CA ERFO NF 23N18 1 Plans and Xsections.pdf
PDF 13 MB Posted
- Attached to
- CA ERFO PLUMAS NF 23N18(1), Frazier Creek Bridge
- Solicitation number
- 6982AF22B000029
About this file
This document provides details for a federal contract opportunity to replace the Frazier Creek Bridge in Plumas National Forest in Plumas County, California. The solicitation is for replacing the bridge that was damaged by fire in 2020 with a prefabricated steel bridge under solicitation number 6982AF22B000029 from the Department of Transportation Federal Highway Administration. In addition to replacing the bridge, the project scope includes reconstructing up to 150 feet of roadway approaches on either end of the new bridge and asphalt overlay of the bridge and short roadway sections to reduce sediment runoff into the nearby stream. The prefabricated steel bridge, bridge rail, guardrail and terminals are required to be furnished and installed under this contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DARRELL
PEREIRA
Digitally signed by DARRELL
PEREIRA
Date: 2022.08.05 20:02:25 -07'00'
LEONARD
JOB
Digitally signed by LEONARD
JOB
Date: 2022.08.23 08:52:21 -08'00'
CURTIS R
SCOTT
Digitally signed by CURTIS R
SCOTT
Date: 2022.08.30 14:56:37 -06'00'
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created SJS
CONTROL SHEET
3/28/22
NO.
SHEET
PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:4
A
M
A u g u s t
B a s e .B
.U S
C
O R
D V
.1
\O p e n R o a d s D e s ig n e r
C E
\C o n fi g u ra ti o n \O rg a n iz a ti o n -C iv il
\F L
H S u rv
F t_
S ta n d a rd s -W
S .1
V \C e ll
\C F
L -B o rd e rs
.c e l
STATE PROJECT
NUMBER
SHEET
CA
ERFO PLUMAS NF 23N18(1)
A4
FRAZIER CREEK BRIDGE
Sheet and Description
B3 B4 S2 Grading and Surfacing Summary
Misc.
Summary
Frazier Creek Bridge
Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 0.047 0.003 0.050
A0060 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0080 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 0.094 0.006 0.100
A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.36 0.04 0.40
A0200 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 576 29 605
A0220 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0240 20401-0000 ROADWAY EXCAVATION CUYD 234 26 260
A0260 20820-0000 DEWATERING LPSM ALL
A0280 25101-2500 PLACED RIPRAP, METHOD B,
CLASS 5 CUYD 170 20 190
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(ROADWAY APPROACHES) TON 237 13 250
A0320 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 152 6 158
A0340 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 19 19
A0360 55401-1000 REINFORCING STEEL LB 1,700 1,700 Contract Quantity
A0380 55504-0000 PRE-FABRICATED STEEL BRIDGE
(20'x52') LPSM All ALL
A0400 57404-0000 GEOSYNTHETIC REINFORCED SOIL
- INTERGRATED BRIDGE SYSTEM SQFT 2,350 190 2,540
A0420 61701-4150 GUARDRAIL SYSTEM CRG, TYPE 2,
CLASS B LNFT 25 25
A0440 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 2 2
A0460 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 2 2
A0480 61707-0000 STRUCTURE TRANSITION RAILING LNFT 50 50 Contract Quantity
A0500 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 20
A0520 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 20
MileStone: 100% Estimate Date Completed: 08/04/22 Report Date: 08/04/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 4-
A ug
-2
:1
PM
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
C A\ er fo n1
8( 1)
\R oa dw ay
\C
AD
D _S he et s\ B -S um m
SO
Q _1
_E R
FO
N
.x ls m
]S he et
STATE PROJECT
B1
ERFO PLUMAS 23N18(1)
FRAZIER CREEK BRIDGECA
SHEET
NUMBER
Sheet and Description
B3 B4 S2 Grading and Surfacing Summary
Misc.
Summary
Frazier Creek Bridge
Allowance Bid Schedule
A0540 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
A0560 62201-2750 MOTOR GRADER HOUR 20
A0580 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
A0600 62301-0000 GENERAL LABOR HOUR 20
A0620 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 20
A0640 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A0660 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 226 14 240
A0680 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 226 14 240
A0700 62520-0000 FERTILIZER ACRE 0.047 0.003 0.050
A0720 63502-0600 TEMPORARY TRAFFIC CONTROL, Warning Light Type B
BARRICADE TYPE 3 included in the pay
EACH 4 4 item
A0740 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 45 45
A0760 63701-0000 FIELD OFFICE EACH 1
4- A ug
-2
:1
PM
MileStone: 100% Estimate Date Completed: 08/04/22 Report Date: 08/04/22
N
C A \e rf o2
3n
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
SO
Q _1
_E R
FO
N
.x ls m
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B2CA
SHEET
NUMBER
ERFO PLUMAS 23N18(1)
FRAZIER CREEK BRIDGE
5,210
5,205
5,200
5,195
5,190
5,185
5,180
36’ VC
V P I
E L
,2
.8
E L
,1
.7
V P I
63’ VC
1"= 10’-0"
N
Q
Q100
HYDRAULIC DATA
Q
Q200
(cfs)
Q
(ft/s)
V
(ft)
El.WS
(ft)
Scour El.
Drawing No. Description
BRIDGE DRAWING INDEX
BRIDGE PLAN & ELEVATIONRG3244-A
RG3244-B
RG3244-C
RG3244-F
RG3244-D
RG3244-G
TYPICAL SECTION
RG3244-E
GENERAL NOTES & ESTIMATE
RG3244-H
RG3244-I
RG3244-J
Length of Bridge = 54’-0"
F r a z ie r C r e e k
K. EIKERMANN
B. ROBINSON
K. EIKERMANN
A1 12
S1
El. 5200.60 Sta. 2 +38.00 Begin Bridge
El. 5200.06 Sta. 2+92.00 End Bridge
P C
.0
P T
.5
C Rdwy.L
Elevations are at profile grade @ C Rdwy.
No Scale
PROFILE GRADE DIAGRAM
L
-1.000%
+8.
1%-3.407%
PLAN
" = 50’-0"2 116 spa. @ 3’-1
Bridge Railing Post spa. (typ. both sides)
2’-0" 2’-0"
El. 5200.60
Gutterline
(typ.)
El. 5200.60
Horiz. Curve Data: Horiz. Curve Data:
El. 5200.06
El. 5200.06
(typ. @ all 4 corners).
Structure transition railing
S ta
.0
B e g in B r id g e
S ta
.0
E n d B r id g e
BRIDGE PLAN AND ELEVATION
7.4
10.3
10.7
11.1
5189.0
5191.1
5191.5
5192.0
5180.3
5180.1 min. of 3 feet of freeboard above 100 year water surface elevation.
Hydraulic capacity requirements: Bridge low chord provides a
= 5192.1 (measured at 18 feet upstream of bridge).
100 year water surface elevation used to determine freeboard at upstream face of bridge.
Note: Average velocities and water surface elevations are reported established by CFL survey.
coordinates using local datum Note: Elevations are based on assumed
FOUNDATION PLAN
SUMMARY OF BORING LOGS
TRANSITION RAILING
REBAR LIST
S. BELCHER
WINGWALL D
WINGWALL C
WINGWALL A
WINGWALL B
W in g (t yp
’-0
(typ.)1
Q100 WS El. = 5192.1
ABUT. 2
EXP
EXP
ABUT. 1
Grade = -1.00%
@ C Rdwy.
Approx. existing ground
L decking with asphalt pavement fill.
steel girders and structural steel
Modular steel bridge with
Profile grade
(as required).
Bolted field splice railing
Thrie Beam bridge in place (typ.).
footings to remain Existing concrete
El. 5180 (typ.)
(RSF)
Reinforced Soil Foundation
ELEVATION
El. 5199.33
El. 5196.00
(Abut. 1 and 2)
(Abut. 1 and 2)
5,175
GRS FOUNDATION PLAN
GRS WALL ELEVATION
GRS WALL SECTIONS
RG3244-K
RG3244-L
top of asphalt wearing surface.
Note: Deck elevations shown are at
(typ.).
GRS retaining wall
(typ.).
GRS retaining wall
RIPRAP
ABUTMENTS
El. 5196.82 Low chord for details.
(typ.). See RG3244-E Method B, Class 5 Placed Riprap, NO.
PROJECTSTATE
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS
BY
DATENO.
REVISIONS
N
C A \e r f o n (1
B r id g e \R
G \C
A D
F il e s \D
G N
F il e s \r g p e .d g n
RG3244-
CA
KARL EIKERMANN
U.S. DEPARTMENT OF TRANSPORTATION
of
FS DRAWING R-1704
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
PLUMAS NATIONAL FOREST
PLUMAS COUNTY, CALIFORNIA
NONE
S2
BB. ROBINSON
GENERAL NOTES & ESTIMATE
K. EIKERMANNS. BELCHER 2 12
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g g n .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
BH21-03
C Rdwy.L in place (typ.).
footings to remain Existing concrete
P T
.5
P C
.0
BH21-02
Horiz. Curve Data:Horiz. Curve Data:
N in place (typ.).
footings to remain Existing concrete be removed (typ.).
abutment walls to Existing timber
@ C Rdwy.
Approx. existing ground
L El. 5180 (typ.)
ELEVATION
5,205
5,200
5,195
5,190
5,185
5,180
Q100 WS El. = 5192.1
Grade = -1.00%
(typ.).
Method B, Class 5 Placed Riprap, F r a z ie r C r e
’-0
1"= 10’-0"
FOUNDATION PLAN
FOUNDATION PLAN
FOUNDATION NOTES:
Location
Abut. 1
FOUNDATION TABLE
Abut. 2
Bearing Pressure
Max. Factored
Sta. 2+92.00 End Bridge
El. 5194.06
51’-0"
S ta
.5
A b u t.
C B r g
3’-0"
(typ.)
(typ.)
ty p ty p
B. ROBINSON
1’-6"1’-6"
El. 5196.00
(Abut. 1 and 2)
(RSF)
Reinforced Soil Foundation
(typ.)1
El. 5199.33
(Abut. 1 and 2)
ABUT. 2ABUT. 1
TIMBER ABUTMENT
TOP CONCRETE FOOTER
7.0 kips/sq. ft. (Strength I)
7.0 kips/sq. ft. (Strength I)
S. BELCHER C3 12
(typ.).
GRS retaining wall
(typ.).
GRS retaining wall
WINGWALL D
WINGWALL B
WINGWALL A
WINGWALL C
El. 5194.60
5,175 grade Finished details.
RG3244-E for (typ.). See Method B, Class 5 Placed Riprap, (typ.)
El. 5195.0 walls.
timber abutment superstructure and Remove existing
S3
K. EIKERMANN
Sta. 2 +38.00 Begin Bridge
S ta
.5
A b u t.
C B r g
L L
Colorado.
Lands Highway Division, Geotechnical Services Branch, Lakewood, Transportation, Federal Highway Administration, Central Federal
Creek Bridge, dated May 2022, prepared by U.S. Dept. of
For additional information see Final Geotechnical Report, Frazier
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g f o u n d a ti o n .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
PLUMAS NATIONAL FOREST
PLUMAS COUNTY, CALIFORNIA
TIMBER ABUTMENT
TOP CONCRETE FOOTER
TYPICAL TEST HOLE LOG
Boring No.
Location
Unified Soil Classification
Practical refusal SPT
Core Run
% Core Recovery Shaded
Ground Water
Depth at time of drilling (ATD)
Graphic material description
Depth Terminated
RQD
x x x
Elev.
with AASHTO T206 test (SPT) in accordance standard penetration
Blow count per foot with
LEGEND
TYPICAL TEST
HOLE SYMBOL
Plan View
Approximate location of any sampled hole
BH21-03 BH21-02
El. 5200.06 Sta. 2+92.00 End Bridge
C Rdwy.L
P T
.5
El. 5200.60 Sta. 2 +38.00 Begin Bridge
F r a z ie r C r e
N
PLAN
ELEVATION
SUMMARY OF BORING LOGS
1" = 10’-0"
5,205
5,200
5,195
5,190
5,185
5,180
5,175
5,170
5,165
5,160
5,155
5,195
5,190
5,185
5,180
5,175
5,170
BH21-02BH21-03
STA 2+20, 2ft. RT STA 3+07, 2ft. RT
5,200
P C
.0
Asphalt
0.3
0.3
D
S4
5200.3
5153.3
5199.8
Fill residual soil weathered to completely Granite (DG), Decomposed formational bedrock to very strong rock, Granite, strong rock dense to dense
Silty Sand, medium
5172.8
RQD
WINGWALL D
WINGWALL A
WINGWALL B
WINGWALL C
4 12
Geotechnical Services Branch, Lakewood, Colorado.
Federal Highway Administration, Central Federal Lands Highway Division, Creek Bridge, dated May 2022, published by U.S. Dept. of Transportation, For additional information see Final Geotechnical Report, Frazier
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g b o r in g s .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
PLUMAS NATIONAL FOREST
PLUMAS COUNTY, CALIFORNIA
Horiz. Curve Data: Horiz. Curve Data:
P C
.0
El. 5200.06 Sta. 2+92.00 End Bridge
C Rdwy.L
F r a z ie r C r e
El. 5200.60 Sta. 2 +38.00 Begin Bridge
El. 5195.0
(typ.)
SECTION B-B
B B
RIPRAP PLAN
1"= 10’-0"
(Abutment 2 shown, Abutment 1 similar)
W in g (t yp .)20
’-0
Sta. 2+92.00 End Bridge
(typ.).
Method B, Class 5 Placed Riprap, of the CO (typ.)
Class 4 upon approval abutments may be Riprap in front of
WINGWALL D
WINGWALL C
WINGWALL A
WINGWALL B
S5
K. EIKERMANN S. BELCHER
B. ROBINSON
S. BELCHER
E5 12
(typ.).
GRS retaining wall
Class 5.
Method B, Placed rirap, SECTION A-A
(Abutment 2 shown, Abutment 1 similar) in place.
footings to remain Existing concrete
A A of the CO (typ.)
Class 4 upon approval abutments may be Riprap in front of fabric Class 1, Type C.
Non-woven geotextile fabric Class 1, Type C.
Non-woven geotextile
RIPRAP
25’-0"
5’-0"
P T
.5 ty p
U S ty p
D S
(typ.)
Toe of slope
5’-0"
(typ.)
in place (typ.).
footings to remain Existing concrete
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g r ip r a p .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
PLUMAS NATIONAL FOREST
PLUMAS COUNTY, CALIFORNIA
PT 2+37.58
"= 1’-0" 16
WINGWALL A
WINGWALL B
LC Rdwy.
K. EIKERMANN B. ROBINSON
Soil Foundation (RSF)
Limits of Reinforced
G R S W in g w a ll A
GRS FOUNDATION PLAN
GRS FOUNDATION PLAN
(ABUTMENT 1 SHOWN, ABUTMENT 2 SIMILAR)
S6
F
’-0
" G R S W in g w a ll B
13’-6"13’-6"
27-0" GRS Abutment wall
30°
Sta. 2+92.00
End Bridge
Sta. 2+38.00
Begin Bridge
(t y p
3’-0" (typ.)
(typ.)
S. BELCHER
s te p ty p w in g
30°
15’-0"
6 12 w a ll t o p o f of w all) bott.
o f w a ll b o tt wall unit (typ.)
nominal segmental retaining 8" x 1’-0" x 1’-6" (HxWxL)
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g g r s w a ll .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
L
0%
"= 1’-0" 16
C Bridge & C Rdwy.L
El. 5180.0
ELEVATION - GRS WALL
S7
G
B A
B A
K. EIKERMANN B. ROBINSON
GRS WALL ELEVATION
(ABUTMENT 1 SHOWN, ABUTMENT 2 SIMILAR)
El. 5199.33
Abut. GRS wall)
El. 5196.00 (Top of
(Measured along wingwall face) (Measured along wingwall face)
El. 5195.0
El. 5199.33
El. 5195.0
S. BELCHER
20’-0" GRS Wingwall B 27’-0" GRS Abutment wall 20’-0" GRS Wingwall A
13’-6" 13’-6"
(typ.)
Concrete earwall step (typ.)
4’-6" wing
7 12
GRS WALL NOTES:
(top of riprap)
Finished grade
Alternate Foundation Detail for Bedrock.
Note: See RG3244-H for Section A-A & B-B, and Abutment 2
P a y L im it f o r G
R S W a ll
Pay limits for GRS wall
Geosynthetic reinforcement 3’-0" min.
Geosynthetic reinforcement. Overlap fully encapsulated on all sides with
Compacted GRS open-graded backfill
Reinforced Soil Foundation (RSF).
material to CO for approval.
with polyurethane construction adhesive. Submit proposed
5. Secure the top 3 rows of segmental retaining wall units
4. Provide GRS open-graded backfill per subsection 704.13.
3. Provide geosynthetic reinforcement per subsection 714.06.
2. Provide segmental retaining wall units (SRWU) per subsection 720.01.
and AASHTO LRFD Bridge Design Specifications.
1. Design GRS Wall per Section 574 of Special Contract Requirements wall unit (typ.)
nominal segmental retaining 8" x 1’-0" x 1’-6" (HxWxL)
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g g ll .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
"= 1’-0" 16 p e r c o u r s e s p a
K. EIKERMANN B. ROBINSON H
S8 Top of Rdwy.
to remain in place
Existing concrete footing
SECTION A-A
p e r c o u r s e
SECTION B-B
El. 5180.0 El. 5180.0
L
El. 5196.00
El. 5199.33 of Section A-A & B-B.
Note: See RG3244-G for the location
6’-0" 3’-0"
15’-0"
3’-0"
15’-0"
El. 5194.06 (Abut. 2)
El. 5194.60 (Abut. 1)
S. BELCHER
Begin or End Bridge
Finished grade
Bridge.
Rt. of C ground @ 15’ existing
Approx.
Concrete abutment s p a ty p
RSF conflicts with existing concrete footings.
Note: Notify CO and geotechnical engineer if
2’-0"3’-0" s p a
El. 5200.60 (Abut. 1)
El. 5200.06 (Abut. 2)
GRS WALL SECTIONS
s p a ty p ty p
" 6 b e y o n d c u t s lo p e
Z o n e e x te n d
I n te g r a te d A p p r o a c h b y o n d c u t s lo p e
Z o n e e x te n d
I n te g r a te d A p p r o a h
Finished grade
8 12
GRS open-graded backfill
GRS open-graded backfill
FOUNDATION NOTES:
12’-0" excavated.
location as
Actual bedrock b e d r o c k in to u n d is tu r b d m in e m b e d
1’-0" min.
GRS open-graded backfill
ABUTMENT 2 ALTERNATE FOUNDATION DETAIL FOR BEDROCK
GRS open-graded backfill structure excavation
Est. limits of structure excavation
Est. limits of ground existing
Approx.
2’-0" ratio speciifed cannot be obtained.
will be open more than 30 days or if the required if the short term back slope
Subpart P Excavation). Shoring may be
Safety Regulations (29CFR, Part 1926, Note: Short term back slope ratio per OSHA
Geosynthetic reinforcement 3’-0" min.
Geosynthetic reinforcement. Overlap fully encapsulated on all sides with
Compacted GRS open-graded backfill
Reinforced Soil Foundation (RSF).
reinforcement (typ.).
Geosynthetic reinforcement layer (typ.).
Intermediate geosynthetic
G e o s y n th e ti in fo r c e m e n t s p a
G e o s y n th e ti in fo r c e m e n t s p a
Geosynthetic reinforcement 3’-0" min.
Geosynthetic reinforcement. Overlap fully encapsulated on all sides with
Compacted GRS open-graded backfill
Reinforced Soil Foundation (RSF).
reinforcement (typ.).
Geosynthetic reinforcement layer (typ.).
Intermediate geosynthetic or GRS open-graded backfill.
Leveling pad. Item 614 lean concrete reinforcement layers.
SRWU and geosynthetic bottom for placement of Provide level surface at Limits of rock excavation.
GRS open-graded backfill reinforcement (typ.).
Geosynthetic in pay item for GRS wall 57404-0000.
GRS open-graded backfill when required shall be included placement of Alternate Foundation and 614 lean concrete or
3. Payment for excavation and removal of material required for subsection 208.08(a) of SCR’s.
can not be met. See Alternate Foundation Detail and backfill where RSF embedment into bedrock requirements
2. Provide Item 614 lean concrete or GRS open-graded
Alternate Foundation Detail as shown.
1. If bedrock is encountered above El. 5177.0 provide wall unit (typ.). Slope nominal segmental retaining 8" x 1’-0" x 1’-6" (HxWxL) wall unit (typ.). Slope nominal segmental retaining 8" x 1’-0" x 1’-6" (HxWxL) retaining wall units (SRWU) Front face of segmental
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g g ll .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
PT 2+37.58
ABUTMENT PLAN
(Abut. 1 Shown, Abut. 2 Similar)
ABUTMENT ELEVATION
(Abut. 1 Shown, Abut. 2 Similar)
Begin or End Bridge
L
Geocomposite sheet drain with
Class 2, Type C geotextile.
Attach to wall per manufacturer’s instructions.
10"
L
SECTION A-A
C Brg.L
Top of Rdwy.
3’-0"
1’-6"1’-6" w/ drain grate C 3" Ø weephole c lr
#4E2 (8 tot.)
-2% m in
1’-3" min. lap splice
#4A1 w/
#5A4 (4 tot.)
#5A2 (4 tot.)
#4E1 b.f.
#4A3 b.f. = Both faces o.f. = Other face f.f. = Fill face
ABBREVIATIONS:
ABUTMENTS
C Brg. & C Abut.L L
Elastomeric bearing pad
& anchor bolts per prefabricated bridge manufacturer (typ.).
Fill Face sheet drain.
Geocomposite
C Rdwy.L
11"10’-1"10’-1"11"
11’-0"11’-0"
#4E1 (typ.)
4-#5A4#4A3 b.f.
A
#4E2 b.f.
Top of Rdwy.
C Rdwy.L
6"3" 3"6"
A
3"
C Abutment
Scale: 38" = 1’-0"
El. 5200.06 (Abut. 2)
El. 5200.60 (Abut. 1)
Sta. 2+92.00
End Bridge
Sta. 2+38.00
Begin Bridge
El. 5194.06 (Abut. 2)
El. 5194.60 (Abut. 1)
Weephole spa.
11"10’-1"10’-1"11"
2-#4A1 (typ.)
4-#5A2
3"
2-#4A1 spa.
3’-0"3’-0" prior to ordering materials and constructing abutments.
* Final dimensions & elevations to be coordinated with bridge manufacturer
3’-0" 3’-0"
"1
B
B
Geocomposite sheet drain with
Class 2, Type C geotextile.
Attach to wall per manufacturer’s instructions.
10"
SECTION B-B
#4E4 (6 tot.)
#4E3
Scale: 38" = 1’-0"
(6 tot.)
#4E4
20 spa. @ 1’-0" = 20’-0"9" 9"
20 spa. @ 1’-0" = 20’-0", #4E1
= 2’-3" @ 9" 3 spa.
3"
#4E5 (2 tot.)
#4E3 spa.
#4E3 b.f. (typ.)
#4E4 b.f. (typ.)
#4E5 b.f.
c lr
S. BELCHER S. BELCHER
ty p
4’-0" 2 spa. @ 8’-6" = 17’-0" 4’-0"1’-6" 1’-6"
2% C 3" Ø weephole w/ drain grate L
Face
Fill
Other Face
I
K. EIKERMANN 9 12
S9
UNLESS NOTED
" = 1’-0"4
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g a b u t.
d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
TYPICAL SECTION
L
Steel railing post (typ.)
0%
C Bridge
Side dam (typ.)
TYPICAL SECTION
splice at diaph.
Optional field bolted
TL-2 rating min.
(10 ga. galvanized) (typ.)
Thrie-Beam Bridge Railing
1’-0" 1’-0"4 spa. @ 4’-6" = 18’-0" m a x
"4 1310’-0" 10’-0""4
Diaphragm (typ.)
Structural Steel girder (typ.).
Rolled steel
L e m b e d prior to ordering materials and constructing abutments.
* Final dimensions & elevations to be coordinated with bridge manufacturer pads per bridge manufacturer.
and elastomeric bearing
Anchor bolts, bearing plates, Bridge Railing
Thrie Beam
Begin or
End Bridge gdr. clearance 1" min.
TYPICAL SECTION @ ABUTMENT
m in to W-beam.
railing. Thrie Beam
Structure transition
2" gap
10" endwall
1’-6" 1’-6"
Asphalt pavement
End guard angle
C Brg.
decking (galvanized)
Structural steel decking crest.
" depth above steel 8 corrugations to provide
Asphalt pavement. Fill
Gdr./Prefab Bridge Length = 52’-0"
NOTES:
K. EIKERMANN
B. ROBINSON
K. EIKERMANN
GRS wall
JS. BELCHER
steel decking
Galvanized
10 12
S10 pay item 40301-0100.
Asphalt pavement and tack coat on bridge deck is included in asphalt lifts.
Apply tack coat to entire steel deck surface and between of all foreign material.
Prior to application of tack coat, clean steel decking surface
" = 1’-0"
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g ty p ic a l.
d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
TYPICAL PLAN VIEW
TYPICAL ELEVATION VIEW
B
3 Spaces 3’-1 �"
1"
6’-3" Non-Symmetrical
Transition to W-Beam
W-Beam
6’-3"
B
37 �"
Rail Section of Splice
Center line
9’- 4 �"
A
A
Direction of Traffic
6’-3"
NON-SYMMETRICAL(10 GA.)
TRANSITION SECTION
37 �"
(10 GA.) ELEMENT SECTION
THRIE-BEAM (3’- 1 �")
bolts w/washers.
Button head splice
12 ~ �" Dia. x 1 �"
8"
6"
CL
W6 x 8.5
W6 X 9.0 or
4 �
1"
STEEL POST & BLOCK
(Showing Standard Block)
SECTION B-B
SECTION A-A
This post location requires a Thrie-Beam
Block (6"x 8"x 22" Nom).
Standard Block
(6"x 8"x 14" Nom)
Low Speed Transition
Button head splice bolts
12 ~ �" Dia. x 1 �"
Button head splice bolts
8 ~ �" x 1 �" nut.
post bolt with washer and
1~ �" Top button head
GENERAL NOTES
TRANSITION RAILING
Bridge
Bridge
Prefabricated Bridge) (included with Pay Item for
Limit of Steel Bridge Railing
End Bridge Begin or
12’-6" Pay Length for Stucture Transition Railing See Roadway Plans for Approach Railing
NONEK. EIKERMANN S. BELCHERB. ROBINSON
Beam Transition TL-2 Mash Compliant, GF(31) TL2-19".
7. Transition is adapted from TxDOT low speed transition "Metal Beam Guard Fence Thrie
6. Fabricate and construct railing to the horizontal and vertical alignment of the roadway.
5. Posts shall not be set in concrete, of any depth.
4. Material for steel posts shall conform to ASTM A36, and shall be galvanized after fabrication.
galvanized.
Washers shall conform to ASTM F436, Type 1. All attachment hardware shall be
3. Button head bolts shall conform to ASTM A307. Nuts shall conform to ASTM A563.
" double recessed nuts.8 5" with 4
1" x 18 5 Button head "splice" bolts are thickness of the nut and the washer and not more than 1" beyond it.
2. Button head "post" bolts shall be of sufficient length to extend through the full
1. Rail elements shall meet the requirements of AASHTO M180, Type I, Class B.
S11
K11 12
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g r a il .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
NOTES
ABBREVIATIONS:
b.f. = Both faces o.f. = Other face f.f. = Fill face
NONEB. ROBINSON
S12
Dimensions in bending diagrams are out-to-out of bars.1.
B. ROBINSON K. EIKERMANN L
REBAR LIST
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
ABUTMENTS
V or N
9217 0’-3" 1’-9" 2’-8" 1’-9"6’-2"#4A1 3794 Stirrups
8STR 21’-8"21’-8"#5A2 1815 Horiz. bot.
4STR 21’-8"21’-8"#4A3 584 Horiz. b.f.
82 0’-3�" 0’-10" 21’-8" 0’-10"23’-4"#5A4 1955 Horiz. top
812 LBSSUBTOTAL
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
ENDWALLS
V or N
5017 0’-3" 4’-8" 0’-6" 4’-8"9’-10"#4E1 3284 Stirrups
16STR 22’-0"22’-0"#4E2 2354 Horiz. b.f.
32STR 5’-7"5’-7"#4E3 1194 Vert. b.f.
48STR 4’-2"4’-2"#4E4 1344 Horiz. b.f.
82 0’-3" 0’-8" 3’-7"4’-3"#4E5 234 Horiz. top
839 LBSSUBTOTAL
B
STR
TYPE 2
A G
B
B
C
D
OPTIONAL LEG
TYPE 17
12 12
N
C A \e r f o n (1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g r e b a r .d g n
RG3244-
CA
FRAZIER CREEK BRIDGE
JULY 2022
FRAZIER CREEK BRIDGE
ERFO PLUMAS NF 23N18(1)
CA ERFO PLUMAS NF 23N18(1)
FRAZIER CREEK BRIDGE T2
Roxannie Gonzalez (Design) Text Box
CA
Roxannie Gonzalez (Design) Text Box
ERFO PLUMAS NF 23N18(1)
FRAZIER CREEK BRIDGE
Roxannie Gonzalez (Design) Text Box T3
| S_sheets.pdf |
| rg3244 pe |
| rg3244 gn |
| rg3244 foundation |
| rg3244 borings |
| rg3244 riprap |
| rg3244 grs wall |
| rg3244 grs wall |
| rg3244 grs wall |
| rg3244 abut |
| rg3244 typical |
| rg3244 rail |
| rg3244 rebar |
File details come from the government source that posted it. Updated .