CANYON CREEK STATION WINDOWS & DOORS
Solicitation number
140L2626Q0059
Issued by

About this file

This is a Statement of Work (SOW) for the restoration of the Canyon Creek Stage Station, a historic 1874 structure located in Mountain Home, Idaho. The project, managed by the Bureau of Land Management (Idaho Region), requires the fabrication and installation of four entry doors and five single-hung windows with accompanying panels, trim, and hardware to restore the interconnected Residence and Guest House to their 1874 characteristics. The contractor must fabricate doors approximately 36" x 80" (1-5/8" thick) from Sapele Mahogany or approved equal species with white exterior high-performance acrylic latex paint (2 coats) and include threshold masonry repairs. Windows shall be approximately 38" x 62" single-hung units (1-3/8" thick) from Sapele Mahogany with tempered glass, interior pine paneling, and matching trim; the two dormer windows require additional gable face work including 2" crown molding and treated wood shingles. All work must comply with the Secretary of the Interior's Standards for the Treatment of Historic Properties, include 28 GA galvanized steel flashing with mastic and urethane sealant, and use hardware (vertical rim locksets, brass hinges, door closers, and sash bolts) provided by the BLM. Installation requires supplemental support structures and polyurethane caulking at specified locations.

The contractor must demonstrate minimum five years of experience in historic building restoration with window and door fabrication credentials, such as preservation carpentry degrees or historic building restoration safety certifications. The performance period is 180 days from October 1, 2026 through March 31, 2027, with weekly progress meetings required at the project site. The contractor shall provide scaled shop drawings and product submittals for BLM approval (7 calendar days review) prior to installation, and must supply all necessary power, water, and sanitary facilities. Compensation is structured as a fixed-price lump sum for each line item (doors and windows), with monthly progress payments based on percentage of work completed and verified by the Contracting Officer's Representative. Final payment is made upon satisfactory completion, final inspection and acceptance, submission of all deliverables including photographs and documentation in PDF format, and contract closeout. The Contracting Officer's Representative is Matthew Pawlak (Boise District Office), and the BLM Archaeologist serving as Subject Matter Expert is Cameron Hogin (Four Rivers Field Office).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Canyon Creek Station Windows and Doors

I. SUMMARY

A. Location: Work location is the Canyon Creek Stage Station, 6870 Mayfield Road, Mountain Home, Idaho 83647. From Boise take I-84 east to exit 74 (Simco Rd.) and turn left (north) on Simco Rd to Desert Wind Rd. Turn right (east) and continue on Desert Wind Rd to W. Till Rd. Turn left (east) and travel on W. Till Rd to Ditto Creek Rd. Turn right (south) on Ditto Creek Rd and continue to W. Martha Ave. Turn left and head east on W. Martha Ave to Mayfield Rd. (aka Foothill Rd.) Turn right (southeast) on Mayfield Rd and after dropping down into the canyon, Canyon Creek Stage Station will be on the left-hand side.

Location of Canyon Creek Stage Station (115.7034798°W 43.2620883°N)

B. Purpose: The purpose is to continue the exterior restoration of the historic Canyon Creek Stage Station to its 1874 characteristics (Figure 1). Work will involve one interconnected structure that includes the primary Residence and Guest House. Work on the structure includes materials and labor for window and door fabrication, installation, and painting. Both the windows and doors will include trim and paneling with paint to match. The dormer windows will require additional work consisting of wood trim around gable area and the installation of shingles on the gable face above the windows. Finally, prior to door installation, minor masonry repairs at thresholds will be required.

C. Project is for the Bureau of Land Management (BLM).

D. Contracting Officer’s Representative (COR):

Matthew Pawlak Boise District Office 3948 Development Ave Boise, ID 83705

E. BLM Archeologist (Subject Matter Expert):

Cameron Hogin Four Rivers Field Office (FRFO) 3948 Development Ave Boise, ID 83705

II. Historic Background

The historic Canyon Creek Stage Station was built in 1874 by Jack Slater for the Archibald Daniel family. The structure is located in a lava rock canyon and is constructed from hand cut 13-18” thick lava rock walls with mud mortar reinforced with horsehair. The station originally consisted of two interconnected buildings; Residence and Guest House, which held a living room and bedroom located on the main floor with three guest rooms upstairs. The Cookhouse is located to the rear of the Residence and Guest House and contained a kitchen and cellar. The area spanning the two buildings was a covered drive-through area for wagons and stagecoaches.

Canyon Creek Stage Station provided valuable services to travelers on the Oregon Trail, Kelton Freight Road, and the Overland Stage Route. It provided fresh horses and forage for the mail, stage lines, and travelers, as well as fresh fruit, vegetables, meats, and cool water in the sparse desert. The Daniels family operated the stage stop until the stage line ceased with the completion of the Oregon Shortline Railroad in 1884. The station was a working farm and home until December of 1976, at which time a fire heavily damaged the structure, leaving only the rock walls in place.

Subsequent owners of the historic Station, the Norstebon Family Trust, received grants from the Idaho Heritage Trust in 2012 and 2014 to begin initial planning, stabilization, and restoration of the site. Initial work was accomplished to stabilize and reconstruct the gable ends and a portion of the north rear wall of the structure. The site was gifted to the Bureau of Land Management (BLM) in October 2015. The BLM began restoration work in 2016, and the north wall of the structure was reconstructed. In 2017, the south wall was reconstructed. All work has been accomplished to stabilize and reconstruct the masonry walls and gable ends of the structure (Figures 2 and 3). The roof was completed in 2021 (Figure 4). Work will continue restoration efforts by adding the doors and windows based on plans and drawings created by historical architect Frederick Walters (see attachments).

III Project Requirements and Specifications

A. The project must be completed in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (Attachment 1). Prior to the commencement of work, the COR and the contractor shall review and acknowledge the “Secretary of the Interior’s Standards for the Treatment of Historic Properties” Checklist. Progress payments will not be approved if there is any evidence that the work deviates from the Contract requirements, including the SOW and Attachments. At the Contracting Officer’s discretion, payment may be withheld until the Contract requirements are met.

B. Provide all labor, equipment, materials, and services required to perform the Work according to Frederick L. Walters’s “Canyon Creek Stage Station Restoration Project” Drawings (Attachment 2), additional detail sheets (Attachment 3) based on Walters’s plans, and the Specifications (Attachment 4). This Work includes, but is not limited to, the following:

1. Fabricate and Install Four (4) Entry Doors with Accompanying Panel and Trim:

Architectural Rendering of Door

· Due to the historic nature of the structure the contractor must be prepared to make adjustments to circumstances where door openings are not perfectly plumb. Field verification is required to obtain exact measurements.

· Door Thickness shall be 1-5/8”.

· Doors are approximately 36” x 80”, but field verification is needed.

· When material is not specified in plans, exterior wood material shall be Sapele Mahogany or equal species approved by BLM; vertical grain used for rails and stiles.

· Trim will match windows. Base measurements on the residual plaster of the upper right dormer window (Figure 5).

· Install 28 GA galvanized steel above the trim on the door head with mastic and urethane sealant.

· Polyurethane caulking to be applied.

· Installation of doors will require supplemental support structure. This will be hidden once the paneling is installed but may affect the dimensions of the finished opening.

· Finish not specified in plans. Primer shall be alkyd oil-based and the topcoat an exterior high-performance 100% acrylic latex (2 coats) to match windows and paneling.

· Color not specified in plans. Color shall be white, with final selection to be approved by the BLM.

· Installation of doors will require repairs to existing masonry thresholds at entrances, as shown in Attachment 3, D.1. Concrete sills shall be constructed with 4000 psi concrete with pea gravel and micro fiber.

· Door hardware will be provided by the BLM (see Table 1) and will be a vertical rim style lockset applied to door surface and jam (Figure 6). No morticing required. If lockset comes with a privacy lever, it must be removed so doors lock only with the key.

· Hinges will be provided by BLM (see Table 1) to include three - 3 ½” inch brass hinges per door with (2) loose butt, (3) knuckle, (3) flat screw, and ball finials (Figure 7). Hinges should be surface mounted on the interior of the doors.

· Each door will have one 1460 Series Door Closers, which will be provided by BLM (see Table 1). Door closers should be surface mounted and adjusted.

2. Fabricate and Install Five (5) Single Hung Windows with Accompanying Panel and Trim:

Architectural Rendering of Window

· Due to the historic nature of the structure the contractor must be prepared to make adjustments to circumstances where window openings are not perfectly plumb. Field verification is required to obtain exact measurements.

· (3) Main Floor Windows and (2) Dormer Windows 1-3/8” thick, approximately 38” x 62” all wood single hung windows, fabricated from Sapele Mahogany or equal species.

· Interior paneling wood shall be Pine – C & Better Select, as noted in Attachment 3.

· Dormer windows will require work on the gable face above the window trim header (see Dormer Gable Face Work below).

· Type of glass is not specified in plans. Glass shall be tempered glass for security and potential damage.

· Trim will match doors. Trim for all windows will be the same width, determined by the measurement from the window opening to the extent of the residual plaster located at the upper right dormer window (Figure 5).

· Polyurethane caulking to be applied, except at designated weep/drainage joints per Attachment 3 details.

· Install 28 GA galvanized steel above the trim on the window head and 24 GA galvanized steel below the sill with mastic and urethane sealant.

· Finish not specified in plans. Primer shall be alkyd oil-based and the topcoat an exterior high-performance 100% acrylic latex (2 coats) to match doors and paneling.

· Color not specified in plans. Color shall be white, with final selection approved by the BLM.

· Installation of windows will require supplemental support structure. This will be hidden once the paneling is installed but may affect the dimensions of the finished opening.

· Locking stops to be brass sash bolts. Spring Pins: 3 positions with closed, 3”, and 6” (Figure 8). Windows shall be locked into a fixed position to prevent unintentional opening and closing of windows. Sash Spring bolts shall be antique brass (to match rim lockset and door hinges) with a ball end, sized to fit the fabrication limits of the window. Figure 8 provides a pictorial representation of the sash bolt for reference.

Dormer Gable Face Work:

Architectural Rendering of Gable Face

· 2” crown molding to be placed on the triangular gable face above the dormer.

· Sapele Mahogany or similar species.

· Shingle inside of triangle with treated wood shingles to match the shingle side wall. Treated Shingles to be supplied by the BLM (Table 1).

· Install 28 GA galvanized steel Z metal above the dormer window between the crown molding and shingles. Mastic to be applied to seal.

Table 1: Materials to be supplied by the BLM

Item
Quantity
Description
Shingles
As Required
Treated wood shingles
Door knob
4
Vertical rim lockset applied to door surface and jam. No morticing required
Hinges
12
3-1/2” solid brass hinge with ball finials, surface mounted, flat head screws, two loose butt and three knuckle
1460 Series Door Closer
4
Surface mounted closer.

See Plan and Additional Detail Sheets for complete specifications including the door and window design and trim: interior wood paneling, exterior trim, hardware and other door/window requirements not described above.

Complete full documentation of restoration efforts (e.g. scaled shop drawings, as-builts) with photographs and any plan or elevation drawings created. Submit all documentation to the COR. Any new work should be noted on the as-builts when it was installed and by who – for the next renovation work in many years from now.

IV. Contractor Qualifications

A. The contractor will need to show competence in historic structure restoration with specific window and door fabrication credentials (e.g., regional craft certificates, preservation carpentry degrees, and historic building restoration safety certifications). Provide a resume with examples of historic building project work and current references. Contractor shall demonstrate a minimum of 5 years of experience in historic building restoration including window and door fabrication / installation.

V. Contractor Supplies Contractor and Use of Premises

A. General: During the door and window fabrication process the Contractor shall have use of the premises for daily operations, including use of site, except at described below.

1. The Canyon Creek Stage Station is a popular historic site for visitors. The site outside of the main fence will remain open to visitors during construction unless safety concerns arise. The contractor will contact the BLM representative before closing public access.

B. Use of the Site: Confine operations to areas within Contract limits dictated by BLM. Do not disturb portions of the site beyond the areas in which the Work is indicated.

C. Use of Existing Building: Take all precautions necessary to protect the building during the door and window fabrication/installation process.

D. Contractor will provide a sanitary facility during the project. It will be located as directed by COR.

E. No power is available on site. Power, as needed, will be provided by the contractor.

F. There is no water available on site. Contractor will make arrangements to supply all water required for the project. Minimal water will be needed to repair the rock thresholds and concrete sills. Washing and cleaning of tools and equipment shall be at a location as designated by the COR.

VI. Submittal Requirements

A. Provide submittals (cut sheets, product data) for all materials to be incorporated into the project for approval. Allow the government 7 calendar days for review. Installation will not be allowed without prior approval.

B. Provide accurate scaled shop drawings of windows, doors and panels, prior to construction. Allow the government 7 calendar days for review. Installation will not be allowed without prior approval.

VII. Base Bid

A. Itemized Base Bid shall be submitted. It shall include the following:

Complete window and door construction work per the Plan (A.9 - A.14 and A.17 - A.21), including all associated requirements of the Contract as noted for the Residence and Guest House building and Attachment 3 Additional Data Sheets (D.1 - D.6) as per Scope of Work.

Item No.
Description
Quantity
Units

Total Cost

1
Fabricate and Install Four (4) Entry Doors with Accompanying Panel and Trim. Includes threshold repair.
1
Lump Sum
2
Fabricate and Install Five (5) Single Hung Windows with Accompanying Panel and Trim. Includes gable face work.
1
Lump Sum

TOTAL

VIII. Period of Performance

A. 180 Days: October 1, 2026 – March 31, 2027.

B. Progress Meetings: The contractor will conduct weekly progress meetings at the Project Site. Contractor will provide tentative schedule of progress meetings to BLM’s COR.

IX. Pre-Work Meeting

A. Prior to commencing work the contractor will meet with BLM’s Representative(s) at the project site to review scope and discuss contractor’s understanding of the scope of work and timelines.

X. Deliverable Products

A. Completed door and window fabrication and installation per section III Project Requirements, Specifications, and Plans (Attachment 1, 2, 3, and 4).

B. Photographs documenting reconstruction and any drawings and notes created to document. Photos shall be submitted in PDF format with labels and captions. All notes and drawings shall be in PDF format.

XI. Payment

Payment shall be made in accordance with FAR 52.232-5, Payments under Fixed-Price Construction Contracts, and FAR 52.232-27, Prompt Payment for Construction Contracts.

The Contractor may submit monthly progress payment requests based on the percentage of work completed, measured against the Schedule of Items and verified by the COR.

Final payment, including any retainage withheld, shall be made upon satisfactory completion of all Work, final inspection and acceptance by the COR, submission of all required deliverables (Section X), and completion of contract closeout requirements.

XII. Inspection and Acceptance

The COR will have contractual authority to accept and reject work. The BLM Archaeologist (Subject Matter Expert) will advise the COR; however, the COR will remain the Contractor’s point-of-contact as required by the contractual lines of authority.

Figure 1. Canyon Creek Station Established by Archibald Daniels, Elmore County, Idaho 1874

Figure 2. North Wall: Before and After photos of Stabilization and Restoration Efforts

Figure 3. South Wall: Restored in FY 2017

Figure 4. Front and interior view after roof completion in FY 2021

Figure 5. Residual plaster (upper right dormer window) to base exterior trim measurements for all openings

Figure 6. Antique brass vertical rim lockset with white porcelain knobs.

Figure 7. Surface-mounted antique brass door hinge with ball finials (left) and 1460 Series door closer (right).

Figure 8. Window Spring Bolts image1.jpg image2.jpeg image3.png image4.png image5.png image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.png image12.png image13.png image14.png image15.png