C12_Att_01_Material_Equipment_In_Place_List.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Replace Restroom Doors Federal contract opportunity
Solicitation number
N0025325Q0009
Issued by
Department of the Navy Naval Sea Systems Command

About this file

The file C12_Att_01_Material_Equipment_In_Place_List.xlsx is an inventory spreadsheet documenting installed equipment for a naval facility renovation project. The spreadsheet details specific assets including a breathing air filter and carpet, with comprehensive metadata such as asset numbers, quantities, replacement costs, manufacturer details, serial numbers, and installation dates. Each entry includes specific information like location (building and room numbers), vendor contact information, and equipment specifications.

The associated federal contract opportunity (Solicitation N0025325Q0009) is for replacing restroom doors at the Naval Undersea Warfare Center Division in Keyport, WA. The small business set-aside solicitation covers replacement of two existing restroom doors and frames, drywall repair, and painting, with a government estimate ranging from $15,000 to $50,000. The target award date is June 10, 2025, using Low Price Technically Acceptable evaluation factors under FAR Part 13 and 36, with the NAICS code 238350 for Finish Carpentry Contractors. Interested offerors must be registered in SAM and can direct inquiries to specified Navy contact emails.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Restroom Doors, newest first.
File Type Posted
C24_N0025325Q00090001.pdf PDF
C26_ SOW_REV1.pdf PDF
C12_Att_04_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf PDF
C12_Att_03_Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
C12_Att_05_OPSEC_Guide_for_Defense_Contractors.pdf PDF
C12_Att_06_Schedule_of_Values.xlsx XLSX spreadsheet
C11b_Att_02_WD_WA20250109_03072025.pdf PDF
C12_Att_09_PPI_Form.docx DOCX document
C12_Att_10_Safety_Data_Sheet.docx DOCX document
C12_Att_08_Bid_Form.xlsx XLSX spreadsheet
C11_N0025325Q0009.pdf PDF
C12_Att_11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C11d_Att_07_Past_Performance_References.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:
Project Title:Bldg. 1 Repair Restroom Doors
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .