CD-1.pdf
PDF 440 KB Posted
- Solicitation number
- REQ-RO-2025-023
- Issued by
- Macomb County, Michigan
About this file
This document is a detailed civil site design plan (CD-1) for the City of Royal Oak Senior Community Center EV Charging Station Project, prepared by HRC Engineers. The plan provides comprehensive technical specifications for installing electric vehicle charging infrastructure, including detailed drawings for Level 2 and Level 3 charger foundations, bollard layouts, equipment pad configurations, pavement markings, and signage. The drawings specify construction requirements for concrete foundations, electrical conduit placement, mounting details for charging station equipment, and specific pavement markings designating "Electric Car Parking Only While Charging" zones.
The technical drawings include critical installation details such as foundation dimensions, reinforcement specifications, conduit routing, and specific construction notes emphasizing proper concrete mix, compaction, and site preparation. The design incorporates multiple view perspectives including plan views, section details (A-A and C-C), and specific mounting instructions for bollards and signage. The document is marked "For Review" with a date of 02/04/2025, suggesting this is a preliminary design stage for the municipal infrastructure project, with precise engineering specifications to guide the eventual construction and installation of the EV charging stations at the Senior Community Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| City_of_Royal_Oak_-_Electric_Vehicle_Infrastructure_&_Charging_Stations_(Addendum_#1_Revision).pdf | ||
| CD-2.pdf | ||
| 20250401_Issued_For_Bids_SeniorCommunityCenter.pdf | ||
| 20250401_Bid_Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EV
CHARGING
ONLY
APPROVED
CHECKED
DRAWN
DESIGNED
DATE
HRC JOB NO.
DATE
SCALE
ADDITIONS AND/OR REVISIONS
SHEET
NO.
OF
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
WEB SITE: www.hrcengr.com
FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359
CITY OF ROYAL OAK
SENIOR COMMUNITY
CENTER EV CHARGING
STATION PROJECT
For Review
02/04/2025 10:29:58 AM
File details come from the government source that posted it. Updated .