CD-1.pdf

PDF 440 KB Posted

Attached to
City of Royal Oak - Electric Vehicle Infrastructure & Charging Stations
Solicitation number
REQ-RO-2025-023
Issued by
Macomb County, Michigan

About this file

This document is a detailed civil site design plan (CD-1) for the City of Royal Oak Senior Community Center EV Charging Station Project, prepared by HRC Engineers. The plan provides comprehensive technical specifications for installing electric vehicle charging infrastructure, including detailed drawings for Level 2 and Level 3 charger foundations, bollard layouts, equipment pad configurations, pavement markings, and signage. The drawings specify construction requirements for concrete foundations, electrical conduit placement, mounting details for charging station equipment, and specific pavement markings designating "Electric Car Parking Only While Charging" zones.

The technical drawings include critical installation details such as foundation dimensions, reinforcement specifications, conduit routing, and specific construction notes emphasizing proper concrete mix, compaction, and site preparation. The design incorporates multiple view perspectives including plan views, section details (A-A and C-C), and specific mounting instructions for bollards and signage. The document is marked "For Review" with a date of 02/04/2025, suggesting this is a preliminary design stage for the municipal infrastructure project, with precise engineering specifications to guide the eventual construction and installation of the EV charging stations at the Senior Community Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EV

CHARGING

ONLY

APPROVED

CHECKED

DRAWN

DESIGNED

DATE

HRC JOB NO.

DATE

SCALE

ADDITIONS AND/OR REVISIONS

SHEET

NO.

OF

555 HULET DRIVE

BLOOMFIELD HILLS, MICH.

P.O. BOX 824

48303 - 0824

PHONE: (248) 454-6300

WEB SITE: www.hrcengr.com

FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359

CITY OF ROYAL OAK

SENIOR COMMUNITY

CENTER EV CHARGING

STATION PROJECT

For Review

02/04/2025 10:29:58 AM

File details come from the government source that posted it. Updated .