C200635 - AS-IS Construction Inspection Program Bid Sheet.pdf
PDF 79 KB Posted
- Attached to
- As-Is and Construction Inspection Process Map
- Solicitation number
- C200635
About this file
This is a blank cost estimate bid sheet template for Work Request C200635, a construction renovation project at the Bethesda Campus. The template is structured to capture detailed cost breakdowns across 16 construction divisions, including General Requirements (with staffing for Project Director, Senior Project Manager, Junior and Senior Electrical Engineers, and Estimator), Site Construction, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal/Moisture Protection, Doors/Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Mechanical, and Electrical.
The form includes sections for overhead, profit calculations, and a final Total Estimated Project Development Cost. While the template provides the structure for detailed cost estimation, no actual costs are filled in, with only a $0 subtotal shown in the Facility Cost Estimate section. The project is identified as Work Request Number C200635, categorized as a Construction project type with Renovation extent of work, though the total area of work is listed as N/A.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| As-Is Construction Map RFI Responses.pdf | ||
| 75N99025R00006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order
Element Project Identification Work Request Number: C200635 Project Title: Project Name Location: Bethesda Campus Contractor Name:
Project Details Date of Estimate:
Project Type Construction Extent Of Work: Renovation Total Area of Work (GSF): N/A
Facility Cost Estimate Factor Subtotal $0
Construction Division 01 — General Requirements
Project Director Senior Project Manager Junior Electrical Engineer Senior Electrical Engineer Estimator
Division 02 — Site Construction Division 03 — Concrete Division 04 — Masonry Division 05 — Metals Division 06 — Wood, Plastics, and Composites Division 07 — Thermal and Moisture Protection Division 08 — Doors and Windows Division 09 — Finishes Division 10 — Specialties Division 11 — Equipment Division 12 — Furnishings Division 13 — Special Construction Division 14 — Conveying Systems Division 15 — Mechanical Division 16 — Electrical
Sub-total
Overhead Sub. Total Profit
Total Estimated Project Development Cost:
Estimated Cost Bid Sheet(Summary)
Bid Sheet