Cath Lab - Mechanical_IFC_5-20-2025.pdf

PDF 7 MB Posted

Attached to
Y1DA--Project 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC
Solicitation number
36C24525R0080
Issued by

About this file

This file is a comprehensive set of mechanical design drawings for a Cardiac Catheterization Lab renovation project at the Washington DC Veterans Affairs Medical Center. The drawings, dated 05/20/2025, detail mechanical systems for the 4th floor Cath Lab renovation, including demolition and new work plans for ductwork, piping, equipment, and control systems. The mechanical design covers multiple aspects such as air handling units, condensing units, single duct terminal units, air devices, HVAC controls, mechanical schedules, and detailed mechanical installation specifications.

The drawings include phased renovation plans (Phase 1, 2, and 3), mechanical floor plans for demolition and new work, roof plans, control diagrams, equipment schedules, and technical details for various mechanical components. Key technical elements include rooftop units, air filters, heat exchangers, steam humidifiers, cooling coils, and specific installation details for pipe hangers, duct connections, and equipment mounting. The project is fully sprinklered and involves comprehensive mechanical system upgrades for the Cardiac Catheterization Lab, with a focus on precise technical specifications and systematic renovation approach.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M001

MECHANICAL COVER SHEET

AM 45

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

ISSUED FOR CONSTRUCTION 05-20-20255

05/20/2025

1/4" = 1'-0"1

GENERAL NOTES - DEMOLITION WORK KEYED NOTES - DEMOLITION WORK

15A 14A 13A

N

Q

R

TYPICAL DEMOLITION NOTES

PARTIAL FLOOR PLAN-DEMOLITION WORK-MECHANICAL

1/4" = 1'-0"

PARTIAL ROOF PLAN-DEMOLITION WORK-MECHANICAL2

CLEAN UTILITYCORRIDOR

4A117

HAC

4A126

BREAK RM

MISCELLANEOUS

4A129B

FOYER

4A129D

PULM

PHYSIOLOGY

LAB WAITING

4A129

STRESS LAB

4A128

CATH LAB

CONTROL

CORRIDOR

4A119A

CATH LAB

OPERATING

ROOM

4A124

LAB

4A129A

4A120

MD101

FLOOR PLAN - DEMOLITION WORK -

DUCT WORK - MECHANICAL

AM 46

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

NOT TO SCALE

KEY PLAN - 4TH FLOOR

NOT TO SCALE

KEY PLAN - UPPER ROOF

FEC

FEC

FE

C

FEC

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

1/4" = 1'-0"3

GENERAL NOTES - DEMOLITION WORK

CLEAN UTILITY

4A120

CORRIDOR

4A117

HAC

4A126

BREAK RM

MISCELLANEOUS

4A129B

FOYER

4A129D

PULM

PHYSIOLOGY

LAB WAITING

4A129

STRESS LAB

4A128

CATH LAB

CONTROL

CORRIDOR

4A119A

CATH LAB

OPERATING

ROOM

4A124

LAB

4A129A

15A 14A 13A

N

Q

R

TYPICAL DEMOLITION NOTES

PARTIAL FLOOR PLAN-DEMOLITION WORK-PIPING

MECHANICAL EQUIPMENT ROOM-3

AHU

COOLING

TOWER

ELEVATOR ROOM

STAIR #6

ROOF

EXTERIOR

1/8" = 1'-0"

PARTIAL ROOF PLAN-MECHANICAL-DEMOLITION WORK-PIPING2

1/8 = 1'-0"

NOT TO SCALE

KEY PLAN-4TH FLOOR

NOT TO SCALE

KEY PLAN-UPPER ROOF

FEC

FEC

FE

C

FEC

ROOF

AHU

MECHANICAL EQUIPMENT ROOM-3

AHU

COOLING

TOWER

ELEVATOR ROOM

EXTERIOR

STAIR #6

ROOF

EXTERIOR

EXTERIOR

EXTERIOR

EXTERIOR

NOT TO SCALE

KEY PLAN-MECHANICAL ROOM AND LOWER ROOF

KEYED NOTES-DEMOLITION WORK

PARTIAL PENTHOUSE MECHANICAL FLOOR

PLAN-DEMOLITION WORK-PIPING

MD102

FLOOR PLAN - DEMOLITION WORK -

PIPING - MECHANICAL

AM 47

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

15A 14A 13A

N

Q

R

SOILED

UTILITY

4A121

EP LAB

4A122

EQUIPMENT

4A116

SCRUB

4A122A

HOUSE

KEEPING

CLOSET

4A125

CONTROL

4A128

CLEAN

SUPPLY

4A129

CIRCULATION

SPACE

NURSE

STATION /

TEAMWORK

4A120B

EQUIPMENT

4A128A

1/4" = 1'-0"1

GENERAL NOTES - NEW WORK KEYED NOTES - NEW WORK

1/4" = 1'-0"

PARTIAL ROOF PLAN-NEW WORK-MECHANICAL2

PARTIAL FLOOR PLAN-NEW WORK-MECHANICAL

PATIENT BAY

4A119A

PATIENT BAY

4A119B

CORRIDOR

4A119

HYBRID CATH

LAB

PROCEDURE

ROOM

EP LAB

CONTROL

4A120A

4A120

4A124

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

NOT TO SCALE

KEY PLAN - 4TH FLOOR

NOT TO SCALE

KEY PLAN - UPPER ROOF

FEC

FEC

FE

C

FEC

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

ISSUED FOR CONSTRUCTION 05-20-20255

05/20/2025

MH101

FLOOR PLAN - NEW WORK -

DUCT WORK - MECHANICAL

AM 48

GENERAL NOTES-DEMOLITION/NEW WORK

1/4" = 1'-0"

PARTIAL FLOOR PHASING PLAN-DEMOLITION WORK1

CLEAN UTILITY

4A120

CORRIDOR

4A117

HAC

4A126

BREAK RM

MISCELLANEOUS

4A129B

FOYER

4A129D

PULM

PHYSIOLOGY

LAB WAITING

4A129

STRESS LAB

4A128

CATH LAB

CONTROL

CORRIDOR

4A119A

CATH LAB

OPERATING

ROOM

4A124

LAB

4A129A

15A 14A 13A

N

Q

R

PHASE �1

N1 N1 N1 N2N1N1

15A 14A 13A

N

Q

R

1/4" = 1'-0"

PARTIAL FLOOR PHASING PLAN-NEW WORK2

PHASE �2

PHASE �3

PHASE �1

PHASE �2

PHASE �3

PHASING NOTES

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

NOT TO SCALE

KEY PLAN - 4TH FLOOR

NOT TO SCALE

KEY PLAN - UPPER ROOF

FEC

FEC

FE

C

FEC

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

ISSUED FOR CONSTRUCTION 05-20-20255

05/20/2025

MH102

PHASING FLOOR PLANS-

MECHANICAL

AM 49

1/4" = 1'-0"3 PARTIAL FLOOR PLAN-NEW WORK-PIPING

MECHANICAL EQUIPMENT ROOM-3

AHU

COOLING

TOWER

ELEVATOR ROOM

STAIR #6

ROOF

EXTERIOR

1/8" = 1'-0"

PARTIAL ROOF PLAN-MECHANICAL-NEW WORK-PIPING2

NOT TO SCALE

KEY PLAN-4TH FLOOR

NOT TO SCALE

KEY PLAN-UPPER ROOF

FEC

FEC

FE

C

FEC

ROOF

AHU

MECHANICAL EQUIPMENT ROOM-3

AHU

COOLING

TOWER

ELEVATOR ROOM

EXTERIOR

STAIR #6

ROOF

EXTERIOR

EXTERIOR

EXTERIOR

EXTERIOR

NOT TO SCALE

KEY PLAN-LOWER ROOF

KEYED NOTES-NEW WORK 15A 14A 13A

N

Q

R

PATIENT BAY

4A119A

HOUSE

KEEPING

CLOSET

4A125

CONTROL

4A128

PATIENT BAY

4A119B

CORRIDOR

4A119

HYBRID CATH

LAB

PROCEDURE

ROOM

EP LAB

CONTROL

4A120A

CLEAN

SUPPLY

4A129

CIRCULATION

SPACE

4A120

NURSE

STATION /

TEAMWORK

4A120B

EQUIPMENT

4A128A

GENERAL NOTES - NEW WORK

1/8 = 1'-0"

