Cabot Work Hours Sketch.pdf

PDF 1 MB Posted

Attached to
RFP 15-26: Albany and Cabot Outdoor Lighting Project
Solicitation number
BD-27-1206-40000-40000-131688
Issued by
Suffolk County, Massachusetts

About this file

Summary

This document is a set of demolition and installation layout plans for the Cabot Bus Facility, a project by the Massachusetts Bay Transportation Authority (MBTA) under Contract No. Z94PS09, as part of the Bus Facility Modernization Program. The project involves comprehensive lighting system upgrades at the Cabot bus yard facility located at 841 Worcester Road, Suite 163, Natick, Massachusetts. The scope of work includes demolishing existing pole-mounted and building wall-mounted light fixtures, associated mounting hardware, power cabling, and conduit systems, while selectively removing and replacing certain fixtures and reusing existing conduit infrastructure where applicable. The plans are organized into two primary sets: demolition layouts (sheets E-101 through E-104) and new installation layouts (sheets E-201 through E-204), each drawn at a scale of 1" = 20' and prepared as of July 9, 2026, with issuance for construction dated July 13, 2026.

The project is subject to strict operational constraints tied to MBTA bus facility work hours, with work divided into revenue hours (5:00 AM to 9:00 PM weekdays) and non-revenue hours (9:00 PM to 5:00 AM weekdays and all weekend hours from Friday 9:00 PM through Monday 5:00 AM). Certain critical activities, including pole and foundation removal and work in electrical switchboards, must be completed exclusively during non-revenue weekend nights to minimize disruption to bus operations and vehicle maintenance activities. The electrical contractor bears responsibility for verifying underground utility locations, notifying utility companies prior to excavation, and bearing all costs for damage to existing utilities. Installation includes new light poles with handholes positioned within 1 to 2 feet of the base, new exterior wall-mounted fixtures with junction boxes and weatherproof sealing, underground and above-ground conduit systems using Schedule 80 PVC below grade and RMC above grade, and coordination with existing HVAC and building systems.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC. CONC.

CONC.

CONC. W

ALK

CC

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALLS

CONC. WALL

MECHANICAL UNITS

CONC. WALL

CONC. WALL

MECHANICAL UNITS

CONC. WALLS

CC

SWL

SWL

SWL

XM X

XN XN

XN

XN

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XN

20' AFF

XN

20' AFF

XN

12' AFF

XN

20' AFF

XN

20' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFFXN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-1

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

N

DEMOLITION LAYOUT PLAN

E-101 0 07/09/2026

AS SHOWN

NONE DH KM KF

E-401

NOTE 4 (TYPICAL)

NOTE 3 (TYPICAL)

NOTE 1 & 2

NOTES:

1. DEMOLISH EXISTING POLE BASE, POLE, POLE-MOUNTED

LUMINARIES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING BACK TO SOURCE. EXISTING TIME CLOCKS

DEDICATED TO POLE-MOUNTED LUMINARIES SHALL BE

DEMOLISHED.

2. EXISTING CONDUIT SHALL BE REUSED AND EXTENDED TO

NEW LIGHT POLE LOCATION. NEW WIRES SHALL BE RUN IN

EXISTING CONDUIT.

3. DEMOLISH EXISTING BUILDING WALL-MOUNTED LIGHT

FIXTURES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING AND CONDUIT. REMOVE WIRING BACK TO

THE SOURCE PANEL. FIXTURE ELEVATION IS APPROXIMATE.

4. EXISTING BUILDING WALL-MOUNTED LIGHT FIXTURES ON

THE RTL BUILDING INDICATED WITH "XN" SHALL BE

REMOVED AND REPLACED WITH NEW. THE EXISTING LIGHT

FIXTURE AND MOUNTING HARDWARE SHALL BE REMOVED.

THE EXISTING CONDUIT AND WIRING SHALL REMAIN. THE

WIRING SHALL BE RECONNECTED TO THE NEW FIXTURE.

EXISTING RISER

POLE

EXISTING

OVERHEAD WIRES

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout This pole and foundation removal must be done during weekend nights dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson Text Box 09/16/2026

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALL

CONC. WALK

CC

CC

AeccDbSurfaceContourLabeling (AeccLand130)

XN

15' AFF

XN

6' AFF

XN

15' AFF

XN

15' AFF

XN

20' AFF

XN

20' AFF

XN

20' AFF

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-1

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

DEMOLITION LAYOUT PLAN

E-102 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

NOTES:

1. DEMOLISH EXISTING BUILDING WALL-MOUNTED LIGHT

FIXTURES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING AND CONDUIT. REMOVE WIRING BACK TO

THE SOURCE PANEL. FIXTURE ELEVATION IS APPROXIMATE.

2. EXISTING BUILDING WALL-MOUNTED LIGHT FIXTURES ON

THE RTL BUILDING INDICATED WITH "XN" SHALL BE

REMOVED AND REPLACED WITH NEW. THE EXISTING LIGHT

FIXTURE AND MOUNTING HARDWARE SHALL BE REMOVED.

THE EXISTING CONDUIT AND WIRING SHALL REMAIN. THE

WIRING SHALL BE RECONNECTED TO THE NEW FIXTURE.

NOTE 1 (TYPICAL)

NOTE 2 (TYPICAL)

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.CONC.

CONC.

CONC. W

ALK

CONC.

MECHANICAL UNITS

CC

CC

CC

CC

CC

CC

LSA

LSA

LSA

CONC. WALL

SWL

SWL

ASPHALT W

ALK

CONC. WALK

CONC. WALLS

CC

CC

CC

CC

CC

CC

CC

SWL

XM

XM

XM

XM

XN

12' AFF

X

30' AFF

X

30' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

X

30' AFF

X

30' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

X

30' AFF

XN

15' AFF

XN

15' AFF

X

30' AFF

XN

6' AFF

X

20' AFF

XN

15' AFF

X

30' AFF

XN

15' AFF

XN

15' AFF

XN

15' AFF

XN

20' AFF

XN

15' AFF

XN

15' AFF XN

6' AFF

XM

20' AFF

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-1

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

DEMOLITION LAYOUT PLAN

E-103 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

NOTES:

1. DEMOLISH EXISTING BUILDING WALL-MOUNTED LIGHT

FIXTURES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING AND CONDUIT. REMOVE WIRING BACK TO

THE SOURCE PANEL. FIXTURE ELEVATION IS APPROXIMATE.

2. THE EXISTING FIXTURES INDICATED WITH "X" SHALL BE

DEMOLISHED ENTIRELY, INCLUDING WIRING AND CONDUIT

BACK TO THE SOURCE PANEL.

3. THE FIXTURES INDICATED WITH "XN" SHALL BE REMOVED

AND REPLACED WITH NEW. THE FIXTURE AND MOUNTING

HARDWARE SHALL BE REMOVED. THE WIRING AND

CONDUIT SHALL BE PROTECTED FOR REUSE.

NOTE 2 (TYPICAL)

NOTE 1 (TYPICAL)

NOTE 3

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. W

ALK

CONC. W

ALK

ELECTRIC UNITS

CONC. PADS W/

MECHANICAL UNITS

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALL

CONC. WALL

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

GRASS

GRASS

GRASS

GRASS LSA

LSA

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

CONC. WALL

CONC. WALL

CONC. WALL

SWL

CONC. WALK

SW

L

CONC.

LSA

ASPHALT

CONC.

SWL

SWL

SWL

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

X

X

XM

20' AFF

XM

20' AFF

XM

8' AFF

X

30' AFF

XM

20' AFF

XN

20' AFF

XM

8' AFF

XN

20' AFF

XN

8' AFF

XN

14' AFF

XN

9' AFF

XN

7' AFF

XN

11' AFF

XM

XN

20' AFF

XM

20' AFF

X

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-1

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

DEMOLITION LAYOUT PLAN

E-104 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

NOTES:

1. DEMOLISH EXISTING POLE BASE, POLE, POLE-MOUNTED

LUMINARIES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING BACK TO SOURCE. EXISTING TIME CLOCKS

DEDICATED TO POLE-MOUNTED LUMINARIES SHALL BE

DEMOLISHED.

2. EXISTING UNDERGROUND CONDUIT SHALL BE ABANDONED

IN PLACE.

3. THE FIXTURES INDICATED WITH "XN" SHALL BE REMOVED

AND REPLACED WITH NEW. THE FIXTURE AND MOUNTING

HARDWARE SHALL BE REMOVED. THE WIRING AND

CONDUIT SHALL BE PROTECTED FOR REUSE.

4. EXISTING LIGHT POLE BASE WITH EXPOSED WIRES.

REMOVE LIGHT POLE BASE, CONCRETE FOUNDATION AND

WIRES BACK TO SOURCE.

5. THE EXISTING FIXTURES INDICATED WITH "X" SHALL BE

DEMOLISHED ENTIRELY, INCLUDING WIRING AND CONDUIT

BACK TO THE SOURCE PANEL.

E-401

NOTE 3 (TYPICAL)

NOTE 4

POLE MOUNTED SECURITY CAMERA

NOTE 1 & 2

NOTE 1 & 2

NOTE 3 (TYPICAL)

NOTE 5

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout This pole and foundation removal must be done during nights dhurson Callout This pole and foundation removal must be done during nights dhurson Callout These fixtures and conduit can be removed during nights or weekends dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC. CONC.

CONC.

CONC. W

ALK

CC

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALLS

CONC. WALL

MECHANICAL UNITS

CONC. WALL

CONC. WALL

MECHANICAL UNITS

CONC. WALLS

CC

SWL

SWL

SWL

XM

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

20' AFF

NOTE 3

20' AFF

NOTE 3

12' AFF

NOTE 3

20' AFF

NOTE 3

20' AFF

NOTE 3

15' AFF 15' AFF 15' AFF 15' AFF 15' AFF 15' AFF 15' AFF 15' AFF 15' AFF 15' AFF

15' AFF15' AFF 15' AFF15' AFF 15' AFF15' AFF

XM

15' AFF

XM

15' AFF

XM

15' AFF

20' AFF

15' AFF

NOTE 4

15' AFF

NOTE 4

15' AFF

NOTE 4

15' AFF

NOTE 4

HH-LP1

L14L14 HH-LP2

L13L14

LP1

HVAC: CKT. NO. 9

LP2

HVAC: CKT. NO. 9

LP3

HVAC: CKT. NO. 11

L14

HH-SOUTH

XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-2

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

N

LAYOUT PLAN

E-201 0 07/09/2026

AS SHOWN

NONE DH KM KF

NOTE 7

NOTE 7

C002B

C002A

40' AFF

ORIENTATION: 270

TILT: 70

40' AFF

ORIENTATION: 270

TILT: 70

NOTE 5 (TYPICAL)

NOTE 10

C006

LP-EXT: CKT. NO. 6

C005

LP-EXT: CKT. NO. 5

NOTE 6 (TYPICAL)

C008

NOTES:

1. LIGHT POLE HANDHOLES SHALL BE INSTALLED WITHIN 1 TO

2 FT (OR AS CLOSE AS PRACTICAL) FROM LIGHT POLE BASE.

HANDHOLES SHALL BE LOCATED IN NON-ROADWAY

LOCATIONS WHENEVER POSSIBLE.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FOR DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT. REFER TO TYPICAL DUCT BANK ARRANGEMENT

DETAIL ON SHEET E-400 FOR DUCT BANK CONSTRUCTION

REQUIREMENTS.

3. CONNECT NEW LIGHT FIXTURE TO EXISTING BRANCH

CIRCUIT.

4. NEW CONDUCTORS SHALL BE PROVIDED IN EXISTING

CONDUIT FOR NEW LIGHT FIXTURES. NEW LIGHT FIXTURES

SHALL BE MOUNTED TO EXISTING 4" x 4" SQUARE POLES.

5. NEW EXTERIOR WALL MOUNTED FIXTURES SHALL BE

PROVIDED WITH A NEW JUNCTION BOX, NEW MOUNTING

BRACKET, AND NEW WEATHERPROOF SEALANT FOR A

WATERTIGHT INSTALLATION.

6. CONDUIT ROUTING IN THE BUILDING HAS BEEN PROVIDED

FOR DIAGRAMMATIC PURPOSES. ELECTRICAL

CONTRACTOR SHALL FIELD VERIFY THE EXACT ROUTING.

7. NEW CONDUIT FOR EXTERIOR WALL PACK LIGHTING SHALL

BE ROUTED ON THE BUILDING EXTERIOR.

8. PROVIDE JUNCTION BOXES AS NEEDED FOR BRANCH

CIRCUIT ROUTING. JUNCTION BOXES SHALL BE

ACCESSIBLE.

9. EXISTING UNDERGROUND CONDUIT TO STORAGE TANK

AREA LIGHTS SHALL BE EXTENDED WITH NEW CONDUIT TO

NEW PANELBOARD. THE EXISTING UNDERGROUND

CONDUIT SHALL REMAIN AND BE REUSED WITH NEW

CONDUCTORS. EXACT LOCATION WHERE EXISTING

CONDUIT PENETRATES THE FLOOR SLAB SHALL BE

VERIFIED IN THE FIELD.

10. CONDUITS SHALL EXIT THE BUILDING AND BE SURFACE

MOUNTED TO THE ROOF EDGE NEAREST THE NEW LIGHT

POLE. NEW OVERHEAD ELECTRICAL CONDUCTORS SHALL

BE PROVIDED WITH A STEEL MESSENGER CABLE

SUPPORTED BY STRAIN INSULATORS.

NOTE 8 (TYPICAL)

EXISTING RISER

POLE

NOTE 1 (TYPICAL)

C004

LP-EXT: CKT. NO. 4

(NOTE 9)

E-205

C003

NOTE 5

(TYPICAL)

NOTE 10

NOTE 2

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout This pole, foundation, and duct bank installation must be done during weekend nights dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALL

CONC. WALK

CC

CC

AeccDbSurfaceContourLabeling (AeccLand130)

15' AFF

6' AFF

15' AFF15' AFF

20' AFF

NOTE 3

20' AFF

NOTE 3

20' AFF

NOTE 3

20' AFF

20' AFF

20' AFF

20' AFF

20' AFF

20' AFF

20' AFF

PC

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-2

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

LAYOUT PLAN

E-202 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

NOTE 1

E-205

NOTES:

1. NEW CONDUIT FOR EXTERIOR WALL PACK LIGHTING SHALL

BE ROUTED ON THE BUILDING EXTERIOR.

2. CONDUIT ROUTING IN THE BUILDING HAS BEEN PROVIDED

FOR DIAGRAMMATIC PURPOSES. ELECTRICAL

CONTRACTOR SHALL FIELD VERIFY THE EXACT ROUTING.

3. CONNECT NEW LIGHT FIXTURE TO EXISTING BRANCH

CIRCUIT.

4. PROVIDE NEW ROOF-MOUNTED PHOTOCELL ON THE TOWER

WALL, FACING NORTH. PROVIDE (3) #12 IN 3/4" C (RGS) FROM

PHOTOCELL TO NEW PANEL LP-EXT FOR LIGHTING

CONTROL.

5. NEW EXTERIOR WALL MOUNTED FIXTURES SHALL BE

PROVIDED WITH A NEW JUNCTION BOX INSIDE THE

BUILDING, NEW MOUNTING BRACKET, AND NEW

WEATHERPROOF SEALANT FOR A WATERTIGHT

INSTALLATION.

6. PROVIDE JUNCTION BOXES AS NEEDED FOR BRANCH

CIRCUIT ROUTING. JUNCTION BOXES SHALL BE

ACCESSIBLE.

C007

C006

NOTE 2 (TYPICAL)

C005

C010

C009 C011

C012A

C008

NOTE 1

NOTE 4

NOTE 5 (TYPICAL)

C004

NOTE 6

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout Work in the switchboard must be during weekend nights dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. W

ALK

CONC. W

ALK

CONC. W

ALK

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.CONC.

CONC.

CONC. W

ALK

CONC.

MECHANICAL UNITS

CC

CC

CC

CC

CC

CC

LSA

LSA

LSA

CONC. WALL

SWL

SWL

ASPHALT W

ALK

CONC. WALK

CONC. WALLS

CC

CC

CC

CC

CC

CC

CC

SWL

XM

XM

XM

XM

XM

XM

12' AFF

15' AFF

15' AFF

15' AFF 15' AFF

15' AFF15' AFF

15' AFF 15' AFF

6' AFF

15' AFF

15' AFF15' AFF

15' AFF

15' AFF

6' AFF

XM

20' AFF

20' AFF

20' AFF

15' AFF

20' AFF

NOTE 3

20' AFF

NOTE 3

HH-LP4

LP4

LP-EXT: CKT/ NO. 11

L10

L10

L14

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-2

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

LAYOUT PLAN

E-203 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

30' AFF

LP-EXT: CKT. NO. 8

ORIENTATION: 0

TILT: 50

NOTE 4

NOTES:

1. LIGHT POLE HANDHOLES SHALL BE INSTALLED WITHIN 1 TO

2 FT (OR AS CLOSE AS PRACTICAL) FROM LIGHT POLE BASE.

HANDHOLES SHALL BE LOCATED IN NON-ROADWAY

LOCATIONS WHENEVER POSSIBLE.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FOR DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT. REFER TO TYPICAL DUCT BANK ARRANGEMENT

DETAIL ON SHEET E-400 FOR DUCT BANK CONSTRUCTION

REQUIREMENTS.

3. CONNECT NEW LIGHT FIXTURE TO EXISTING BRANCH

CIRCUIT.

4. CONDUIT TRANSITIONS FROM ABOVE GROUND RMC TO

BELOW GRADE SCHEDULE 80 PVC WITH RMC ELBOWS.

5. CONDUIT ROUTING IN THE BUILDING HAS BEEN PROVIDED

FOR DIAGRAMMATIC PURPOSES. ELECTRICAL

CONTRACTOR SHALL FIELD VERIFY THE EXACT ROUTING.

6. NEW CONDUIT FOR EXTERIOR WALL PACK LIGHTING SHALL

BE ROUTED ON THE BUILDING EXTERIOR.

7. PROVIDE JUNCTION BOXES AS NEEDED FOR BRANCH

CIRCUIT ROUTING. JUNCTION BOXES SHALL BE

ACCESSIBLE.

8. EXTEND EXISTING LIGHTING CIRCUIT TO NEW FIXTURE.

PROVIDE (2) #10 & (1) #10 GND IN 3/4" C (RGS).

9. MOUNT NEW FLOOD LIGHT TO THE END OF EXISTING

CANOPY STRUCTURE BEAM, MATCHING THE MOUNTING

STYLE OF EXISTING FLOOD LIGHTS.

10. NEW EXTERIOR WALL MOUNTED FIXTURES SHALL BE

PROVIDED WITH A NEW JUNCTION BOX INSIDE THE

BUILDING, NEW MOUNTING BRACKET, AND NEW

WEATHERPROOF SEALANT FOR A WATERTIGHT

INSTALLATION.C007

LP-EXT: CKT. NO. 7

NOTE 6

NOTE 6

30' AFF

ORIENTATION: 90

TILT: 80

30' AFF

ORIENTATION: 90

TILT: 80NOTE 6

30' AFF

ORIENTATION: 90

TILT: 80

NOTE 6

NOTE 4

NOTE 2 (TYPICAL)

C010

LP-EXT: CKT. NO. 10

C009

LP-EXT: CKT. NO. 9

C012A

C011

NOTE 5 (TYPICAL)

C008

LP-EXT: CKT. NO. 8

NOTE 7 (TYPICAL)

20' AFF

ORIENTATION: 250

TILT: 80

NOTE 8

NOTE 9

C011

STRUCTURALLY

REINFORCED

NOTE 10

(TYPICAL)

C012A

STRUCTURALLY

REINFORCED

APPROXIMATE

LOCATION OF NEW

FUELER'S BOOTH

BEING CONSTRUCTED

IN A SEPARATE

PROJECT

NOTE 1

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout These duct banks will need to be installed in mulitple phases such that cars/buses can always travel through roadway dhurson Rectangle dhurson Polygon dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. W

ALK

CONC. W

ALK

ELECTRIC UNITS

CONC. PADS W/

MECHANICAL UNITS

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CONC. WALL

CONC. WALL

CONC. WALL

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

ASPHALT WALK

GRASS

GRASS

GRASS

GRASS LSA

LSA

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

CONC. WALL

CONC. WALL

CONC. WALL

SWL

CONC. WALK

SW

L

CONC.

LSA

ASPHALT

CONC.

SWL

SWL

SWL

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

XM

20' AFF

XM

20' AFF

XM

8' AFF

XM

20' AFF

20' AFF

NOTE 3

XM

8' AFF

14' AFF

9' AFF

7' AFF

11' AFF

XM

XM

20' AFF

20' AFF

NOTE 3

8' AFF

NOTE 3

HH-LP8

LP8

LP-EXT: CKT. NO. 15

L14 HH-LP7

LP7

LP-EXT: CKT. NO. 14

L14

L14

HH-LP6

LP6

LP-EXT: CKT. NO. 13

L14

L14

HH-LP5

LP5

LP-EXT: CKT. NO. 12

L14

L12

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

CABOT BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\C

AB

O

T\ C

AB

O

T

- E

-2

E-

4.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

LAYOUT PLAN

E-204 0 07/09/2026

AS SHOWN

NONE DH KM KF

N

NOTE 4

NOTE 5

POLE MOUNTED SECURITY CAMERA

NOTES:

1. LIGHT POLE HANDHOLES SHALL BE INSTALLED WITHIN 1 TO

2 FT (OR AS CLOSE AS PRACTICAL) FROM LIGHT POLE BASE.

HANDHOLES SHALL BE LOCATED IN NON-ROADWAY

LOCATIONS WHENEVER POSSIBLE.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FOR DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT. REFER TO TYPICAL DUCT BANK ARRANGEMENT

DETAIL ON SHEET E-400 FOR DUCT BANK CONSTRUCTION

REQUIREMENTS.

3. CONNECT NEW LIGHT FIXTURE TO EXISTING BRANCH

CIRCUIT.

4. CONDUIT TRANSITIONS FROM ABOVE GROUND RMC TO

BELOW GRADE SCHEDULE 80 PVC WITH RMC ELBOWS.

5. NEW CONDUIT FOR EXTERIOR WALL PACK LIGHTING SHALL

BE ROUTED ON THE BUILDING EXTERIOR.

NOTE 1 (TYPICAL)

C012A

C012CC012D

C012E

STRUCTURALLY

REINFORCED

C012B

NOTE 2 (TYPICAL)

07/13/2026

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout These duct banks will need to be installed in multiple phases such that cars/buses can always travel through roadway dhurson Polygon dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout This duct bank will need to be installed in multiple phases such that two parking aisles are always available dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

Sheets and Views
G-001 - TITLE SHEET-INDEX
plot1_2
plot

File details come from the government source that posted it. Updated .