C12_Att_08-Bid_Form.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Annex LED Lighting Federal contract opportunity
- Solicitation number
- N0025325Q0012
About this file
The document is a Bid Form for a Naval Base Kitsap LED lighting upgrade project (Solicitation Number: N0025325Q0012) located in Keyport, WA. The solicitation requires a contractor to perform lighting alterations in 6 buildings, including installing combination exit sign-emergency lights, demolishing existing interior lighting fixtures, replacing them with LED strip light fixtures, adding an additional lighting row, and replacing fluorescent T8 lamps and ballasts with LED components.
The project is a small business set-aside with a government estimate ranging from $150,000 to $250,000, targeting an award date of August 4, 2025. The contract will be awarded under NAICS code 238190 with a small business size standard of $19.0 Million. The Department of the Navy Naval Sea Systems Command will evaluate proposals using Low Price Technically Acceptable factors, and potential bidders must be registered in the System for Award Management (SAM) database. Inquiries should be directed to michelle.a.farrales.civ@us.navy.mil and james.k.wasson.civ@us.navy.mil.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C26_WA20250109_20250606_Mod3.pdf | ||
| C24_N0025325Q00120001.pdf | ||
| C11b_Att_02_WD_WA20250109_03072025.pdf | ||
| C11_N0025325Q0012.pdf | ||
| C12_Att_10-Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_01-Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_04-Bnr_Contractors_Guide_January_2020.pdf | ||
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C11d_Att_07-Past_Performance_References.docx | DOCX document | |
| C12_Att_09-PPI_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025325Q0012 | Contractor: | |
| PID Description: | Annex Mult. Bldg LED Lighting Upgrade | Date: | |
| Project Location: | Naval Base Kitsap, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| Annex Mult. Bldg LED Lighting Upgrade | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |
File details come from the government source that posted it. Updated .