1 PARTIAL PENTHOUSE MECHANICAL FLOOR PLAN

-NEW WORK-PIPING

KEYED NOTES-NEW WORK

MP101

FLOOR PLAN - NEW WORK -

PIPING - MECHANICAL

AM 50

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

SCALE: NOT TO SCALE

1-RTU1 CONTROL DIAGRAM

SCALE: NOT TO SCALE

VARIABLE VOLUME TERMINAL

CONTROL DIAGRAM, (TYPICAL)

SCALE: NOT TO SCALE

CONSTANT VOLUME TERMINAL

CONTROL DIAGRAM, (TYPICAL)

HEATING WATER SYSTEM - CONTROL & SEQUENCE OF OPERATION

SCALE: NOT TO SCALE

SPLIT SYSTEM-CONTROL DIAGRAM

SCALE: NOT TO SCALE

HEATING WATER SYSTEM CONTROL DIAGRAM

MI101

MECHANICAL CONTROLS

AM 51

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MI102

MECHANICAL CONTROLS-

DDC POINT LIST

AM 52

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MJ101

MECHANICAL SCHEDULES

AM 53

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MJ102

MECHANICAL SCHEDULES

AM 54

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MK101

MECHANICAL DETAILS

AM 55

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MK102

AM 56

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

MK103

AM 57

95 WASHINGTON STREET, MORRISTOWN, NJ 07960

t. 973.539.5353

f. 973.539.0916

THE WOOLWORTH BUILDING

233 BROADWAY SUITE 2150, NEW YORK, NY 10279

t. 212.982.7900

f. 212.982.8111 www.nkarchitects.com

NK ARCHITECTS

STAMP

SIGNATURE:

Drawing Title

Approved: Project Director

Project Title

Issued Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS ARCHITECT/ENGINEER OF RECORD

NO. 1

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

FULLY SPRINKLERED

688-CSI-013

05/20/2025

NO: REVISION DESCRIPTION: DATE:

ART - ARCHITECTURE - ENGINEERING

2787 HILL ROAD

VIENNA, VA 22181

FRANK V. STURGEON, AIA

AMBRISH RASTOGI, PE

703.938.5226

FRANK@ADG10.COM

A DESIGN GROUP, LLC

35% SUBMISSION 01-30-2024

50 Irving St NW, Washington, DC 20422

4TH FLOOR CATH LAB

RENOVATION

AR

65% SUBMISSION 04-05-2024

95% SUBMISSION 05-31-20243

100% SUBMISSION 03-21-20254

M001 MECHANICAL COVER SHEET
Sheets and Views
M001
MD101 MECHANICAL DEMOLITION PLAN-DUCT WORK
Sheets and Views
MD101
MD102 MECHANICAL DEMOLITION PLAN-PIPING
Sheets and Views
MD102
MH101 MECHANICAL NEW WORK PLAN
Sheets and Views
MH101
MH102 MECHANICAL PHASING PLANS
Sheets and Views
MH102
MP101 MECHANICAL NEW WORK-PIPING-MECHANICAL
Sheets and Views
MP101
MI101 MECHANICAL CONTROL #1
Sheets and Views
MI101
MI102 MECHANICAL CONTROL #2
Sheets and Views
MI102
MJ101 MECHANICAL SCHEDULES #1
Sheets and Views
MJ101
MJ102 MECHANICAL SCHEDULES #2
Sheets and Views
MJ102
MK101 MECHANICAL DETAILS #1
Sheets and Views
MK101
MK102 MECHANICAL DETAILS #2
Sheets and Views
MK102
MK103 MECHANICAL DETAILS #3
Sheets and Views
MK103

File details come from the government source that posted it. Updated .