Categorical Exclusion Form (NEPA).pdf
PDF 334 KB Posted
- Solicitation number
- 693C73-26-B-000003
About this file
This is a NEPA (National Environmental Policy Act) Categorical Exclusion Form for a pavement preservation project on the Blue Ridge Parkway in Virginia. The project will take place from Mile Post 143.11-174.60 and involves applying pavement preservation treatments including chip seal, fog seal, patching, and crack cleaning and sealing. The work will be completed in four schedules during Fiscal Year 2025, with the goal of extending the pavement's life by 5 to 10 years.
Key environmental commitments include inspecting the site for threatened and endangered species, limiting disturbance to previously disturbed areas, using water-borne paint for markings, and ensuring no significant ground disturbance occurs. The project has been reviewed for compliance with various environmental regulations, including the Endangered Species Act and National Historic Preservation Act. The federally-listed species in the area include Indiana Bat, Northern Long-eared Bat, Green Floater, Mitchell's Satyr Butterfly, and Monarch Butterfly. The project is categorically excluded from further environmental analysis and will be conducted by the Eastern Federal Lands Highway Division of the Federal Highway Administration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
NP BLRI PVT PRES FY25(1)
Eastern Federal Lands Highway Division NEPA Categorical Exclusion Form
Project Number: NP BLRI PVT PRES FY25(1) Date: 7/18/2025
Project Name: Pavement Preservation Program – Treat Mainline Motor Road (FY17-FY27)
Location: National Park Service, Blue Ridge Parkway Floyd, Franklin, and Patrick Counties, Virginia
CE Category 23 CFR 771.117(c)(22): Projects, as defined in 23 U.S.C. 101, that would take place entirely within the existing operational right-of-way [...]
See 23 CFR 771.117 for full description of CE categories, including additional requirements when applying (c)26-28.
Project Description This is a Blue Ridge Parkway (BLRI) Pavement Preservation project in Virginia from MP 143.11-174.60. Upon completion of this project, the new surface treatment is expected to extend the life of the pavement by 5 to 10 years. The project will be split into four schedules.
The intent of the project is to apply pavement preservation treatment using chip seal and fog seal, patching, and crack cleaning and sealing. Pavement markings and other misc. work will also occur. Work will not include drainage repairs, shoulder work, sign replacements, or new guardrail installation. No tree/vegetation removal or significant ground disturbance will occur.
No nighttime work is authorized. No permits are required.
Environmental Commitments and Mitigation Measures
• Although there is no surface evidence of archeological resources, clearance to proceed is recommended with the condition that if concealed archeological resources are encountered during project activities, all necessary steps will be taken to protect them and the Park Cultural Resources Manager will be notified immediately.
• Once scheduled, each project site shall be inspected for T&E species immediately prior to work at this site by the Natural Resource Management Specialist. It is up to the project leader to notify the local Natural Resource Management Specialist within 60 days of project start to ensure that schedules can be accommodated.
• Disturbance shall be limited to open and previously disturbed areas.
• Thin lift asphalt shall be applied, wherever practical and economically feasible.
• Brooming of the chip seal surface shall be complete by the end of the work day so that there is no significant aggregate remaining on the paved surface as determined by the CO.
• Paint used for centerline striping shall be a water-borne. No unmarked pavement shall be left overnight.
https://www.ecfr.gov/cgi-bin/text-idx?SID=842bb87055f89f1d0ff242f2b9e20ff7&mc=true&node=pt23.1.771&rgn=div5#se23.1.771_1117
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
• Work shall only be permitted between the times of 30 minutes after sunrise to 30 minutes before sunset.
• Construction vehicles/equipment shall enter the Blue Ridge Parkway at the point of access nearest the work site.
• Staging and parking for vehicles, equipment and materials shall be confined to paved overlooks and parking areas. Other areas utilized shall be only as designated approved by the CO and local Resource Management Specialist. Overlooks that serve as trailhead parking may only have 1/2 of the total parking area closed to visitors at any one time.
• Staging for equipment containing liquid emulsions shall be confined to paved parking areas with inlet protection.
• Erosion protection shall be installed on all park inlets during paving operations.
• To reduce noise and pollution emissions, construction equipment shall not idle any longer than is necessary for safety and/or mechanical reasons.
• To reduce the chance that harmful, non-native plants or organisms will be transported from offpark locations to the work site, the contractor, prior to entering the Park, shall clean all soils, roots, seeds, and other sources of plant parts and pathogens from any equipment used for the application of grasses and all heavy equipment, such as dump trucks, front end loader, and graders, which have previously been operating off the park.
• Equipment shall be cleaned of emulsions, asphalt, or chips off of NPS land.
• Leaking equipment shall immediately be removed from the job site and off of NPS land.
• Soil and fill material must be weed-free and from a source approved by the park Natural Resource
Management Specialist. Park NRMS must be given a two week notice to allow time to travel to inspect soil sources.
• The contractor shall submit an accidental emulsion Spill Prevention and Response Plan prior to commencing work on park land.
• All debris generated by this project shall be removed from the park for legal and proper disposal.
• Single lane closure with flaggers shall be used. Lane closures shall not be permitted during the high-visitor leaf changing season in the month of October.
• If the scope of work changes as written in PEPC (i.e., Step 1-Project Description and Project Development
Questions), Project Leader shall notify EPS immediately so that a determination can be made if the compliance completed is sufficient to cover any changes or if additional mitigations are required.
Summary of Section 7 of the Endangered Species Act Compliance The projects were assessed and reviewed in accordance with the provisions of Section 7 of the Endangered Species Act (ESA) by National Park Service (NPS) representatives. On 07/19/16 it was determined that the projects will have No Effect on any federal or state listed species or their critical habitat. Consequently, no further coordination with the Fish and Wildlife Service (FWS) is required under Section 7 of the Endangered Species Act of 1973, as amended.
Summary of Section 106 of the National Historic Preservation Act Compliance The projects were assessed and reviewed on 06/14/16 in accordance with the provisions of the National Historic Preservation Act (NHPA). The project was found to meet all conditions for a streamlined review under section III of the 2008 Servicewide Programmatic Agreement for
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
Section 106 compliance, which resulted in a No Adverse Effect determination. This fulfills the requirements under Section 106 of the National Historic Preservation Act of 1966, as amended.
Additional Agency Coordination and Compliance These projects are covered under an eleven-year parkwide programmatic CE (PEPC 65146) with annual verification (FY17-FY27), NPS CE: C.9. Repair, resurfacing, striping, installation of traffic control devices, repair/replacement of guardrails, etc., on existing roads.
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
Categorical Exclusion Recommendation:
On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I believe the project should be categorically excluded from further NEPA analysis.
Kelly Stern Environmental Protection Specialist
Federal Highway Administration
Date
Categorical Exclusion Determination:
On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I am categorically excluding the described project from further NEPA analysis. The project meets the 23 CFR 771.117(a) definition of a categorical exclusion. No unusual circumstances per 23 CFR 771.117(b) apply.
Kevin S. Rose Environmental Team Leader
Federal Highway Administration
Date
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
Appendix A: Environmental Checklist
Section 7 of the Endangered Species Act:
• Are Federally-listed species potentially present in the study area? ☒Yes, see Notesi ☐No If Yes, effects determination:
☒No Effect ☐May Affect, Not Likely to Adversely Affect ☐May Affect, Likely to Adversely Affect
Section 106 of the National Historic Preservation Act:
• Are historic properties known to be present in the study area? ☒Yes ☐No
If Yes, will they be impacted by the project? ☒Yes ☐No
• Will previously undisturbed ground be disturbed?
☐Yes ☒No
• Effects determination:
☐No Historic Properties Affected ☒No Adverse Effect ☐Adverse Effect, MOA Executed
• Was tribal consultation completed? ☐Yes ☒No
Water and Wetlands:
• Section 404 of the Clean Water Act
Are impacts to Waters of the US anticipated? ☐Yes ☒No If Yes, approval anticipated:
☐Nationwide Permit (NWP) ☐Regional General Permit ☐Individual Permit
• Section 401 of the Clean Water Act ☐NWP certified by State ☐Individual Certification
• Section 402 of the Clean Water Act (National Pollutant Discharge Elimination System) Will the land disturbance threshold likely be exceeded to require a permit and SWPPP?
☐Yes ☒ No
• Is post-construction stormwater management review/approval anticipated? ☐Yes ☒No
• ☒Project is consistent with Executive Order 11990, Protection of Wetlands
Floodplains:
• Is the project in a FEMA floodplain?
☐Yes ☒No ☐ Floodplain not mapped
• ☒ Project is consistent with Executive Order 11988, Floodplain Management
Section 4(f) of the USDOT Act:
• Does the project meet the Section 4(f) exemption for Federal lands transportation facilities under
Section 1119(c)(2) of MAP-21, 23 U.S.C. 138(a)? ☒Yes ☐No
• Is there a use of a Section 4(f) property in the study area? ☒Yes ☐No
If Yes, De Minimis Finding:☐ Programmatic:☒ Individual 4(f): ☐ Section 6(f) of the Land and Water Conservation Fund:
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
• Was the property purchased with grant funds from the Land and Water Conservation Fund?
☐Yes ☒No
• If Yes, was documentation of approval from National Park Service Director received for the conversion or replacement of 6(f) property? ☐Yes ☐No
Coastal Zone Management Act of 1972:
• Is the project in a Coastal Zone? ☐Yes ☒No
• If yes, will a Federal Consistency Review be completed? ☐Yes ☐No
Right of Way:
• Is the project completely within the transportation facility’s right-of-way? ☒Yes ☐No
• If no, will the project require relocations or easements? ☐Yes ☐No
Hazardous Waste and Materials:
• Are hazardous materials or contamination exceeding regulatory thresholds (as set by U.S. EPA, County Environmental Health, etc.) present? ☐Yes ☒No
• If Yes, is the nature and extent of the hazardous materials or contamination fully known? ☐Yes ☐No, plan for securing information provided in Notes Section 7(a) of the Wild and Scenic Rivers Act:
• Are there Wild and Scenic Rivers? ☐Yes ☒No ☐Eligible If Yes, has review by the river-administering agency been completed? ☐Yes ☐No
Clean Air Act:
• Is the project in a non-attainment area? ☐Yes ☒No
If Yes, is the project on the Transportation Improvement Program(TIP)/State Implementation Plan(SIP)? ☐ Yes ☐No
Highway Traffic and Construction Noise Regulations:
• ☐ The proposed project is a Type I project (highway on a new location, substantial horizontal or vertical alteration, new through or auxiliary lanes). Noise analysis is required.
• ☐ The proposed project is a Type II project (retrofit for noise abatement).
• ☒ The proposed project is a Type III project (noise analysis not required).
• ☐ Does not apply.
Farmland Protection Policy Act for Highway Projects:
• Does the project displace, require acquisition of, or require an easement from farmland?
☐Yes ☒No Does the project affect any other resources not listed above? Explain below and list anticipated permits:
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04) i Federally-listed species per U.S. Fish and Wildlife Service’s IPaC: Indiana Bat (Endangered), Northern Long-eared Bat (Endangered), Green Floater (Proposed Threatened), Mitchell’s Satyr Butterfly (Endangered), Monarch Butterfly (Proposed Threatened)