This document is a work hours sketch prepared for the City of Albany. The sketch outlines the preliminary scheduling and time allocation for a project, though the specific project scope and deliverables are not detailed in this sketch format. No specific response dates, bid due dates, site visits, bidders' meetings, award dates, or contract terms are identified in this preliminary scheduling document.

The sketch does not contain information regarding pricing terms, set-asides, incumbents, funding sources, or other financial requirements. As a preliminary work hours allocation tool, this document serves as an internal planning document rather than a formal solicitation instrument with defined commercial terms.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

OBSCURED AREA

(SIGN)

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

AeccDbCogoPoint (AeccLand130)

BRICK

CONC.

CONCRETE

WALL

SY

L

SY

L

ASPHALT

X

XM

X

X

XM

X

XM

X

XM

XM

XM

XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-1

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

DEMOLITION LAYOUT PLAN

E-101 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTES:

1. DEMOLISH EXISTING POLE BASE, POLE, POLE-MOUNTED

LUMINARIES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING BACK TO SOURCE. EXISTING TIME CLOCKS

DEDICATED TO POLE-MOUNTED LUMINARIES SHALL BE

DEMOLISHED.

2. EXISTING UNDERGROUND CONDUIT SHALL BE ABANDONED IN

PLACE.

3. VERIFY EXISTING NETWORK OF (2) 2" EMPTY UNDERGROUND

CONDUITS TO BE USED FOR THIS PROJECT. APPROXIMATE

CONDUIT AND HANDHOLE LOCATIONS ARE SHOWN.

4. EXISTING UNISTRUT-MOUNTED 6"x6"x4" ELECTRICAL CABINET

WITH RECEPTACLE SHALL REMAIN.EXISTING HANDHOLE

NOTE 3 (TYPICAL)

EXISTING POLE

NOTE 1 & 2 (TYPICAL)

EXISTING SURFACE MOUNTED PULL BOX TO BE REMOVED

EXISTING SURFACE MOUNTED CONDUIT TO BE REMOVED

EXISTING RISER POLE TO BE REMOVED

EXISTING OVERHEAD WIRES TO BE REMOVED

EXISTING OVERHEAD WIRES TO BE REMOVED

E-401

N

NOTE 4

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson Text Box 09/16/2026

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDINGEXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

AeccDbCogoPoint (AeccLand130)

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC.

BRICK

BRICK

CONC.

CONC.

CONC.

CONC.

CONC.

TRANS.

LSA

LSA

LSA

BRICK

CONC.

CONC.

CONCRETE

WALL

BRICK

AeccDbCogoPoint (AeccLand130)

CONC.

CONCRETE

WALL

HANDHOLEHANDHOLE

UTILITY VALVE

AREA

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

CONC. PAD

W/ MECHANICAL

UNIT

SYL

SY

L

XN

18' AFF

XN

8' AFF

XN

18' AFF

XN

18' AFF

XN

8' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

9' AFF

XN

11' AFF

XN

8' AFF

XN

11' AFF

XN

18' AFF

XN

8' AFF

XN

18' AFF

XN

8' AFF

XN

18' AFF

XN

18' AFF

XN

8' AFF

XN

18' AFF

XR

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XN

18' AFF

XXM

XXMXM

T

X

24' AFF

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-1

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

N

DEMOLITION LAYOUT PLAN

E-102 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTES:

1. DEMOLISH EXISTING POLE BASE, POLE, POLE-MOUNTED

LUMINARIES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING BACK TO SOURCE. EXISTING TIME CLOCKS

DEDICATED TO POLE-MOUNTED LUMINARIES SHALL BE

DEMOLISHED.

2. EXISTING UNDERGROUND CONDUIT SHALL BE ABANDONED IN

PLACE.

3. VERIFY EXISTING NETWORK OF (2) 2" EMPTY UNDERGROUND

CONDUITS TO BE USED FOR THIS PROJECT. APPROXIMATE

CONDUIT AND HANDHOLE LOCATIONS ARE SHOWN.

4. DEMOLISH EXISTING BUILDING WALL-MOUNTED LIGHT

FIXTURES, MOUNTING HARDWARE, AND ASSOCIATED POWER

CABLING AND CONDUIT. REMOVE WIRING BACK TO THE

SOURCE PANEL. FIXTURE ELEVATION IS APPROXIMATE.

5. THE EXISTING (2) 2" CONDUITS TURN UP AND ARE CAPPED AT

THE BUILDING EXTERIOR WALL.

EXISTING POLE

NOTE 1 & 2 (TYPICAL)

EXISTING HANDHOLE

NOTE 3 (TYPICAL)

UTILITY TRANSFORMER

NOTE 4 (TYPICAL)

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

NOTE 5

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. CONC.

CONC.

CONC.

BRICK

LSA

BRICK

AeccDbCogoPoint (AeccLand130)

ASPHALT

ASPHALT

ASPHALT

CCCC

CC

CONCRETE

WALL

BC

BC

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

SY

L

SY

L

SY

L

SY

L

SY

L

SY

L

XXM

XM

XMXM

XM

XM

XM

XM XM XM XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-1

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

DEMOLITION LAYOUT PLAN

E-103 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTES:

1. DEMOLISH EXISTING POLE BASE, POLE, POLE-MOUNTED

LUMINARIES, MOUNTING HARDWARE, AND ASSOCIATED

POWER CABLING BACK TO SOURCE. EXISTING TIME CLOCKS

DEDICATED TO POLE-MOUNTED LUMINARIES SHALL BE

DEMOLISHED.

2. EXISTING UNDERGROUND CONDUIT SHALL BE ABANDONED

IN PLACE.

3. VERIFY EXISTING NETWORK OF (2) 2" EMPTY UNDERGROUND

CONDUITS TO BE USED FOR THIS PROJECT. APPROXIMATE

CONDUIT AND HANDHOLE LOCATIONS ARE SHOWN.

EXISTING POLE

NOTE 1 & 2

EXISTING HANDHOLE

NOTE 3

N

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITSEXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

OBSCURED AREA

(SIGN)

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

AeccDbCogoPoint (AeccLand130)

BRICK

CONC.

CONCRETE

WALL

SY

L

SY

L

ASPHALT

XM

L12

L10L11

LP1

LP-EXT: CKT. NO. 1

L13L11

LP9

LP-EXT: CKT. NO. 17

L11L13

LP8

LP-EXT: CKT. NO. 15

HH-LP8

XM

XM

XM

XM

XM

XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-2

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

LAYOUT PLAN

E-201 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTES:

1. LIGHT POLE HANDHOLES SHALL BE INSTALLED WITHIN 1 TO

2 FT (OR AS CLOSE AS PRACTICAL) FROM LIGHT POLE BASE.

HANDHOLES SHALL BE LOCATED IN NON-ROADWAY

LOCATIONS WHENEVER POSSIBLE.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FROM DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT.

3. THE EXISTING UNDERGROUND CONDUIT ROUTING IS BASED

ON AS-BUILT DRAWINGS PROVIDED BY THE MBTA AND A

FIELD INVESTIGATION OF EXISTING HANDHOLES. THE

CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION

OF THE EXISTING CONDUITS AND HANDHOLES.

N

C002B

(1) CONDUIT USED, (1) SPARE

NOTE 4 (TYPICAL)

EXISTING (2) 2" EMPTY

CONDUITS

C002C

(1) CONDUIT USED, (1) SPARE

C002D

(1) CONDUIT USED, (1) SPARE

C002E

(1) CONDUIT USED, (1) SPARE

C002H

C002F

(1) CONDUIT USED, (1) SPARE

C002G

(1) CONDUIT USED, (1) SPARE

EXISTING (2) 2" EMPTY

CONDUITS

NOTE 1

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Line dhurson Line dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDINGEXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

AeccDbCogoPoint (AeccLand130)

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC.

BRICK

BRICK

CONC.

CONC.

CONC.

CONC.

CONC.

TRANS.

LSA

LSA

LSA

BRICK

CONC.

CONC.

CONCRETE

WALL

BRICK

AeccDbCogoPoint (AeccLand130)

CONC.

CONCRETE

WALL

HANDHOLEHANDHOLE

UTILITY VALVE

AREA

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

CONC. PAD

W/ MECHANICAL

UNIT

SYL

SY

L

18' AFF

8' AFF

18'

AFF

18' AFF

8' AFF

18' AFF

18' AFF

18' AFF 18' AFF 18' AFF 18' AFF 18' AFF 9' AFF

11' AFF

8' AFF

11' AFF

18' AFF

8' AFF

18' AFF

8' AFF

18' AFF

18' AFF

8' AFF

18' AFF 18' AFF 18' AFF 18' AFF 18' AFF 18' AFF18' AFF

L11

LP7

LP-EXT: CKT. NO. 13

HH-ELEC

L10

L11

XM

XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-2

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

N

LAYOUT PLAN

E-202 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTE 3 (TYPICAL)

C013

LP-EXT:CKT. NO. 8

E-204

C010

LP-EXT:CKT. NO. 2

C012

LP-EXT:CKT. NO. 6

C011

LP-EXT:CKT. NO.4

NOTES:

1. NEW EXTERIOR WALL MOUNTED FIXTURES SHALL BE

PROVIDED WITH A NEW JUNCTION BOX INSIDE THE

BUILDING, NEW MOUNTING BRACKET, AND NEW

WEATHERPROOF SEALANT FOR A WATERTIGHT

INSTALLATION.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FROM DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT.

3. NEW BUILDING WALL-MOUNTED FIXTURES TO BE LOCATED

AT OR IMMEDIATELY ADJACENT TO DEMOLISHED FIXTURE

LOCATIONS. NEW FIXTURES TO BE PROVIDED WITH NEW

CONDUIT AND CONDUCTORS AS INDICATED. ELEVATIONS

ARE APPROXIMATE - NEW FIXTURE HEIGHTS SHALL MATCH

THE EXISTING FIXTURES.

4. THE EXISTING UNDERGROUND CONDUIT ROUTING IS BASED

ON AS-BUILT DRAWINGS PROVIDED BY THE MBTA AND A

FIELD INVESTIGATION OF EXISTING HANDHOLES. THE

CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION

OF THE EXISTING CONDUITS AND HANDHOLES.

5. VERIFY THE EXACT LOCATION WHERE THE SPARE

UNDERGROUND CONDUITS TERMINATE. THE ELECTRICAL

CONTRACTOR SHALL INCLUDE TEST PITS OR GROUND

PENETRATING RADAR TO IDENTIFY THE EXACT LOCATION

WHERE THE CONDUITS END. THE ELECTRICAL

CONTRACTOR SHALL PENETRATE THE EXTERIOR WALL AND

EXTEND THE EXISTING UNDERGROUND CONDUITS TO THE

NEW CONDUIT ROUTING WITHIN THE BUILDING.

6. THE (2) EXISTING EXTERIOR CONDUITS ARE STUBBED UP

OUTSIDE THE BUILDING. THE ELECTRICAL CONTRACTOR

SHALL PENETRATE THE EXTERIOR WALL AND EXTEND THE

EXISTING UNDERGROUND CONDUITS TO THE NEW CONDUIT

ROUTING WITHIN THE BUILDING.

C002G

(1) CONDUIT USED, (1) SPARE

EXISTING (2) 2" EMPTY

CONDUITS

NOTE 4 (TYPICAL)

NOTE 1 (TYPICAL)

E-401

NOTE 5

C002B

(1) CONDUIT USED, (1) SPARE

C002A

LP-EXT:CKT. NO. 1

LP-EXT:CKT. NO. 13

LP-EXT:CKT. NO. 15

LP-EXT:CKT. NO. 17

C003A

LP-EXT:CKT. NO. 3

LP-EXT:CKT. NO. 5

LP-EXT:CKT. NO. 7

LP-EXT:CKT. NO. 9

LP-EXT:CKT. NO. 11

E-401

NOTE 6

C003B

(1) CONDUIT USED, (1) SPARE

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Callout Work in the switchboard dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

AeccDbSurfaceContourLabeling (AeccLand130)

OBSCURED AREA

(VEHICLES)

OBSCURED AREA

(VEHICLES)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

ASPHALT

ASPHALT

ASPHALT

ASPHALT

CONC. CONC.

CONC.

CONC.

BRICK

LSA

BRICK

AeccDbCogoPoint (AeccLand130)

ASPHALT

ASPHALT

ASPHALT

CCCC

CC

CONCRETE

WALL

BC

BC

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

HANDHOLE

SY

L

SY

L

SY

L

SY

L

SY

L

SY

L

L11

LP6

LP-EXT: CKT. NO. 11

L10

L12

L11

LP5

LP-EXT: CKT. NO. 9

HH-LP5

L10

L10 LP4

LP-EXT: CKT. NO. 7

L10L12

LP3

LP-EXT: CKT. NO. 5

L12L12

HH-LP2

LP2

LP-EXT: CKT. NO. 3

L12

XM

XM

XMXM

XM

XM

XM

XM XM XM XM

APPROVED BY:

ISSUE DESCRIPTION BY Program Manager

VERT:

HORIZ:

DATE:

Date

DES. BY DR. BY CHK. BY

SHEET

PLAN

NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION

AUTHORITY

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

ALBANY BUS FACILITY

CONTRACT NO. Z94PS09

ALBANY BUS FACILITY

DATE CHKD. APP.

841 Worcester Road Suite 163 Natick, MA 01760 Tel: 617.548.9469

BUS FACILITY MODERNIZATION PROGRAM

C :\U

SE

R

S\

KM

AY

\O

N

ED

R

IV

E

- H

W

LO

C H

N

ER

.C O

M \D

O C

U M

EN

TS

\P R

O

JE

C

TS

\V H

B M

BT

A\

AL

BA

N Y

AN

D

C

AB

O T

BU

S

YA

R

D L

IG

H

TI

N

G \S

H

EE

TS

\A

LB

AN

Y\

AL

BA

N

Y

- E

-2

E-

3.

D W

G

FI

LE

N

AM

E:

LAYOUT PLAN

SCALE: 1" = 20'

LAYOUT PLAN

E-203 0 07/13/2026

AS SHOWN

NONE DH KM KF

NOTE 1

N

NOTES:

1. LIGHT POLE HANDHOLES SHALL BE INSTALLED WITHIN 1 TO

2 FT (OR AS CLOSE AS PRACTICAL) FROM LIGHT POLE BASE.

HANDHOLES SHALL BE LOCATED IN NON-ROADWAY

LOCATIONS WHENEVER POSSIBLE.

2. APPROXIMATE UNDERGROUND CONDUIT ROUTING HAS

BEEN PROVIDED FROM DIAGRAMMATIC PURPOSES.

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATION OF

ALL UNDERGROUND UTILITIES BEFORE EXCAVATION

BEGINS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING

WORK. ANY DAMAGE TO EXISTING UTILITIES LOCATED IN

THE FIELD, OR AS A FAILURE TO CONTACT THE

APPROPRIATE UTILITY COMPANY, SHALL BE

REPAIRED/REPLACED AT NO ADDITIONAL COST TO THE

CLIENT.

3. THE EXISTING UNDERGROUND CONDUIT ROUTING IS BASED

ON AS-BUILT DRAWINGS PROVIDED BY THE MBTA AND A

FIELD INVESTIGATION OF EXISTING HANDHOLES. THE

CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION

OF THE EXISTING CONDUITS AND HANDHOLES.

C003G

(1) CONDUIT USED, (1) SPARE

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

EXISTING (2) 2" EMPTY

CONDUITS

C003H

(1) CONDUIT USED, (1) SPARE

C003I

(1) CONDUIT USED, (1) SPARE

C003D

(1) CONDUIT USED, (1) SPARE C003F

(1) CONDUIT USED, (1) SPARE

C003C

(1) CONDUIT USED, (1) SPARE

C003E

(1) CONDUIT USED, (1) SPARE

C003B

(1) CONDUIT USED, (1) SPARE

NOTE 3 (TYPICAL)

0 07/13/2026 ISSUED FOR CONSTRUCTION DH KF CC

dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Rectangle dhurson Text Box Revenue hour work dhurson Text Box Non-Revenue hour work dhurson Text Box These sketches are intended to show general intent of work areas accessible to the contractor during revenue hours and non-revenue hours.

During construction, ongoing coordination will be required with MBTA Operations and Vehicle Maintenance for site accessibility.

dhurson Text Box Revenue hours: 5:00AM - 9:00PM (weekdays) Non-revenue hours: 9:00PM - 5:00AM (weekdays) and weekends (Friday at 9:00PM to Monday at 5:00AM) dhurson Rectangle dhurson

Sheets and Views
G-001 - TITLE SHEET-INDEX
plot1_2
plot

File details come from the government source that posted it. Updated .