ACT HAS BEEN DEMOLISHED, PATCH WALLS AND

FINISH WITH LEVEL 4. PAINT WALLS (P-03) TO MATCH

EXIST, TYP.

2. ANY EXIST WALLS IN ROOM D101A THAT ARE EXPOSED

TO VIEW WHERE NO PLYWOOD IS MOUNTED SHALL BE

PAINTED WHITE (P-01).

3. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXIST

OR ADJ EXIST UNLESS OTHERWISE NOTED.

4. EXIST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .