This document is a Security/Access Requirements attachment for RFQ CAFC26-0008, the Tactile Project, issued by the U.S. Court of Appeals for the Federal Circuit (CAFC) at the National Courts Building (NCB) in Washington, DC.
The project operates under standard working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday only, with entry through the H Street breezeway or Madison Street gates. No weekend, evening, or extended-hour work is permitted without minimum two-week advance written approval and Court authorization, which may incur additional Court Security Officer (CSO) costs. Work is prohibited on the 8th and 9th floor chamber areas during CAFC court week (held one week per month with advance notice) and on major holidays (Thanksgiving, Christmas, New Year's Day). Contractors must avoid loud equipment, disruptive activities, fumes, dust, and chemical odors during active court proceedings, with immediate work stoppage required if operations interfere with court functions. A coordination meeting is mandatory before each court week.
Personnel security clearance requirements mandate either Option A (staff project entirely with HSPD-12 cleared workers) or Option B (HSPD-12 cleared supervisors escorting non-cleared workers at a maximum ratio of 5 non-cleared employees per cleared escort). All personnel must present valid government-issued photo identification and wear temporary daily contractor badges visibly at all times. Weekly access requests must be submitted by Thursday 2:00 p.m. sharp via GSA-provided spreadsheet format, with approval granted within 24 hours on an all-or-nothing basis. Restricted court space access (chambers, judicial offices, secure conference areas) requires one-week advance email request and GSA building management or Security escort. Entry requirements include metal detection, bag inspection, vehicle inspections for garage access, and prohibited photography/recording devices without authorization. Security violations including unauthorized restricted-area access, credential sharing, escort protocol failures, or casual discussions with court staff about project details result in immediate removal with potential permanent banning. Enforcement escalates from written warning on first violation to 24-48 hour suspension on second violation, extended suspension on third violation, and permanent removal for repeated violations, with security violations subject to immediate removal regardless of history. Appeals of violations must be submitted to the GSA project manager within 24 hours and are reviewed within 48 hours, with the Court retaining final authority over all access and operational decisions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment E - Security/Access Requirements RFQ CAFC26-0008 - Tactile Project
Source: U.S. Court of Appeals for the Federal Circuit, National Courts Building (NCB)
Contractor Access Requirements, October 2025, Version 1.0, as modified below for this RFQ's specific work hours. The following sections are excerpted specifically for contractor access to the federal building; sections addressing general construction operations, loading dock, waste management, and building systems not related to personnel access have been omitted. Vendors should coordinate with the Court for the complete governing document upon award.
1.Location
The National Courts Building (NCB) Complex is located at 717 Madison Place, NW, Washington, DC, directly facing Lafayette Square, one block north of the White House. The complex consists of four interconnected buildings, including three individually listed National
Register historic structures. This location requires enhanced security measures and operational protocols for all contractor access.
2. Standard Working Hours and Entry Points
Work hours for this project are s:oo a.m. - s:oo p.m., Monday through Friday, only. No weekend work is authorized under this contract.
Period Days Hours Entry Point Security Special
Level Restrictions
Standard Monday-Friday s:ooa.m.- H Street Full No chamber floors
Work s:oop.m. breezeway or screening (8th/9th) during
Hours Madison Street court week gates
Major Thanksgiving, Nowork N/A N/A Applies to actual
Holidays Christmas, New permitted day and legal
Year's Day holiday
No extended hours, evening, weekend, or Sunday access is contemplated under this contract.
Any request to deviate from the s:oo a.m.-5:00 p.m., Monday-Friday schedule must be submitted in writing to the Court a minimum of 2 weeks in advance and is subject to Court approval and any applicable CSO costs.
Work During Standard Hours - Court Coordination Requirements: Because this project's work hours overlap with normal court business hours, all work is subject to:
• No work permitted on 8th or 9th floor chamber areas without prior written approval