This document provides a template for offerors to calculate the percentage of self-performed work on contract number 626-19-103 to upgrade hallways and interiors on the 4th floor of the Nashville VA Medical Center. Offerors must perform at least 15 percent of the total personnel costs with their own employees or those of verified Service Disabled Veteran Owned Small Business subcontractors, or 25 percent for specialty trades. The template includes spaces to provide personnel and material/equipment costs by specification division, along with calculations for home office overhead, profit, and bond costs. Offerors must also show the calculation of self-performed personnel costs as a percentage of the total personnel costs for prime contractors and subcontractors on the project.
The related federal contract opportunity is solicitation number 36C24924B0004 for the upgrade of hallways and interiors on the 4th floor of the Nashville VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK Project # 626-19-103 Upgrade Nashville VAMC 4th Floor Hallways & Interiors
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/ fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)
Sub Total (Personnel Costs, Material/Equipment Costs)
Profit $ Home Office Overhead $ Bond $ Grand Total $
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $
4. Self-performed work = Line 3/Line 1 x 100 = %