Campbell-Acres-W&S-Cost-Estimate-OPCC-Template_02132026.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Campbell Acres Water and Sewer Improvements
Solicitation number
ITB 26-062
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a cost estimate template for water and sewer improvements in Campbell Acres, prepared for the City of Fort Myers, Florida, utilizing the Orange County Public Schools (OPCC) cooperative purchasing framework. The document establishes a standardized cost estimation structure for the Campbell Acres Water and Sewer Improvements project, providing a template format for respondents to detail labor, materials, equipment, and contingency costs associated with water infrastructure installation and sewer system upgrades within the designated service area.

The cost estimate template includes line-item breakdowns for construction materials, labor costs, equipment rental or purchase, mobilization fees, and project contingencies, enabling the City to evaluate bids on a consistent and comparable basis. The template format facilitates transparent pricing analysis and cost tracking throughout the project lifecycle, ensuring that all respondents provide itemized cost information in a standardized manner to support fair and competitive procurement processes for this public works infrastructure improvement initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Cost Estimate

Engineers Opinion of Probable Construction Cost
City of Fort Myers
Campbell Acres Water and Sewer Improvements
Item No.Item DescriptionQuantityUnitCost/UnitTotalComments
A. GENERAL BID ITEMS
1Consideration for Indemnification1LS$0.00
2Bonds and Insurance1LS$0.00
3General Conditions/Contract Administration1LS$0.00
4Mobilization/Demobilization1LS$0.00
5Shop Drawings/Survey Layout/Record Drawings/GPS Data/Utility Investigations1LS$0.00
6Maintenance of Traffic1LS$0.00
7Prevention Control and Abatement of Erosion and Water Pollution1LS$0.00
Subtotal General Bid Items$0.00
B. WATER DISTRIBUTION SYSTEM BID ITEMS
8Cut and Connect to Ex. Water Main with Cut in Tee, Sleeves and Spool Pieces (Nuna Ave.)EA$0.00
9Cut and Connect to Ex. Water Main with Cut in Tee, Sleeves and Spool Pieces (Ortiz Ave.)EA$0.00
10Furnish and Install 8-Inch PVC C-900 Water Main PipeLF$0.00
11Furnish and Install 8-Inch SDR 11 Water Main Pipe by Pipe BurstingLF$0.00
12Restrain Existing Water Main/Force MainLF$0.00
13Furnish and Install 8-Inch MJ Gate ValveEA$0.00
14Furnish and Install 1-Inch Automatic Air Release Valve (ARV)EA$0.00
15Furnish and Install FittingsLB$0.00
16Furnish and Install New Water Meter BoxEA$0.00
17Furnish and Install 1-Inch Same Side Single Water ServiceEA$0.00
18Furnish and Install 1-Inch Road Crossing Single Water ServiceEA$0.00
19Furnish and Install 1-Inch Same Side Double Water ServiceEA$0.00
20Furnish and Install 1-Inch Road Crossing Double Water ServiceEA$0.00
21Furnish and Install Water Service to 881 Nuna AveLS$0.00
22Remove and Dispose of Existing Fire Hydrant AssemblyEA$0.00
23Furnish and Install Fire Hydrant AssemblyEA$0.00
24Furnish and Install Bacteriological Sample Point and Two Days of Bacteriological SamplingEA$0.00
25Cut, Cap, Grout, and Abandon in Place Water Main (all Sizes)LF$0.00
Subtotal Water Distribution System Bid Items$0.00
C. SANITARY SEWER COLLECTION SYSTEM BID ITEMS
26Furnish and Install LateralEA$0.00
27Adjust Sewer Lateral in Conflict with Proposed Water MainEA$0.00
28Furnish and Install Sewer Lateral Point RepairEA$0.00
29Furnish and Install Sewer Lateral LiningLF$0.00
30Manhole RehabilitationEA$0.00
31Plug Manhole at Sewer Segment 24LS$0.00
32Install UV Cured-In-Place LiningLF$0.00
33Reinstate Laterals and Grouting Annular SpaceEA$0.00
34Cleanout Installation in Grass AreaEA$0.00
35Cleanout Installation in Concrete/Asphalt AreaEA$0.00
36Cleanout RepairEA$0.00
37Bypass Pumping During Cured In Place LiningDAY$0.00
Subtotal Sanitary Sewer Colllection System Bid Items$0.00
D. LIFT STATION REHABILITATION AND TRANSMISSION SYSTEM BID ITEMS
38Demo and Remove all Lift Station EquipmentLS$0.00
39Furnish and Install 4-Inch PVC Force mainLF$0.00
40Bypass Pumping During Lift Station RehabDAY$0.00
41Sanitary Sewer Lift Station Rehabilitation (LS)LS$0.00
42Lift Station Drainage Pipe with EndwallEA$0.00
Subtotal Lift Station Rehabilitation and Transmission System Bid Items$0.00
E. ROADWAY AND RESTORATION BID ITEMS
43Mill and Resurface 1-Inch of SP-9.5 Asphalt including Thermoplastic Striping (Final Restoration)SY$0.00
44Remove and Replace existing Asphalt Speed TableEA$0.00
45Remove and Replace Concrete (Driveway)SY$0.00
46Remove and Replace Existing Concrete SidewalkSY$0.00
47Remove and Replace Existing (2') Valley GutterLF$0.00
48Remove and Replace Asphalt (Trench Repair) (Temporary Restoration)SY$0.00
49Furnish and Install SodSY$0.00
50Right-of-Way Restoration including Landscaping, Repairing Irrigation and Repairing Other Existing ImprovementsLS$0.00
51Remove and Replace Chain Link Fence at 4817 Jeanie LNLF$0.00
52Unanticipated Support of Existing Power PoleEA$0.00
Subtotal Roadway Restoration Bid Items$0.00$0.00
F. ALLOWANCES
A1Permit, Licenses, and Fees1AL$0.00
A2Unforeseen Conditions1AL$0.00
A3Additional Testing1AL$0.00
A4Power Supplier – Transformer or Utility Upgrades1AL$0.00
Allowances$0.00
Total Base Bid$0.00
Escalated to Midpoint of Construction$0.00
Total for Construction$0.00
Low Estimate (-15%)$0.00
High Estimate (+20%)$0.00
Notes:1. Final costs of project will depend on competitive market conditions and actual labor and material costs which are variable. It is noted that the market is currently experiencing large price fluctuations for both materials and labor. These price fluctuations may impact overall project costs, depending on timing of the bid.
2. This estimate does not include a factor for escalation and represents the opinion of probable construction cost.
3. The impacts of tariffs can have significant consequences on the final costs of the project, including but not limited to an increase in material costs for essential construction materials; supply chain disruptions leading to delays and shortages of materials; increased project timelines which can result in additional project labor, equipment rentals, and other associated costs.

File details come from the government source that posted it. Updated .