Calculation of Self Performed Work.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
UPDATED to add RFI form - Install Solar-Powered Parking Lot Lights - Riverside, CA
Solicitation number
12905B21R0007
Issued by

View the file

Other files

File Type Posted
RFIform.pdf PDF
RFI1with_response.pdf PDF
QUESTIONS AND ANSWERS.docx DOCX document
QUESTIONS AND ANSWERS.docx DOCX document
Lights_User Manual.pdf PDF
PreRegistrants for the site visit.xlsx XLSX spreadsheet
Base Pole spec sheet.pdf PDF
SLI-STEALTH-LED-Solar-street-light Stealth 80W9116.pdf PDF
12905B21R0007.pdf PDF
ARS-372.pdf PDF
SOW US Salinity Lab Solar-Powered Lot Lights .pdf PDF
ARS-371.pdf PDF
WD.pdf PDF
Contractor Certification Regarding EMR.pdf PDF
Past Performance Capability Information.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for XXXXXXXXXXXXX (NAICS code XXXXXXX) must provide
at least 25/15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible small business concerns. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00
SubY$0.00$0.00
SubY
SubY
SubY
SubY
SubN$0.00$0.00
SubN
SubN
SubN
SubN
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* that are not SB
companies that will perform work on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$ - 0
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .