CD-2.pdf

PDF 290 KB Posted

Attached to
City of Royal Oak - Electric Vehicle Infrastructure & Charging Stations
Solicitation number
REQ-RO-2025-023
Issued by
Macomb County, Michigan

About this file

This document is a detailed engineering drawing (CD-2) for the City of Royal Oak's Senior Community Center EV Charging Station Project, prepared by HRC Engineering. The drawing provides technical specifications for a new composite fence gate and typical equipment rack foundation, specifically related to the electric vehicle charging infrastructure installation. The document is marked "For Review" with a date of 02/04/2025, indicating it is a pre-construction design review document for the proposed EV charging station project.

The drawing includes precise technical details such as fence gate dimensions, gate post specifications, concrete pavement details for equipment placement, and foundation requirements. The design shows multiple views including a new composite fence gate detail, equipment rack foundation detail, and typical concrete pavement layout for equipment. The drawing is part of the civil site project details, suggesting careful planning for the infrastructure supporting the new EV charging stations at the Senior Community Center, with attention to structural integrity, mounting, and site preparation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED

CHECKED

DRAWN

DESIGNED

DATE

HRC JOB NO.

DATE

SCALE

ADDITIONS AND/OR REVISIONS

SHEET

NO.

OF

555 HULET DRIVE

BLOOMFIELD HILLS, MICH.

P.O. BOX 824

48303 - 0824

PHONE: (248) 454-6300

WEB SITE: www.hrcengr.com

FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359

CITY OF ROYAL OAK

SENIOR COMMUNITY

CENTER EV CHARGING

STATION PROJECT

For Review

02/04/2025 10:30:05 AM

File details come from the government source that posted it. Updated .