C6 Attachment 2 - Schedule of Items_4.23.2026.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 1240LT26Q0061
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items pricing document for a construction project at Arapaho and Roosevelt National Forests and Pawnee National Grassland, specifically for Building 97 heat cable and snow retention installation dated April 23, 2026. The base contract (CLIN 0001) includes four line items: mobilization, North Side heat cable installation (approximately 250 linear feet on gutters, downspouts, and roof in serpentine pattern with dedicated electrical system reconditioning), South Side heat cable installation (identical scope to North Side), and installation of S-5 Colorgard 2.0 metal roof snow guards on both North and South building elevations. All work must comply with city, county, and state local codes, with SB-190 or equivalent waterproofing material required during and after installation. The optional item (CLIN 1001) includes soffit repair to replace approximately 200 square feet of damaged soffit with matching material and color.
All pricing fields display $0.00, indicating this is a blank pricing template awaiting vendor submission. Individual line-item prices must be rounded to the nearest whole dollar with no cents included, and the total must equal the sum of individual line items. The solicitation (1240LT26Q0061) is issued by the Department of Agriculture Forest Service for a project valued between $25,000 and $100,000, classified under PSC Code 5650 (Roofing and Siding Materials) and NAICS Code 238210 (Electrical Contractors and Other Wiring Installation Contractors), with a small business size standard of $19 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
Arapaho and Roosevelt National Forests and Pawnee National Grassland PROJECT TITLE: GAOA SMV Building 97 Heat Cable and Snow Retention Schedule of Items Date: 4.23.2026
| Vendor Name: | |||
| UEI: | |||
| Item | |||
| No. | Description | Method of | |
| Measurement | Quantity | Unit | |
| Price | Total | ||
| CLIN 0001 |
BASE ITEMS
| 1 | Mobilization | LSQ | 1 | $0.00 | $0.00 |
| 2 | North Side Heat Cable Install - Install approximately 250 LNFT of heat cable on North side gutter and downspout, with the remaining length following a serpentine pattern on roof. This item includes reconditioning of electrical system to sustain this heat cable system separately from other heat cable systems and the rest of electricity to the building, meeting city, county, and state local codes. SB-190 (or equivalent) shall be used to waterproof roof as necessary during and after installation. | LSQ | 1 | $0.00 | $0.00 |
| 3 | South Side Heat Cable Install - Install approximately 250 LNFT of heat cable on South side gutter and downspout, with the remaining length following a serpentine pattern on roof. This item includes reconditioning of electrical system to sustain this heat cable system separately from other heat cable systems and the rest of electricity to the building, meeting city, county, and state local codes. SB-190 (or equivalent) shall be used to waterproof roof as necessary during and after installation. | LSQ | 1 | $0.00 | $0.00 |
| 4 | Snow Retention Guards - Install S-5 Colorgard 2.0 metal roof snow guards (or approved equivalent) on both North and South sides of the building. | LSQ | 1 | $0.00 | $0.00 |
| TOTAL CLIN 0001 BASE ITEMS | $0.00 |
| Item | |||
| No. | Description | Method of | |
| Measurement | Quantity | Unit | |
| Price | Total | ||
| OPTION CLIN 1001 |
OPTION ITEM
| 1 | Soffit Repair - Replace approximately two hundred (200) square feet of damaged soffit with soffit that matches material and color (or approved equivalent) | AQ | 200 SQFT | $0.00 | $0.00 |
| TOTAL OPTION CLIN 1001 | $0.00 | ||||
| TOTAL BASE CLIN 0001 & OPTION CLIN 1001 | $0.00 |
| NOTES: |
| All individual line-item pricing provided shall be rounded up to the nearest whole dollar, do not include cents, the total pricing should equate to the individual line-item amounts. |
File details come from the government source that posted it. Updated .