About this file
This document is an attachment called "Proposed Distribution of Work" for a joint venture opportunity. It requires offerors to provide the percentage of work expected to be performed by each member of the joint venture and any proposed key subcontractors.
The related federal contract opportunity is for the installation of a ductless split unit HVAC system at Building 82. The solicitation is issued by the Naval Sea Systems Command (NAVSEA) and is 100% set aside for small businesses. The work includes installing a new 4-ton ductless split unit system with 4 indoor units, installing new air diffusers, and removing two existing portable air conditioners at locations in Keyport, WA and Naval Base Kitsap - Bangor, Silverdale, WA.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025324Q00420003.pdf | ||
| C24_N0025324Q00420002.pdf | ||
| C24_N0025324Q00420001.pdf | ||
| C12_Att_05_Past Performance References.docx | DOCX document | |
| C12_Att_01_material_equip_in-place_list.xlsx | XLSX spreadsheet | |
| C12_Att_11_Wage_Determination.pdf | ||
| C12_Att_08_OPSEC Guide for Defense Contractors_2016.pdf | ||
| C12_N0025324Q0042.pdf | ||
| C12_Att_07_OSHA-Calculating Injury and Illness Incident Rate.pdf | ||
| C12_Att_10_Safety Requirements for Contractors and Sub (30 AUG 2021).pdf | ||
| C12_Att_09_Contractors Guide to Env Compliance 2019 Rev1.docx | DOCX document | |
| C12_Att_04_bid form.docx | DOCX document | |
| C12_Att_06_Safety Data Sheet.docx | DOCX document | |
| C12_Att_02_PPI Form.docx | DOCX document | |
| C12_Att_03_sched_of_values.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT JL.2
Proposed Distribution of Work
Offerors shall include the percentage of work expected to be performed by each member of a Joint Venture and each proposed key subcontractor, as applicable.
Prime _______%
Joint Venture
| Company A | _______% (if applicable) |
| Company B | _______% (if applicable) |
Key Subcontractor (provide firm’s name) ` _______% (if applicable) Key Subcontractor
| (provide Firm’s name) | _______% (if applicable) | |
| Total | 100 % |
NOTE: DISTRIBUTION OF WORK SHALL EQUAL 100%
EXAMPLE: For JV Prime
Prime _______%
Joint Venture
| Company A-Firm ABC | 70 % (if applicable) |
| Company B- Firm Z | 30 % (if applicable) |
Total 100 %