This is a Mechanical, Electrical, and Plumbing (MEP) Addendum #1 for the BNSF Welding Studio Phase II project at Community College of Denver, located at 2570 31st Street, Denver, Colorado. The addendum, dated November 7, 2016, consists of two technical drawings: a Mechanical Floor Plan (M-101) and a Level 1 Power Plan (E-101), both at a scale of 1/8" = 1'-0". The mechanical scope includes relocation and extension of an existing 8-inch duct, installation of a 7-inch round duct routed to slot hoods at a plasma cutting station and plasma table with 750 CFM exhaust capacity, installation of manual blast gates, and support framing using Unistrut mounted to the floor. The project also requires balancing of exhaust fans (EF 1-4) on the roof above, each collection point requiring 750 CFM, and balancing of make-up air units (MAU 1-2) to a maximum of 4,200 CFM. The owner will contract separately with a dust collection system vendor for spark coolers, ductwork, welding fume hoods, and blast gates. Additionally, 3/4-inch and 3/8-inch compressed air lines must be connected to serve fume extractors and self-cleaning fume extraction systems mounted on Unistrut support.

The electrical scope requires installation of a new 60-amp, 480-volt, 3-phase receptacle to serve arc welders with specific Meltic components and 6-foot SOOW cord lengths. All conduit 10 feet or less above finished floor shall be galvanized rigid conduit (GRC), while conduit 10 feet and greater shall be electrical metallic tubing (EMT), all surface-mounted to existing walls, Unistrut support, columns, and roof structure. The power plan identifies multiple existing panels (WLP1, WLP2, WHP1, WHP2, WHP3, WHP4, MLP1, MLP2, MHP1, MDP, CLP1) and transformers, with a new panel WHP4 to be installed. Specific flag notes address ceiling coordination requirements for all MEP systems prior to installation commencement, avoidance of ductwork routing over electrical rooms with proper National Electrical Code clearances, and coordination with Division 16 contractors. All new receptacles require hinged "in-use" covers, and fire alarm notification appliances must be relocated to new locations with extended fire alarm cabling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

UP

UP

UP

A

BCDEFGHI

MECHANICAL FLOOR PLAN

1/8" = 1'-0"

"ø

"ø

"ø

8" ø

# FLAG NOTES:

1. CEILING COORDINATION OF ALL MEP SYSTEMS

(LIGHTING, DUCTWORK, DIFFUSERS,

ELECTRICAL, FIRE PROTECTION, ETC.) MUST

BE COMPLETED BY THE CONTRACTOR PRIOR

TO THE START OF ANY INSTALLATIONS.

2. AVOID ROUTING DUCTWORK OVER

ELECTRICAL ROOMS OR ELECTRICAL PANELS;

MAINTAIN N.E.C. CLEARANCES. COORDINATE

ROUTINGS WITH DIV. 16 CONTRACTOR.

HVAC NOTES:

17"ø

6" ø

8" ø

9" ø

"ø

"ø

"ø

19"ø 17"ø20"ø21"ø

22"ø

SPARK

COOLER

T

8"ø

T 18 " Ø

" Ø 12

"ø

"ø

"ø

T

PROJECT SCOPE

18"ø

NEW DUCTS 8" AND SMALLER

SHALL BE 22 GAUGE.

"Ø

9" Ø

8" Ø

6" Ø

"Ø

8"ø

8"ø

1. RELOCATE EXISTING 8" DUCT AND EXTEND DUCT

AS SHOWN.

2. 7"ø ROUND DUCT DOWN TO SLOT HOOD AT

PLASMA CUTTING STATION AND PLASMA TABLE.

SLOT HOOD TO EXHAUST 750 CFM. PROVIDE

MANUAL BLAST GATE. RE: DETAIL B ON SHEET

M-001. MATCH (E) PLASMA HOOD CONSTRUCTION.

SUPPORT WITH UNISTRUT FRAME MOUNTED TO

FLOOR.

3. THE OWNER WILL CONTRACT WITH A DUST

COLLECTION SYSTEM VENDOR TO PROVIDE AND

INSTALL ALL REQUIRED COMPONENTS FOR DUST

COLLECTION SYSTEM INCLUDING, BUT NOT

LIMITED TO, SPARK COOLER, DUCTWORK,

WELDING FUME HOODS, AND BLAST GATES.

4. BALANCE EF 1-4 ON ROOF ABOVE INCLUDING

EACH COLLECTION POINT, FOR NEW AIRFLOW

REQUIREMENTS. COLLECTION POINTS REQUIRE

750 CFM EA.

5. BALANCE MAU 1-2 ON ROOF ABOVE GRINDING LAB

TO UNIT MAXIMUM OF 4200 CFM. (NOT SHOWN

FOR CLARITY.)

6. OWNER WILL PROVIDE A SELF CONTAINED DUST

COLLECTION SYSTEM FOR THESE WELDING

BOOTHS. THESE WELDING BOOTHS WILL NOT BE

SERVED BY THE EXISTING DUST COLLECTION

SYSTEM.

7. CONNECT 3/4" COMPRESSED AIR LINE TO SERVE

FUME EXTRACTORS. MATCH (E) COMPRESSED AIR

PIPING CONSTRUCTION.

8. 3/8" COMPRESSED AIR DOWN TO SELF-CLEANING

FUME EXTRACTOR SUPPORT ON UNISTRUT

SUPPORT PROVIDE BY ELECTRICAL

CONTRACTOR. COORDINATE EXACT DROP

LOCATION WITH FINAL EQUIPMENT MOUNTING.

SPARK

COOLER

"Ø

CA

1/2"

11/2" CA

CA3/4"

3/ 4"

3/ 8"

C A

C A

.0

.2

1.

N R

W

JA

C

SH

EE

T

TI

TL

E:

N O

Jo b no

R

EV

IS

IO

N

D ra w n by

D at e:

D es ig ne d by

D

AT

E

BY

S:

\B

G Pr oj ec ts \9

6.

C om m un ity

C ol le ge o f D en ve r - B

N

SF

W el di ng

S tu di o

Ph as e

II\

D ra w in gs \9

3M

1.

dw g P rin te d By

: c ad d-ja c N ov em be r 0

7,

- 1 1:

am

L C

-X

XX

C O

M M

U N

IT

Y

C O

LL

EG

E O

F D

EN

VE

R

1s t S

TR

EE

T, D

EN

VE

R , C

O

LO

R

AD

O

BN

SF

W

EL

D

IN

G S

TU

D

IO

PH

AS

E

II

AL

BU

Q U

ER

Q

U E

| A

VO

N

D

EN

VE

R

FO

R T

C O

LL

IN

S

3.

8.

w w w

˛bg bu ild in gw or ks ˛co m Pr oj ec t N o.

6.

C op yr ig ht

AD

D

EN

D

U M

/0

7/

M

TR

M-101

M E

C H

A N

IC

A

L

FL

O O

R P

LA

N

SCALE:

UP

UP

UP

A

BCDEFGHI

LEVEL 1 POWER PLAN

1/8" = 1'-0"

H

1. EXISTING FIRE ALARM DEVICE TO REMAIN.

2. RECEPTACLE ON TOP OF 2" STRUCTURAL STEEL

AT TOP OF WELDING BOOTHS. REFER TO

WELDING BOOTH DIAGRAM FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

3. PROVIDE 60 AMP, 480 VOLT, 3-PHASE

RECEPTACLE TO SERVE ARC WELDER WHICH

SHALL CONSIST OF MELTIC #MB-6112 (BOX),

MELTIC #MA6 (30 DEGREE ANGLE), MELTIC

#37-64043 (RECEPTACLE). ON WELDER INSTALL

6'-0" OF 6/4 SOOW CORD AND INSTALL MELTIC

#37-68043 (PLUG) AND MELTIC #FH611 (HANDLE)

ON LOOSE END OF CORD.

4. DISCONNECT AND REMOVE FIRE ALARM

NOTIFICATION APPLIANCE. RELOCATE TO NEW

LOCATION INDICATED AND EXTEND FIRE ALARM

CABLE TO NEW LOCATION OF FIRE ALARM

NOTIFICATION APPLIANCE.

5. EXISTING EQUIPMENT TO REMAIN.

6. REFER TO NORTH WALL BRANCH CIRCUIT

SUPPORT DIAGRAM FOR ROUTING OF WELDER,

RECEPTACLE AND LIGHTING BRANCH CIRCUITS

UP TO BUILDING STRUCTURE.

7. REFER TO ISLAND POWER SUPPORT DIAGRAM

FOR SUPPORT OF RECEPTACLES, DISCONNECT

SWITCHES AND ROUTING OF BRANCH CIRCUITS

UP TO BUILDING STRUCTURE.

8. EXISTING RECEPTACLE TO REMAIN.

9. POWER TO SELF CONTAINED DUST COLLECTION

SYSTEM FOR THE NORTH WALL WELDING

BOOTHS. REFER TO NORTH WALL BRANCH

CIRCUIT SUPPORT DIAGRAM AND ELEVATION

AND NORTH WALL (SELF CONTAINED) DUST

COLLECTION SYSTEM WIRING DIAGRAM FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FLAG NOTES:

H H

H

H

H

H

HH

H

H

ALL CONDUIT 10'-0" OR LESS ABOVE FINISHED

FLOOR SHALL BE GRC. CONDUIT 10'-0" AND

GREATER ABOVE FINISHED FLOOR SHALL BE EMT.

ALL RECEPTACLES SHALL BE PROVIDED WITH

HINGED "IN-USE" COVERS.

ALL NEW CORDS FOR WELDERS SHALL BE 10'-0" IN

LENGTH.

THE NUMBER NEXT TO ELECTRICAL DEVICES

INDICATE THE CIRCUIT POSITION THAT BRANCH

CIRCUIT SHALL OCCUPY IN PANEL "WLP2" UNLESS

NOTED OTHERWISE.

ALL CONDUIT SHALL BE SURFACE MOUNTED TO

EXISTING WALLS, UNISTRUT SUPPORT, COLUMNS

AND ROOF STRUCTURE.

GENERAL NOTES:

1.

2.

EXISTING PANEL "WLP1"

EXISTING TRANSFORMER "T-WLP1"

EXISTING PANEL "WHP2"

EXISTING PANEL "MLP2"

EXISTING PANEL "MLP1"

EXISTING TRANSFORMER "T-MLP1" AND "T-MLP2"

EXISTING PANEL "MHP1 - SECTION #2"

EXISTING "MDP"

EXISTING TRANSFORMER "T-CLP1"

WALL MOUNTED 1'-0" ABOVE

ACCESSIBLE CEILING IN OFFICE

3.

EXISTING UTILITY METER

EXISTING PANEL "MHP1 - SECTION #1"

EXISTING PANEL

"CLP1"

EXISTING PANEL "WHP1"

EXISTING GROUND BUS BAR

EXISTING PANEL

"WLP2"

EXISTING PANEL

"WHP3"

4.

PROJECT SCOPE

H

5.

E-2000M

E-2000N

E-2000O

E-2000P

E-2000Q

E-2000R

E-2000S

E-2000T

E-2000U

NEW PANEL

"WHP4"

H

E-2004C

E-2004D

E-2003D

H

R 3

EXISTING WELDING

BOOTHS TO REMAIN

(TYPICAL)

E-2000V 2

E-2000W

2 6

E-2000X

E-2006A 9

E-2006B 9

E-2006C 9

E-2006D 9

E-2006E 9

E-2006F 9

E-2003C 7

WLP1-70

+48",WP1

.0

.2

1.

N R

W

JA

C

SH

EE

T

TI

TL

E:

N O

Jo b no

R

EV

IS

IO

N

D ra w n by

D at e:

D es ig ne d by

D

AT

E

BY

S:

\B

G Pr oj ec ts \9

6.

C om m un ity

C ol le ge o f D en ve r - B

N

SF

W el di ng

S tu di o

Ph as e

II\

D ra w in gs \9

3E

1.

dw g P rin te d By

: c ad d-ja c N ov em be r 0

7,

- 1 1:

am

L C

-X

XX

C O

M M

U N

IT

Y

C O

LL

EG

E O

F D

EN

VE

R

1s t S

TR

EE

T, D

EN

VE

R , C

O

LO

R

AD

O

BN

SF

W

EL

D

IN

G S

TU

D

IO

PH

AS

E

II

AL

BU

Q U

ER

Q

U E

| A

VO

N

D

EN

VE

R

FO

R T

C O

LL

IN

S

3.

8.

w w w

˛bg bu ild in gw or ks ˛co m Pr oj ec t N o.

6.

C op yr ig ht

AD

D

EN

D

U M

/0

7/

M

TR

E-101

LE

V

E L

P

O W

E R

P

LA

N

DOC
946603 (003)

File details come from the government source that posted it. Updated .