This bid opening summary is for the CA ERFO PLUMAS NF 23N18(1) Frazier Creek Bridge project. The project involves replacing the Frazier Creek Bridge in Plumas National Forest that was damaged by fire in 2020. A prefabricated steel bridge will be fully replaced along with reconstructing up to 150 feet of roadway approaches on either end of the bridge. The bridge and a short section of approaches will also be asphalt overlaid to reduce sediment runoff. The scope of work includes the bridge, guardrails, and roadway work. Seven contractors submitted bids with a low bid of $2,365,336 from Genesis Design & Development and a high bid of $3,376,376 from Steelhead Constructors. The engineer's estimate was $1,877,000. Bid awards remain subject to verification by the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: CA ERFO PLUMAS NF 23N18(1) Project Number: Frazier Creek Bridge Bid Opening Date: 11/01/2022 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Sheri Walsh
Amendments: (1) 10/25/2022 (2) _____________(3) (4)
Bidder’s Name Schedule A BID TOTAL 1.
Genesis Design & Development, LLC Rio Rancho, NM
$2,365,336.00 $2,365,336.00
2.
Steelhead Constructors Palo Cedro, CA
$3,376,376.00 $3,376,376.00
3.
4.
5.
6.
7.
Engineer’s Estimate
$1,877,000.00
*All bids are subject to verification.