This document is a detailed submittal package for a Skytron Freedom boom system designed for the Washington DC VA Medical Center's Cardiac Catheterization Lab (Cath Lab). The package includes comprehensive technical specifications, installation requirements, and design details for a medical equipment mounting system with multiple booms and equipment mounts. The system comprises five primary mounting locations (A through E) with various configurations, including utility displays, lights with cameras, Philips displays, and X-ray equipment, all designed to be installed at a 114-inch ceiling height.
The technical documentation covers critical aspects such as structural mounting requirements, electrical specifications, medical gas connections, and communication infrastructure. Each mount has specific weight capacity and moment load specifications, with maximum fixture weights ranging from 6 to 157 pounds and moment loads between 5,539 and 6,922 foot-pounds. The package includes detailed elevation drawings, wiring diagrams, carrier details for medical gases and electrical outlets, and instructions for proper installation, emphasizing the need for precise structural mounting, electrical connections, and adherence to medical facility standards and safety regulations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev # Date/Quote Description
0 1/22/2024 Q-84017-5 Initial Preliminary Package
Drawing Package Revision SummaryEquipment References Drawing Index #
Note: Not all drawings outlined below will be required for each mount / drawing package
A (C-123395-2) B (C-123396-4) C (C-123397-1) D (C-123398-6) E (C-123401-1)
Specification for the Skytron products found within this information package are specifically designated for your facility. Please ensure that all of your custom specifications have been included. Deviating from the depicted specific equipment placement could cause equipment conflicts in the room and must be approved by a Skytron Representative.
Accepted by (Print):
Accepted by (Signature): Date:
Related Documents
· Skytron Freedom Pre-Installation Guide - TEC-H-0128
· Skytron Freedom Installation Guide - TEC-H-0106
· Skytron Freedom Booms Mounting Structure Test Jig: Instructions For Use - TEC-H-0132
· Skytron SkyVision Linx 300 Pre-Installation Manual - TEC-R-0049
· Skytron SkyVision Linx 300 Installation Manual - TEC-R-0047
· Skytron SDS Installation & Maintenance Manual - TEC-R-0020
· Skytron Ascend Pre-Installation Manual - TEC-R-0065
· Skytron Ascend Installation Manual - TEC-R-0064
PLEASE READ THE FOLLOWING CAREFULLY
EACH DRAWING MUST BE INITIALED AND DATED BY CUSTOMER
WASHINGTON DC VA
00 Room Layouts - Contains overhead view of Skytron equipment.
Elevation/Mounting Details - Contains elevation specific details for boom/light mount such as fixture weight, moment load & ceiling/floor clearances and mounting structure details of equipment.
Carrier Details - Contains carrier specific details for data, electrical & gas outlet positioning.
I have read the appropriate requirements from the Skytron Pre-Installation Guide for Freedom booms and consulted with the individual trades. I understand there are specific ceiling height, medical gas, electrical, video/communications and structural requirements that must be supplied by the appropriate trade representatives to support this project. Please be aware that modification to the site specific documents could result in additional Change Order/Drawing Change fees. These fees take place after the second Submittal Revision or the first Fabrication Revision. Please speak with your Skytron Representative if you have questions regarding these fees. All final tie-ins of electrical connections, plumbing and media must be made by a qualified and licensed individual. Skytron does not provide final tie-in services due to local licensing regulations. Finish work (e.g., caulking and trim) is the responsibility of others. Installation of standard product moldings or trim is included in the pricing provided.
_1
_2 _3 Electrical Details - Contains wiring diagram & circuit requirements for equipment booms & lights.
_4
Communication Details - Contains details for required communications cabling & connections.
Light Fixture Details - Contains details of light wiring for fixture mounts and back box details.
SK1 Integration Elevation Details - Contains elevation details for SkyVision integration systems.
SK2 Integration Mount Details - Contains mounting details for SkyVision integration systems.
BP1 Medical Gas Details - Contains medical gas details required for the riser plate installation.
BP2
Test Jig Details - Contains test jig detailsBP3
1 2/6/2024 Q-84017-6
Updated Upper Arms on A & D Updated Layout Orientation
2 3/15/2024 Q-84017-7
Updated Arm Length on Mount D Updated Light on Mount B
3 5/1/2024 Q-84017-12 Initial Submittal Package
4E D-A
-L
7'-4"
10'-5"
3'-6"
5'-4"
5'-6"
5'-6"
5'-2"
10" 2'-8"
42F-40 / 42S-40 / 42E-40
4TL-43
42A-43
4E C
-5
4T L-
42A-43
42F-40 / 42S-40 / 42E-40
4E C-
CAUTION
THIS MOUNT HAS
ROTATIONAL
CONFLICTS
4T L-3
42A-43
4E C-47
42F-40 / 42S-40 / 42E-40
27.5"
4TL-43
A-
R
EV
: 3
R O
O M
T
YP
E:
C
AT
H
L
AB
D
ES
C R
IP
TI
O N
: R O
O M
L
AY
O U
T
INITIAL:
DATE:
EQUIPMENT SCHEDULE
ID DESCRIPTION
A UTILITY / DUAL DISPLAY
B LIGHT W/CAMERA / X-RAY
C PHILIPS DISPLAY
D UTILITY
E PHILIPS DISPLAY / X-RAY / LIGHT
* IF SKYVISION IS APPLICABLE REFER TO THE
LAST PORTION OF BOOM PACKAGE*
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE, PLEASE
CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION. FINAL
CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
SHEET
W
AS
H
IN
G
TO
N D
C V
A
PR
O
JE
C T
4-
SU
BM
IT
TA
L
PL
O
T D
AT
E:
/1
/2
DIMENSIONS PROVIDED FROM WALLS ARE BASED ON CURRENT
INFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
*SITE SPECIFIC LAYOUT*
72"
0" FLOOR
114" CEILING HEIGHT41
2" 7"
54" [4EC-54]
43" [4TL-43]
9"
12"
2" [42E-40L]
19"
4UBW
60"
23"
2" [42A-43H]
19"
4FSB-2
71"
Q
TY
: 1 R
EV
: 1 R
EF
C
-1
5-
M
O D
EL
: F
SE
R
IE
S
D
ES
C R
IP
TI
O N
: E
LE
VA
TI
O N
D
ET
AI
LS
INITIAL:
DATE:
*SITE SPECIFIC ELEVATION DETAILS*
SHEET
W
AS
H
IN
G
TO
N D
C V
A
Equipment Capacity: 4UBW - 199 lbs.
4FSB-2 - 83 lbs. A1
Max Fixture Weight:
Max Moment Load:
1,188 lbs.
6,922 ft. lbs.
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure Components The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability.
Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or ateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.
Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.
Expansion Anchors (by others) Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lbs. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:
1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.
2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut. Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures.
Support Tube (by others) The support tube required to attach the Mounting Plate to the Structural Ceiling Plate is ASTM 500 Grade B, 6" outer diameter tube. Support tube is to be welded to Structural Ceiling Plate and Mounting Plate. Gussets can be used at the structural ceiling plate only, do not weld any gussets at the mounting plate.
Mounting Plate (SKYTRON supplied) The 17.5" x 17.5" x 1" ASTM A36 steel Mounting Plate is a SKYTRON supplied item. The Support Tube and sway bracing are welded to the Mounting Plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides the mounting areas for the junction box and gas riser plates.
Mounting Structure Design Seismic structural applications differ. Please contact your local SKYTRON distributor for specific calculations. The mounting structure must be designed and fabricated to position the bottom of the SKYTRON Mounting Plate as shown on site specific elevation page. This bottom of the mounting plate is a critical dimension to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more deflection than stated in section 8-3 on page 13 of the Skytron Pre-Installation Instructions (TEC-H-0128) at the mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation of the fixture.
Please contact your SKYTRON representative to schedule testing.
A Test Jig is available from SKYTRON that includes all components and documentation required for performing an approved Mounting Structure test.
refer to section 8 on page 12 of the Skytron Pre-Installation Instructions (TEC-H-0128).
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testing process is a required, documented function prior to closing of the finished ceiling.
Ceiling Requirements A 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for service access.
SKYTRON provides a ceiling cover designed to fit the ceiling cutout. Refer to section 3-1 on page 5 of the Skytron Pre-Installation Instructions
(TEC-H-0128).
45°- 60°
NOTES:
· This illustration depicts a recommended mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Do not cover or block any holes with sway bracing, gussets, weld or weld slag.
· Dimensions shown are typical unless otherwise stated. Refer to specific structural drawings and/or seismic drawings for each application.
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS*
*ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A
STRUCTURAL ENGINEER*
NOTES:
· This illustration depicts a generic mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Mounting bolts and nuts are shipped with the fixture.
12" HIGH CLEAR SPACE ABOVE MOUNTING
PLATE REQUIRED ON 3 SIDES FOR GAS AND
ELECTRICAL COMPONENT INSTALLATION
STRUCTURAL
CEILING
STRUCTURAL
CEILING
STRUCTURAL CONCRETE SLAB NORMAL WEIGHT
fc = 3,000 PSI (20,684 kPa) CEILING
SWAY BRACING
3" x 3" x 1/4" (4)
MOUNTING PLATE
(SKYTRON SUPPLIED)
FIXTURE HUB
PJP
TYP. 1/4"
ACCESS DOORS
24" x 24"
(REQUIRED)
20"
DIAMETER OPENING (REQUIRED)
(CENTERED UNDER MOUNT)
6" DIA.
SUPPORT
TUBE
TYP. 1/4"
TOP & BOTTOM
FINISHED CEILING
12" MIN. / 60" MAX.
EXPANSION ANCHORS:
HILTI KB-III (ICBO 4627)
CARBON STEEL
STRUCTURAL
CEILING PLATE
17" DIA. x 1"
REFER TO SITE SPECIFIC
ELEVATION PAGE
MOUNTING PLATE
(SKYTRON SUPPLIED)
23.6"
CEILING COVER (SKYTRON SUPPLIED)
JUNCTION BOX
MOUNTING BRACKET
JUNCTION BOX
(SKYTRON SUPPLIED)
THREADED ROD
GAS INLET
FIXTURE HUB
SWAY BRACING
SUPPORT
TUBE
GAS RISER PLATE
(MUST BE TOP MOUNTED)
*NOTE:
STRUCTURAL CEILING PLATE
(BY OTHERS) NOT SHOWN
Q
TY
: 1 R
EV
: 0 R
EF
C
-1
5-
M
O D
EL
: F
SE
R
IE
S
D
ES
C R
IP
TI
O N
: M
TG
. S
TR
U C
TU
R
E
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
A1.1
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
INSTRUMENT AIR
CARBON DIOXIDE
WAGD
VACUUM
OXYGENMEDICAL AIR
NITROGEN
NITROUS OXIDE
HELIOX
Separator Plate
*SITE SPECIFIC CARRIER DETAILS*
DE
SC
RI
PT
IO
N:
C
AR
RI
ER
D
ET
AI
LS
RE
V
Chemetron
ELECTRICAL OUTLETS:
SHEET
Q
TY
: 1
SU
BM
IT
TA
L
RE
F
C
-1
5-
PL
O
T
DA
TE
: 5
/1 /2
M O
DE
L:
F
SE
RI
ES
A2
W
AS
HI
NG
TO
N
DC
V
A
Ohmeda
GAS COLOR KEY:
CARRIER DIMENSIONS: GAS FACEPLATE STYLE:
PR
O
JE
CT
: 2
4-
Puritan
FOR A COMPLETE LIST OF ACCESSORIES
REFER TO YOUR QUOTEDATE:
DISS
INITIAL:
UP / DOWN CONTROLS
6 PORT FACEPLATE
FRONT-RIGHT VIEW
DISS
(6) 120V, 20A DUPLEX - RED
(1) 120V, 20A SIMPLEX - RED
19"H X 29"W X 21"D
Note:
Communications can only be placed to the right of the right-most separator plate
FRONT-LEFT VIEW
DESCRIPTION QTY.
WAGD 1
NITROUS OXIDE 1
MEDICAL AIR 1
OXYGEN 2
VACUUM 2
0 V
AC
, 2
0 A
MP
ARM COVERARM COVER
ARM COVER
ARM COVER
GROUND
(FOR ELECTRICAL)
PROTECTED EARTH
(FOR CHASSIS)NORMAL
DUPLEX
CRITICAL
DUPLEX
CRITICAL
DUPLEX
ULTRAFLEX
TYPE USL CONDUIT
ULTRAFLEX
TYPE USL CONDUIT
T B
TERMINAL
BLOCK
DETAIL
120VAC, 20A
SUPPLY
T B
LOW VOLTAGE
CONTROL CABLE
UP/DOWN CONTROL BUTTONS
PUMP ENCLOSURE
(REFER TO INSTALL MANUAL
FOR WIRING DIAGRAM)
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR POWERED HEIGHT ADJUSTABLE ARMS
U P
D
O W
N C
O N
TR
O
L
0 V
AC
, 2 0 A
MP
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
T B
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
T B
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
T B
C
IR
C U
IT
C
IR
C U
IT
EL
EV
AT
IO
N E
LE
C
TR
IC
AL
E
N C
LO
SU
R E
BO
X
(8 "L
X
"H X
"D
M O
U N
TE
D
B Y
O
TH
E R
S)
PU
M
P D
R
AW
2.
5A
M P, VA
C
H
Z, PH
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.
The configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all fixture wiring and electrical materials for connection from the fixture to the facility provided supply.
SKYTRON supplies an electrical junction box to facilitate field wiring, with an optional partition for critical and normal power (if applicable), for up to six circuits to be mounted on the mounting plate in the correct position.
If the boom is equipped with the Active Assist system, it will require either a separate circuit (120V, 0.5A draw) OR if tied into another circuit, a DPST disconnect switch to isolate it, should service be required.
If a motorized height adjustable arm is utilized, a SKYTRON provided enclosure/junction box (101 4"L x 81
4"W x 4"H) must be remotely mounted within 24" of the mounting structure (by the contractor). Either this remote enclosure will require a separate circuit (120V 2.5A draw) OR if tied into another circuit, it will require a DPST disconnect switch to isolate it, should service be required.
Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit.
Any electrical material and labor required for connection to the SKYTRON fixture and or electrical enclosure is to be provided by the contractor or customer. All wiring and materials are to be in accordance with federal, state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area based on the customer specific drawing.
(1) 120V, 20A, SIMPLEX OUTLET - RED
(6) 120V, 20A, DUPLEX OUTLETS - RED
MOUNTING HUB
Internally Located Electrical Terminal
Block Detail
120VAC, 20A
SUPPLY
carrier contains an internally located
Terminal Block that provides interconnectivity between the outlets and the internal conductors
OUTLETS
FLATSCREEN
BRACKET
MOUNTING HUB
AC
TI
VE
A
SS
IS
T
SY
ST
EM
V, .5
A
SEPARATE CIRCUIT
OR MEANS OF
DISCONNECT
REQUIRED 4FSB-2
0 V
AC
, 2
0 A
MP
4UBW
V
FE
M
AL
E
(F O
R M
O N
IT
O
R
0 V
AC
, 2
0 A
MP
Fi na l l oc at io n of p ow er br ic k(
s) a nd c irc ui t t o be w ith in
0' o f b oo m m ou nt (D et er m in ed b y O th er
s) C
IR
C
U
IT
COMPACT
UTILITY BOX
Q
TY
: 1 R
EV
: 0 R
EF
C
-1
5-
M
O D
EL
: F
SE
R
IE
S
D
ES
C R
IP
TI
O N
: E
LE
C
TR
IC
AL
D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
*SITE SPECIFIC WIRING DETAILS*
INTERNAL FIXTURE WIRING TYPICAL, ELECTRI-FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
ISOLATED POWER
BROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE A3
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
114" CEILING HEIGHT
2"
65" 54" [4ED-65]
7"
2" [4TL-36]
23"
2" [42A-43L]
19"
3"
50001-A
41"
4ED HOLE COVER
40-0357-00-0
REFER TO AUA5 DATA SHEET
FOR SURGICAL LIGHT
SPECIFICATIONS
43"
12"
CAMERA
READY
80"
Q
TY
: 1 R
EV
: 1 R
EF
: C -1
6-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
VA
TI
O
N D
ET
AI
LS
INITIAL:
DATE:
*SITE SPECIFIC ELEVATION DETAILS*
SHEET
W
AS
H
IN
G
TO
N D
C V
A
Max Fixture Weight:
Max Moment Load:
Equipment Capacity: X-RAY 50001-A - 5 lbs.
B1 1,188 lbs.
6,645 ft. lbs.
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability.
Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or ateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.
Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.
Expansion Anchors (by others) Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lbs. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:
1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.
2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut. Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures.
Support Tube (by others) The support tube required to attach the Mounting Plate to the Structural Ceiling Plate is ASTM 500 Grade B, 6" outer diameter tube. Support tube is to be welded to Structural Ceiling Plate and Mounting Plate. Gussets can be used at the structural ceiling plate only, do not weld any gussets at the mounting plate.
Mounting Plate (SKYTRON supplied) The 17.5" x 17.5" x 1" ASTM A36 steel Mounting Plate is a SKYTRON supplied item. The Support Tube and sway bracing are welded to the Mounting Plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides the mounting areas for the junction box and gas riser plates.
Mounting Structure Design Seismic structural applications differ. Please contact your local SKYTRON distributor for specific calculations. The mounting structure must be designed and fabricated to position the bottom of the SKYTRON Mounting Plate as shown on site specific elevation page. This bottom of the mounting plate is a critical dimension to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more deflection than stated in section 8-3 on page 13 of the Skytron Pre-Installation Instructions (TEC-H-0128) at the mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation of the fixture.
Please contact your SKYTRON representative to schedule testing.
A Test Jig is available from SKYTRON that includes all components and documentation required for performing an approved Mounting Structure test.
refer to section 8 on page 12 of the Skytron Pre-Installation Instructions (TEC-H-0128).
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testing process is a required, documented function prior to closing of the finished ceiling.
Ceiling Requirements A 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for service access.
SKYTRON provides a ceiling cover designed to fit the ceiling cutout. Refer to section 3-1 on page 5 of the Skytron Pre-Installation Instructions
(TEC-H-0128).
45°- 60°
NOTES:
· This illustration depicts a recommended mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Do not cover or block any holes with sway bracing, gussets, weld or weld slag.
· Dimensions shown are typical unless otherwise stated. Refer to specific structural drawings and/or seismic drawings for each application.
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS*
*ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A
STRUCTURAL ENGINEER*
NOTES:
· This illustration depicts a generic mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Mounting bolts and nuts are shipped with the fixture.
12" HIGH CLEAR SPACE ABOVE MOUNTING
PLATE REQUIRED ON 3 SIDES FOR GAS AND
ELECTRICAL COMPONENT INSTALLATION
STRUCTURAL
CEILING
STRUCTURAL
CEILING
STRUCTURAL CONCRETE SLAB NORMAL WEIGHT
fc = 3,000 PSI (20,684 kPa) CEILING
SWAY BRACING
3" x 3" x 1/4" (4)
MOUNTING PLATE
(SKYTRON SUPPLIED)
FIXTURE HUB
PJP
TYP. 1/4"
ACCESS DOORS
24" x 24"
(REQUIRED)
20"
DIAMETER OPENING (REQUIRED)
(CENTERED UNDER MOUNT)
6" DIA.
SUPPORT
TUBE
TYP. 1/4"
TOP & BOTTOM
FINISHED CEILING
12" MIN. / 60" MAX.
EXPANSION ANCHORS:
HILTI KB-III (ICBO 4627)
CARBON STEEL
STRUCTURAL
CEILING PLATE
17" DIA. x 1"
REFER TO SITE SPECIFIC
ELEVATION PAGE
MOUNTING PLATE
(SKYTRON SUPPLIED)
23.6"
CEILING COVER (SKYTRON SUPPLIED)
JUNCTION BOX
MOUNTING BRACKET
JUNCTION BOX
(SKYTRON SUPPLIED)
THREADED ROD
GAS INLET
FIXTURE HUB
SWAY BRACING
SUPPORT
TUBE
GAS RISER PLATE
(MUST BE TOP MOUNTED)
*NOTE:
STRUCTURAL CEILING PLATE
(BY OTHERS) NOT SHOWN
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
6-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : M
TG
. S
TR
U
C
TU
R E
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
B1.1
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
ARM COVERARM COVER
ARM COVER
ARM COVER
GROUND
(FOR ELECTRICAL)
PROTECTED EARTH
(FOR CHASSIS)NORMAL
DUPLEX
CRITICAL
DUPLEX
CRITICAL
DUPLEX
ULTRAFLEX
TYPE USL CONDUIT
ULTRAFLEX
TYPE USL CONDUIT
T B
TERMINAL
BLOCK
DETAIL
120VAC, 20A
SUPPLY
T B
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED / SPRING ARMSELECTRICAL REQUIREMENTS - Electrical Engineer
Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.
The configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all fixture wiring and electrical materials for connection from the fixture to the facility provided supply.
SKYTRON supplies an electrical junction box to facilitate field wiring, with an optional partition for critical and normal power (if applicable), for up to six circuits to be mounted on the mounting plate in the correct position.
If the boom is equipped with the Active Assist system, it will require either a separate circuit (120V, 0.5A draw) OR if tied into another circuit, a DPST disconnect switch to isolate it, should service be required.
If a motorized height adjustable arm is utilized, a SKYTRON provided enclosure/junction box (101 4"L x 81
4"W x 4"H) must be remotely mounted within 24" of the mounting structure (by the contractor). Either this remote enclosure will require a separate circuit (120V 2.5A draw) OR if tied into another circuit, it will require a DPST disconnect switch to isolate it, should service be required.
Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit.
Any electrical material and labor required for connection to the SKYTRON fixture and or electrical enclosure is to be provided by the contractor or customer. All wiring and materials are to be in accordance with federal, state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area based on the customer specific drawing.
N/A X-RAY 50001-A
MOUNTING HUB MOUNTING HUB
AC
TI
VE
A
SS
IS
T
SY
ST
EM
V, .5
A
SEPARATE CIRCUIT
OR MEANS OF
DISCONNECT
REQUIRED
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
C
IR
C U
IT
0 V
AC
, 1
5 A
MP
AU
RO
RA
L
IG
HT
LI
GH
T
CI
RC
UI
T
TO
W
AL
L
CO
NT
RO
L
SE
E
PA
GE
X-RAY
SHIELD
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
6-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
C
TR
IC
AL
D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
*SITE SPECIFIC WIRING DETAILS*
INTERNAL FIXTURE WIRING TYPICAL, ELECTRI-FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
ISOLATED POWER
BROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE B3
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
Boom w/Aurora 4 Camera Lights
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. - Flexible conduit to extend 18" (457mm) below finished ceiling. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring
2. Grounding - Proper performance and safety of this fixture can only be achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electrical interference generated by other devices.
Protective means - To avoid the risks of electrical shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly protected, appropriately sized, dedicated circuit. An Isolated power supply circuit must protected by an appropriately sized double pole, single throw circuit breaker.
3. Optional Camera Ready Lighthead - The optional camera ready lighthead system includes a connector faceplate with a 65' (20m) cable that connects to the light fixture junction box. The faceplate is mounted in a 2" x 4" (51mm x 102mm) junction box and the cable is run through a 1"(25mm) metal conduit to the light fixture junction box.. D-sub 9-pin connectors are provided for a cable connection at the fixture junction box and at the RAA/VST connection point.
3/4" METAL CONDUIT 12AWG,
3 WIRES PER LIGHTHEAD PLUS FIXTURE GROUND
RED, GREEN, WHITE, BLUE 30VDC OUTPUT
3/4" METAL CONDUIT 100-240VAC INPUT DEDICATEDWALL CONTROL
(SKYTRON SUPPLIED)
TO BE MOUNTED NEAR
ENTRANCE DOOR OR AT NDC
BY SKYTRON
BY OTHERS
TYPE USL CONDUIT
(SKYTRON SUPPLIED)
SEE NOTE 1JUNCTION BOX (BY OTHERS)
WITHIN 12" OF MOUNT
CAMERA
1" METAL CONDUIT FOR
OPTIONAL CAMERA SYSTEM
CONTROL
(SUPPLIED BY OTHERS)
65' CAMERA CONTROL CABLE
(SKYTRON SUPPLIED)
CAMERA CONTROL JUNCTION BOX
(2" X 4" SUPPLIED BY OTHERS)
TYPICAL LOCATION:
· NURSE DOCUMENTATION CENTER
· CABINET
· SHELF
3/4" METAL CONDUIT
TO RS232C CONTROL
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
6-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : L
IG
H
TI
N
G D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY.
THIS WILL NOT MATCH YOUR EXACT MODEL.
B4
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
GENERIC WALL CONTROL MOUNTING DETAILS WALL CONTROL REQUIREMENTS
3/4" metal conduit and minimum 12AWG wire (3 wires per lighthead plus fixture ground) is required between wall control and fixture. Flexible conduit should extend 18" below finished ceiling.
Separate dedicated conduit required for 100-240VAC supply lines to wall control. All wiring to be in accordance with local, state and national electrical codes.
Room placement of the wall control will vary by application. Always follow current standards from the NFPA (National Fire Protection Agency). NEC (National Electrical Code) and IEC (International Electrotechnical Commission) for proper compliance.
The selection of anchorage fasteners shall be determined by the engineer of record and will vary by application. The selected fasteners must not interfere with wall control components. Seismic applications require the use of approved fasteners.
WALL CONTROL WEIGHT
SINGLE - 25lbs DUAL/TRIPLE - 30lbs
OPTIONAL BACK-BOX INSTALLATION
C
A D
E
RECESSED MOUNT SURFACE MOUNT
F B
SIDE VIEW BACK VIEW
SINGLE/DUAL
8-5/8" (220mm)
4" (100mm) 10-5/8" (270mm) 6-7/8" (175mm) 7-5/8" (195mm)
6" (153mm) 10" (255mm)
7-7/8" (200mm) 11-3/4” (298mm) 13-7/8” (353mm)
10-1/4” (260mm)
J 17-1/4” (438mm)
TRIPLE
F
D
10-5/8" (270mm)
12-1/4” (310mm) 12-3/8” (315mm)
B
I
14" (355mm) 8-5/8" (220mm)
10" (253mm)
11" (280mm) 6-3/8" (162mm)
4" (100mm)
G H
C
A
13-3/4” (348mm)
L
13-1/2" (343mm)
K 15-3/4” (400mm)
E
K
I
L
H
G
J
DIMENSIONS
RECESS MOUNT FLANGE COVERAGE
SINGLE/DUAL 11 3 4"W x 14" H (298mm W x 356mm H) TRIPLE 13 3 4"W X 17 14"H (349mm W x 438mm H)
CONTROL BOX WITH RECESS
MOUNT FLANGE INSTALLED
*CONDUIT AND MOUNTING HARDWARE
PROVIDED BY OTHER BASED ON APPLICATION
SCREW (4)*
NOTE:
FRONT EDGE OF BACK-BOX MUST BE
FLUSH WITH FINISHED WALL SURFACE
SCREW
(A/R)*
STUD
FINISHED WALL
100 - 240 VAC INPUT
30 VDC OUTPUT
3/4" (19mm) CONDUIT*
CONDUIT CONNECTOR*
SINGLE/DUAL BACK-BOX
8 12"W x 11 5 8"H x 4"D
(215mmW x 295mmH x 103mmD)
TRIPLE BACK-BOX
10 12"W x 14 12"H x 4"D (269mmW x 369mmH x 103mmD)
(4) SCREW
(4) ANCHOR
JUNCTION BOX
RECESS MOUNT FLANGE
FRONT PANEL
1" (25mm) 1 7 8" (48mm)
FRONT PANEL
(4) SCREW
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
6-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : W
AL
L
C
TR
L.
D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
B4.1
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
114" CEILING HEIGHT41
2" 7"
54" [4EC-54]
9"
12"
2" [42E-40H]
19"
FRAME PROVIDED BY PHILIPS
55"
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
7-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
VA
TI
O
N D
ET
AI
LS
INITIAL:
DATE:
*SITE SPECIFIC ELEVATION DETAILS*
SHEET
W
AS
H
IN
G
TO
N D
C V
A
Equipment Capacity: 4MCS-PHILIPS - 157 lbs.
C1 Max Fixture Weight:
Max Moment Load:
990 lbs.
5,539 ft. lbs.
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability.
Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or ateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.
Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.
Expansion Anchors (by others) Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lbs. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:
1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.
2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut. Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures.
Support Tube (by others) The support tube required to attach the Mounting Plate to the Structural Ceiling Plate is ASTM 500 Grade B, 6" outer diameter tube. Support tube is to be welded to Structural Ceiling Plate and Mounting Plate. Gussets can be used at the structural ceiling plate only, do not weld any gussets at the mounting plate.
Mounting Plate (SKYTRON supplied) The 17.5" x 17.5" x 1" ASTM A36 steel Mounting Plate is a SKYTRON supplied item. The Support Tube and sway bracing are welded to the Mounting Plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides the mounting areas for the junction box and gas riser plates.
Mounting Structure Design Seismic structural applications differ. Please contact your local SKYTRON distributor for specific calculations. The mounting structure must be designed and fabricated to position the bottom of the SKYTRON Mounting Plate as shown on site specific elevation page. This bottom of the mounting plate is a critical dimension to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more deflection than stated in section 8-3 on page 13 of the Skytron Pre-Installation Instructions (TEC-H-0128) at the mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation of the fixture.
Please contact your SKYTRON representative to schedule testing.
A Test Jig is available from SKYTRON that includes all components and documentation required for performing an approved Mounting Structure test.
refer to section 8 on page 12 of the Skytron Pre-Installation Instructions (TEC-H-0128).
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testing process is a required, documented function prior to closing of the finished ceiling.
Ceiling Requirements A 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for service access.
SKYTRON provides a ceiling cover designed to fit the ceiling cutout. Refer to section 3-1 on page 5 of the Skytron Pre-Installation Instructions
(TEC-H-0128).
45°- 60°
NOTES:
· This illustration depicts a recommended mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Do not cover or block any holes with sway bracing, gussets, weld or weld slag.
· Dimensions shown are typical unless otherwise stated. Refer to specific structural drawings and/or seismic drawings for each application.
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS*
*ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A
STRUCTURAL ENGINEER*
NOTES:
· This illustration depicts a generic mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Mounting bolts and nuts are shipped with the fixture.
12" HIGH CLEAR SPACE ABOVE MOUNTING
PLATE REQUIRED ON 3 SIDES FOR GAS AND
ELECTRICAL COMPONENT INSTALLATION
STRUCTURAL
CEILING
STRUCTURAL
CEILING
STRUCTURAL CONCRETE SLAB NORMAL WEIGHT
fc = 3,000 PSI (20,684 kPa) CEILING
SWAY BRACING
3" x 3" x 1/4" (4)
MOUNTING PLATE
(SKYTRON SUPPLIED)
FIXTURE HUB
PJP
TYP. 1/4"
ACCESS DOORS
24" x 24"
(REQUIRED)
20"
DIAMETER OPENING (REQUIRED)
(CENTERED UNDER MOUNT)
6" DIA.
SUPPORT
TUBE
TYP. 1/4"
TOP & BOTTOM
FINISHED CEILING
12" MIN. / 60" MAX.
EXPANSION ANCHORS:
HILTI KB-III (ICBO 4627)
CARBON STEEL
STRUCTURAL
CEILING PLATE
17" DIA. x 1"
REFER TO SITE SPECIFIC
ELEVATION PAGE
MOUNTING PLATE
(SKYTRON SUPPLIED)
23.6"
CEILING COVER (SKYTRON SUPPLIED)
JUNCTION BOX
MOUNTING BRACKET
JUNCTION BOX
(SKYTRON SUPPLIED)
THREADED ROD
GAS INLET
FIXTURE HUB
SWAY BRACING
SUPPORT
TUBE
GAS RISER PLATE
(MUST BE TOP MOUNTED)
*NOTE:
STRUCTURAL CEILING PLATE
(BY OTHERS) NOT SHOWN
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
7-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : M
TG
. S
TR
U
C
TU
R E
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
C1.1
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
ARM COVER
GROUND
(FOR ELECTRICAL)
PROTECTED EARTH
(FOR CHASSIS)NORMAL
DUPLEX
CRITICAL
DUPLEX
CRITICAL
DUPLEX
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR POWERED HEIGHT ADJUSTABLE ARMS
ULTRAFLEX
TYPE USL CONDUIT
ULTRAFLEX
TYPE USL CONDUIT
T B
TERMINAL
BLOCK
DETAIL
120VAC, 20A
SUPPLY
T B
LOW VOLTAGE
CONTROL CABLE
UP/DOWN CONTROL BUTTONS
PUMP ENCLOSURE
(REFER TO INSTALL MANUAL
FOR WIRING DIAGRAM)
PHILIPS
LARGE
DISPLAY
U P
D
O W
N C
O N
TR
O
L
EL
EV
AT
IO
N E
LE
C
TR
IC
AL
E
N C
LO
SU
R E
BO
X
(8 "L
X
"H X
"D
M O
U N
TE
D
B Y
O
TH
E R
S)
PU
M
P D
R
AW
2.
5A
M P, VA
C
H
Z, PH
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.
The configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all fixture wiring and electrical materials for connection from the fixture to the facility provided supply.
SKYTRON supplies an electrical junction box to facilitate field wiring, with an optional partition for critical and normal power (if applicable), for up to six circuits to be mounted on the mounting plate in the correct position.
If the boom is equipped with the Active Assist system, it will require either a separate circuit (120V, 0.5A draw) OR if tied into another circuit, a DPST disconnect switch to isolate it, should service be required.
If a motorized height adjustable arm is utilized, a SKYTRON provided enclosure/junction box (101 4"L x 81
4"W x 4"H) must be remotely mounted within 24" of the mounting structure (by the contractor). Either this remote enclosure will require a separate circuit (120V 2.5A draw) OR if tied into another circuit, it will require a DPST disconnect switch to isolate it, should service be required.
Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit.
Any electrical material and labor required for connection to the SKYTRON fixture and or electrical enclosure is to be provided by the contractor or customer. All wiring and materials are to be in accordance with federal, state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area based on the customer specific drawing.
MOUNTING HUB
Internally Located Electrical Terminal
Block Detail
120VAC, 20A
SUPPLY
carrier contains an internally located
Terminal Block that provides interconnectivity between the outlets and the internal conductors
AC
TI
VE
A
SS
IS
T
SY
ST
EM
V, .5 A
SEPARATE CIRCUIT
OR MEANS OF
DISCONNECT
REQUIRED
0 V
AC
, 2
0 A
MP
4MCS-PHILIPS
V
FE
M
AL
E
(F O
R M
O N
IT
O
R
0 V
AC
, 2
0 A
MP
Fi na l l oc at io n of p ow er br ic k(
s) a nd c irc ui t t o be w ith in
0' o f b oo m m ou nt (D et er m in ed b y O th er
s) C
IR
C
U
IT
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
7-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
C
TR
IC
AL
D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
*SITE SPECIFIC WIRING DETAILS*
INTERNAL FIXTURE WIRING TYPICAL, ELECTRI-FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
ISOLATED POWER
BROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE C3
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
114" CEILING HEIGHT7"
2" [4TL-43]
5"
23"
2" [42A-43L]
13"
12"
4UBC
73"
Q
TY
: 1 R
EV
: 3 R
EF
: C -1
8-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
VA
TI
O
N D
ET
AI
LS
INITIAL:
DATE:
*SITE SPECIFIC ELEVATION DETAILS*
SHEET
W
AS
H
IN
G
TO
N D
C V
A
Equipment Capacity: 4UBC - 6 lbs.
D1 Max Fixture Weight:
Max Moment Load:
990 lbs.
5,539 ft. lbs.
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability.
Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or ateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.
Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.
Expansion Anchors (by others) Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lbs. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:
1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.
2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut. Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures.
Support Tube (by others) The support tube required to attach the Mounting Plate to the Structural Ceiling Plate is ASTM 500 Grade B, 6" outer diameter tube. Support tube is to be welded to Structural Ceiling Plate and Mounting Plate. Gussets can be used at the structural ceiling plate only, do not weld any gussets at the mounting plate.
Mounting Plate (SKYTRON supplied) The 17.5" x 17.5" x 1" ASTM A36 steel Mounting Plate is a SKYTRON supplied item. The Support Tube and sway bracing are welded to the Mounting Plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides the mounting areas for the junction box and gas riser plates.
Mounting Structure Design Seismic structural applications differ. Please contact your local SKYTRON distributor for specific calculations. The mounting structure must be designed and fabricated to position the bottom of the SKYTRON Mounting Plate as shown on site specific elevation page. This bottom of the mounting plate is a critical dimension to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more deflection than stated in section 8-3 on page 13 of the Skytron Pre-Installation Instructions (TEC-H-0128) at the mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation of the fixture.
Please contact your SKYTRON representative to schedule testing.
A Test Jig is available from SKYTRON that includes all components and documentation required for performing an approved Mounting Structure test.
refer to section 8 on page 12 of the Skytron Pre-Installation Instructions (TEC-H-0128).
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testing process is a required, documented function prior to closing of the finished ceiling.
Ceiling Requirements A 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for service access.
SKYTRON provides a ceiling cover designed to fit the ceiling cutout. Refer to section 3-1 on page 5 of the Skytron Pre-Installation Instructions
(TEC-H-0128).
45°- 60°
NOTES:
· This illustration depicts a recommended mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Do not cover or block any holes with sway bracing, gussets, weld or weld slag.
· Dimensions shown are typical unless otherwise stated. Refer to specific structural drawings and/or seismic drawings for each application.
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS*
*ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A
STRUCTURAL ENGINEER*
NOTES:
· This illustration depicts a generic mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer.
· Mounting bolts and nuts are shipped with the fixture.
12" HIGH CLEAR SPACE ABOVE MOUNTING
PLATE REQUIRED ON 3 SIDES FOR GAS AND
ELECTRICAL COMPONENT INSTALLATION
STRUCTURAL
CEILING
STRUCTURAL
CEILING
STRUCTURAL CONCRETE SLAB NORMAL WEIGHT
fc = 3,000 PSI (20,684 kPa) CEILING
SWAY BRACING
3" x 3" x 1/4" (4)
MOUNTING PLATE
(SKYTRON SUPPLIED)
FIXTURE HUB
PJP
TYP. 1/4"
ACCESS DOORS
24" x 24"
(REQUIRED)
20"
DIAMETER OPENING (REQUIRED)
(CENTERED UNDER MOUNT)
6" DIA.
SUPPORT
TUBE
TYP. 1/4"
TOP & BOTTOM
FINISHED CEILING
12" MIN. / 60" MAX.
EXPANSION ANCHORS:
HILTI KB-III (ICBO 4627)
CARBON STEEL
STRUCTURAL
CEILING PLATE
17" DIA. x 1"
REFER TO SITE SPECIFIC
ELEVATION PAGE
MOUNTING PLATE
(SKYTRON SUPPLIED)
23.6"
CEILING COVER (SKYTRON SUPPLIED)
JUNCTION BOX
MOUNTING BRACKET
JUNCTION BOX
(SKYTRON SUPPLIED)
THREADED ROD
GAS INLET
FIXTURE HUB
SWAY BRACING
SUPPORT
TUBE
GAS RISER PLATE
(MUST BE TOP MOUNTED)
*NOTE:
STRUCTURAL CEILING PLATE
(BY OTHERS) NOT SHOWN
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
8-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : M
TG
. S
TR
U
C
TU
R E
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
D1.1
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
INSTRUMENT AIR
CARBON DIOXIDE
WAGD
VACUUM
OXYGENMEDICAL AIR
NITROGEN
NITROUS OXIDE
HELIOX
Separator Plate
*SITE SPECIFIC CARRIER DETAILS*
ELECTRICAL OUTLETS:
SU
BM
IT
TA
L W
AS
HI
NG
TO
N
DC
V A
DE
SC
RI
PT
IO
N:
C
AR
RI
ER
D
ET
AI
LS
M O
DE
L:
F
SE
RI
ES
Q
TY
: 1
RE
V
RE
F
C
-1
8-
D2
Puritan
SHEET
Chemetron Ohmeda
PL
O
T
DA
TE
: 5
/1 /2
GAS COLOR KEY:
CARRIER DIMENSIONS: GAS FACEPLATE STYLE:
PR
O
JE
CT
: 2
4-
FOR A COMPLETE LIST OF ACCESSORIES
REFER TO YOUR QUOTEDATE:
DISS
INITIAL:
GAS VIEW
be placed to the right of the right-most separator plate
Note:
Communications can only
ELECTRICAL/COMMUNICATIONS VIEW
N/A
(4) 120V, 20A DUPLEX - RED
8"H X 22"W X 11"D
(2) RJ45 (NO CABLE)
ARM COVER
GROUND
(FOR ELECTRICAL)
PROTECTED EARTH
(FOR CHASSIS)NORMAL
DUPLEX
CRITICAL
DUPLEX
CRITICAL
DUPLEX
ULTRAFLEX
TYPE USL CONDUIT
ULTRAFLEX
TYPE USL CONDUIT
T B
TERMINAL
BLOCK
DETAIL
120VAC, 20A
SUPPLY
T B
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
T B
0 V
AC
, 2
0 A
MP
C
IR
C U
IT
T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.
The configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all fixture wiring and electrical materials for connection from the fixture to the facility provided supply.
SKYTRON supplies an electrical junction box to facilitate field wiring, with an optional partition for critical and normal power (if applicable), for up to six circuits to be mounted on the mounting plate in the correct position.
If the boom is equipped with the Active Assist system, it will require either a separate circuit (120V, 0.5A draw) OR if tied into another circuit, a DPST disconnect switch to isolate it, should service be required.
If a motorized height adjustable arm is utilized, a SKYTRON provided enclosure/junction box (101 4"L x 81
4"W x 4"H) must be remotely mounted within 24" of the mounting structure (by the contractor). Either this remote enclosure will require a separate circuit (120V 2.5A draw) OR if tied into another circuit, it will require a DPST disconnect switch to isolate it, should service be required.
Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit.
Any electrical material and labor required for connection to the SKYTRON fixture and or electrical enclosure is to be provided by the contractor or customer. All wiring and materials are to be in accordance with federal, state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area based on the customer specific drawing.
(4) 120V, 20A, DUPLEX OUTLETS - RED
MOUNTING HUB
4UBC
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
COMPACT
UTILITY BOX
Internally Located Electrical Terminal
Block Detail
120VAC, 20A
SUPPLY
carrier contains an internally located
Terminal Block that provides interconnectivity between the outlets and the internal conductors
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
8-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
C
TR
IC
AL
D
ET
AI
LS
INITIAL:
DATE:
SHEET
W
AS
H
IN
G
TO
N D
C V
A
*SITE SPECIFIC WIRING DETAILS*
INTERNAL FIXTURE WIRING TYPICAL, ELECTRI-FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
ISOLATED POWER
BROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE D3
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
114" CEILING HEIGHT41
2" 7"
47" [4EC-47]
2" [4TL-36]
9"
12"
2" [42E-40H]
19"
FRAME PROVIDED BY PHILIPS
55"
23"
2" [42A-43L]
19"
50001-A
44"
REFER TO AUA5 DATA SHEET
FOR SURGICAL LIGHT
SPECIFICATIONS
2"
8"
80"
Q
TY
: 1 R
EV
: 0 R
EF
: C -1
1-
M O
D
EL
: F
SE
R
IE
S D
ES
C
R
IP
TI
O
N : E
LE
VA
TI
O
N D
ET
AI
LS
INITIAL:
DATE:
*SITE SPECIFIC ELEVATION DETAILS*
SHEET
W
AS
H
IN
G
TO
N D
C V
A
Equipment Capacity: 4MCS-PHILIPS - 157 lbs.
X-RAY 50001-A - 6 lbs. E1
Max Fixture Weight:
Max Moment Load:
1,188 lbs.
6,922 ft. lbs.
PR
O
JE
C
T
4-
SU
BM
IT
TA
L
PL
O T
D
AT
E:
/1 /2
The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability.
Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or ateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.
Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.
Expansion Anchors (by others) Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lbs. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:
1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.
2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut. Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .