C12_Att_08_Bid_Form.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Replace Restroom Doors
Solicitation number
N0025325Q0009
Issued by

About this file

The file is a Bid Form for Solicitation Number N00253, designed for a construction project at Naval Base Kitsap in Keyport, WA. The bid form provides a detailed template for contractors to submit pricing information, including line items for materials, labor, equipment, and associated costs. The form includes example rows demonstrating how to break down project components, such as air handler installation, with specific instructions to leave formulas intact and provide sufficiently detailed descriptions to enable technical and price evaluation.

The related federal contract opportunity is a small business set-aside solicitation (N0025325Q0009) for replacing two restroom doors and frames at the Naval Undersea Warfare Center Division Keyport. The project involves installing new steel doors, repairing drywall, and painting to match existing colors. The government estimates the project value between $15,000 and $50,000, with a target award date of June 10, 2025. The solicitation falls under NAICS code 238350 for Finish Carpentry Contractors, will be awarded as a firm fixed-price construction contract, and will use Low Price Technically Acceptable evaluation criteria.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N00253<>Contractor:
PID Description:Date:
Project Location:Naval Base Kitsap, Keyport, WA
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
0
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount