C8 N4523A26Q1001 YT-810 Attachment 8 Growth Management Request Form.docx
DOCX document 28 KB Posted
- Attached to
- Maintenance, Repair, and Preservation of YT-810
- Solicitation number
- N4523A26Q1001
About this file
This document is a Growth Management Request Form for contract N4523A26Q1001, related to the maintenance and repair of YT-810, a Harbor Tug Medium located at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. The form provides a template for documenting growth management processes, including spaces for detailing statement of work requirements, contractor estimates, labor hours, material costs, and negotiated pricing. While the form itself does not specify exact details of the work, it is connected to a solicitation for maintenance, repair, and preservation of the vessel involving underwater hull preservation, deck repairs, system testing, and component replacements.
The associated federal contract opportunity requires a contractor facility in the Puget Sound, WA region capable of accommodating a 90 FT length harbor tug. Specific work includes vessel cleaning, zinc anode replacement, blasting and preserving hull and deck surfaces, ultrasonic and visual inspections, repairs to hull valves and deckhouse, tank system testing, lighting repairs, and hydraulic hose replacements. The contract is a Firm-Fixed-Price arrangement with the Department of the Navy Naval Supply Systems Command, focusing on comprehensive maintenance and restoration of the YT-810 vessel.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A26Q1001 Growth Management Request Form
| Request Number: |
| Ship/Hull: |
| SOW Para(s): |
| CFR Number(s): |
YT-810
| Prepared by COR: | Date: | |||
| Period of Performance: | to | CLIN(s) | ACRN: | |
| Growth Management Process Utilized |
N/A Small Dollar Value Growth
Authorized N/A of N/A
X Level Of Effort (LOE) to Completion
1. Statement of Work Requirements:
1.1 Scope:
1.2 Location of Work:
2. References:
3. Requirements:
4. Government Furnished Material (GFM):
Price for Statement of Work Requirements Small Dollar Value Growth Pre-Priced Amount per Occurrence $__N/A_____
OR
LOE to Completion:
Contractor proposal for work under this request must be completed with the current period of performance unless a schedule revision is included in the terms.
| Contractor Estimate: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
| Negotiated Price: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
Total price calculations are based upon the formulary established for work items in the base contract; see rates contained under Section B, Note C of the contract.
Agreement to Negotiated Price:
Date:
PSNS Project Manager / Agreement to Negotiated Amount
Date:
Contractor Representative / Agreement to Negotiated Amount
| Date: | ||
| PSNS Contracting Officer / Agreement to Negotiated Amount | Growth Mgmt. Effective Date |
Final Acceptance / Completion of Work Signatures:
Date:
Contractor Representative
Date: